Describe the equipment and components of a contingency wastewater collection
system
Give this one a try later!
, Grey water- water from laundry, showers, hand washing
Black water- water contaminated with waste
Deployable latrine: 275ppl. 1,500 gal tank. Emptied daily
Main components: sewage ejector systems, macerator pump lift station,
dual pump lift station, and 25k gallon wastewater collection tank
Septic tank and drain field- empty 3-5 years
Describe the basic guidelines of beddown planning
Give this one a try later!
Holistic Planning: - Mission & Intel
- Existing Infrastructure
- Local Environmental Conditions
Discuss the process to select which sample units to inspect from the pavement
section.
Give this one a try later!
•PCC Sample Units
--> 20 contiguous slabs (+8 slabs)
•ACC Sample Units
--> 5,000 contiguous square feet (+2,000 SF)
Explain how UTCs are sourced for AEF deployment taskings
Give this one a try later!
, DW- worldwide available
DX-can be reached into
DP- ask to task
Describe the limitations of the PCI
Give this one a try later!
•A section's rating is based on a portion of the pavement
•PCI based upon observations of surface distresses only
--> NOT A structural evaluation!
--> May not identify issues deeper within the pavement structure
Describe contingency power generation assets and their ratings
Give this one a try later!
Bear Power Unit, MEP-12A (4160 V line to line voltage in three phase)
Explain how protecting natural / cultural resources enhances mission capability
Give this one a try later!
- Shows respect
- Preserves antiquities
- Fosters good will
- Maintains cultural identity
, Identify distresses commonly observed in contingency environments
Give this one a try later!
ACC:
Potholes/Delamination
Craters & Spalls
Inadequate Repairs
Old/Thin/Brittle Pavement
PCC:
Craters/Spalls
Inadequate Repairs
Identify the history and timeline of when Basic Expeditionary Airfield Resources
(BEAR) assets are typically used
Give this one a try later!
Combined the focus of engineering capability and logistic capability
Gray Eagle - Harvest Eagle Assets- Harvest Eagle Concept- Harvest Falcon
Assets- Basic Expeditionary Airfield Resources (BEAR) BEAR order of battle
(BOB)
Describe the roles of Civil Engineers within an EOC
Give this one a try later!
system
Give this one a try later!
, Grey water- water from laundry, showers, hand washing
Black water- water contaminated with waste
Deployable latrine: 275ppl. 1,500 gal tank. Emptied daily
Main components: sewage ejector systems, macerator pump lift station,
dual pump lift station, and 25k gallon wastewater collection tank
Septic tank and drain field- empty 3-5 years
Describe the basic guidelines of beddown planning
Give this one a try later!
Holistic Planning: - Mission & Intel
- Existing Infrastructure
- Local Environmental Conditions
Discuss the process to select which sample units to inspect from the pavement
section.
Give this one a try later!
•PCC Sample Units
--> 20 contiguous slabs (+8 slabs)
•ACC Sample Units
--> 5,000 contiguous square feet (+2,000 SF)
Explain how UTCs are sourced for AEF deployment taskings
Give this one a try later!
, DW- worldwide available
DX-can be reached into
DP- ask to task
Describe the limitations of the PCI
Give this one a try later!
•A section's rating is based on a portion of the pavement
•PCI based upon observations of surface distresses only
--> NOT A structural evaluation!
--> May not identify issues deeper within the pavement structure
Describe contingency power generation assets and their ratings
Give this one a try later!
Bear Power Unit, MEP-12A (4160 V line to line voltage in three phase)
Explain how protecting natural / cultural resources enhances mission capability
Give this one a try later!
- Shows respect
- Preserves antiquities
- Fosters good will
- Maintains cultural identity
, Identify distresses commonly observed in contingency environments
Give this one a try later!
ACC:
Potholes/Delamination
Craters & Spalls
Inadequate Repairs
Old/Thin/Brittle Pavement
PCC:
Craters/Spalls
Inadequate Repairs
Identify the history and timeline of when Basic Expeditionary Airfield Resources
(BEAR) assets are typically used
Give this one a try later!
Combined the focus of engineering capability and logistic capability
Gray Eagle - Harvest Eagle Assets- Harvest Eagle Concept- Harvest Falcon
Assets- Basic Expeditionary Airfield Resources (BEAR) BEAR order of battle
(BOB)
Describe the roles of Civil Engineers within an EOC
Give this one a try later!