100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Stationary Engineer Exam Questions and Correct Answers

Rating
-
Sold
-
Pages
69
Grade
A+
Uploaded on
26-11-2025
Written in
2025/2026

Stationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct AnswersStationary Engineer Exam Questions and Correct Answers

Show more Read less
Institution
Stationary Engineer
Course
Stationary Engineer











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Stationary Engineer
Course
Stationary Engineer

Document information

Uploaded on
November 26, 2025
Number of pages
69
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1 | Page



Stationary Engineer Questions and Correct
Answers
How much clearance from the top of the boiler is needed for a HP
boiler that produces 70000 lbs of steam? Ans: 7 feet

On a gas fired boiler what is the proper gas to air mixture Ans:
30%-70% and in special arrangements it can be as high as 100% .
ANSWER CHAPTER 11 remember%

What is the total hardness in a system that was found to have
calcium hardness of 60ppm and magnesium hardness of 18ppm
and carbon hardness of 12 ppm? Ans: TH=(Ca x 2.5) + (Mg x
4.1)\nTH=(60 x 2.5) + (18 x 4.1)\nTH= 150+73.8 =( 223.8 PPM)

How often should a complete external inspection of the boiler be
done? Ans: Once a Shift

With 24 hr operation how often do you check the water level? Ans:
Once per shift

How often do you check the LWCO? Ans: Once per shift

How often do you check the High Limit Switch? Ans: Annually




© 2025 All rights reserved

, 2 | Page


A 2" pipe was found to be delivering water at 100 psia at 1040ft
per second. How many gallons per hour will it deliver? Ans: GPM=
V (diameter squared) divided by .4085 ANSWER pg 469 BOG

What controls the amount of blowback on a safety valve? Ans:
Blowback ring or adjusting ring

On a open air expansion tank hot water boiler system; how high
should it be mounted? Ans: (4 Feet ) above the highest heating
element.

What is the minimum top clearance of boilers with manholes? Ans:
5 feet

Package boilers; steam heating boilers and hot water heating
boilers shall have a minimum clearance of? Ans: 2 feet from
ceiling. Code chapter 10 page76

Most important safety device on a boiler? Ans: Safety relief valve

What does a Black Liquor Boiler do? Ans: Black Liquor is the by
product of wood pulp processing in the paper making industry.

What does Black liquor boiler known for? Ans: Steam generation
and recovery of soda ash

Maximum line voltage for control on a boiler? Ans: 150 volts



© 2025 All rights reserved

, 3 | Page


Under what code are boilers designed and constructed? Ans:
ASME- CSD 1

How many low water cut offs are needed per code for a hot water
system when a boiler has inputs greater than 400,000 btu per hr
Ans: 1 LWCO is needed.

What is the minimum and maximum size for a safety valve per
code for boilers? Ans: Minimum 3/4" and Maximum 4 1/2"

What stamp is put on a boiler after repairs? Ans: "R"

What is the equalizing system used for? Ans: The equalizing
system is for warming up the steam lead.

A blowdown valve is located at the lowest water space of a boiler
for three purposes Ans: 1. to remove precipitated sludge or loose
scale \n2. To permit rapid lowering of the boiler water if it has
become too high accidentally \n3. As a means of removing water
from the boiler so that fresh water may be added to keep the
concentration of solids below the point where difficulties may be
experienced.

In the old power boiler which type of feed-water regulators were
not used? Ans: Electronic

After opening a boiler for repairs how much oxygen is needed?
Ans: 19%

© 2025 All rights reserved

, 4 | Page


What is the first thing you do when shutting down a boiler? Ans:
Turn off (extinguish fire)

What is the legal limit of acceptable asbestos particles ? Ans: 0.1
fibers per cubic centimeter

What is CREEP? Ans: Creep is defined as the slow deformation of
material with time; with the deformation taking place at elevated
temperatures with no increase in stress.

What is the BTU content of Anthracite coal? Ans: 14000 btu/lb

What substance transfers electrical current in a photocell? Ans:
Electricity will flow when the CADMIUM is exposed to sufficient
light.

What device acts as a check valve in both directions and keeps
pumps primed? Ans: FOOT VALVES are used for pumps under
suction pressure to prevent backflow primed? on the suction line.

What protects boilers from explosion in the furnace? Ans: A flame
guard system is an arrangement of flame detection system;
interlocks; and relays which will sense the presence of a proper
flame in a furnace and cause fuel to be shut off to the furnace if a
hazardous condition develops (improper flame or combustion).

What size pipe is used as a header in a boiler operating at 100psi?
Ans: 6 inches

© 2025 All rights reserved

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Graders Chamberlian School of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
491
Member since
2 year
Number of followers
167
Documents
25150
Last sold
1 day ago
Study Smart

Your one-stop resource for high-quality, exam-focused study materials. Here, you'll find expertly crafted summaries, past exam papers, notes, and assignments tailored to help you succeed in your courses. Every document is written with clarity, accuracy, and exam performance in mind—saving you hours of studying and helping you boost your grades. ✅ Clear and well-structured content ✅ Covers key exam topics and common questions ✅ Trusted by students for academic success ✅ Instant downloads and affordable prices Whether you're cramming for finals or just staying ahead in class, my materials are designed to make your studying smarter, not harder. Take a look around and get the edge you need!

Read more Read less
3.8

120 reviews

5
53
4
26
3
21
2
4
1
16

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions