100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Asbestos Practice Exam III Questions With 100% Correct Answers |Latest Version 2025/2026 (Graded A+)

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
26-11-2025
Written in
2025/2026

Asbestos Practice Exam III Questions With 100% Correct Answers |Latest Version 2025/2026 (Graded A+) You are conducting an air sample using TEM. You draw 2000 liters through each filter at 5 liters per minutes. You collect 6 samples. Is this ok? - answer-Not enough volume. min of 5 samples- ok To confirm the presence of asbestos when bulk sampling, what might sometimes be required? - answerAn x-ray defraction Building personnel should _____ to eliminate unnecessary worry and tension - answer-answer basic questions of occupants What requirements must the contractor have in order to bid or perform any abatement project? - answer-Be licensed in California under BPC Chapter 9, Div. 3. An officer of the company shall sign and bidders shall submit a statement which contains a listing of any asbestos related legal proceedings and claims in which the contractor has participated or is involved. This must include descriptions of the _____ and _______ and resolution to date. - answer-Role and issue Projects, dates, and reasons for terminations shall be submitted by all bidders and _____ for situationsin which an asbestos related contract has been terminated - answer-signed by an officer of the company Plastic used on floors and for floor coverings should be what size? - answer-6 mi On carpeted floors, how many laters of plastic should be used - answer-at least 2Air sampling should be taken - answer-after passing visual inspection The quality control sample should be tested - answer-at another laboratory All of the following is an abbreviation for one of the three methods except - answer-PRM Any asbestos related work involving _____ square feet or more of surface asbestos containing materials requires special certification - answer-100 square feet During removal of asbestos from ceilings - answer--protective clothing and a respirator should be worn -floors, alls, windows and doors should be sealed witha double layer of 6 mil plastic sheeting. -the asbestos containing material should be thoroughly wetted

Show more Read less
Institution
Asbestos
Course
Asbestos









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Asbestos
Course
Asbestos

Document information

Uploaded on
November 26, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
sarahNkalu West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
16
Member since
1 year
Number of followers
0
Documents
1837
Last sold
3 days ago
KnowledgeNest

Reliable study materials for fast and effective revision with 100% Guaranteed pass

4.4

5 reviews

5
4
4
0
3
0
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions