100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NABCEP BATTERY FOCUS NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
25-11-2025
Written in
2025/2026

NABCEP BATTERY FOCUS NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
NABCEP PV ASSOCIATE
Course
NABCEP PV ASSOCIATE









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NABCEP PV ASSOCIATE
Course
NABCEP PV ASSOCIATE

Document information

Uploaded on
November 25, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NABCEP BATTERY FOCUS
A battery machine inverter with 120 volt output is permitted to be connected to a one hundred
twenty/240 volt AC panel. What need to be gift for this to be code compliant? - ANS-a. A jumper
from section to section

c. The supply ID of the power deliver.

B. A warning sign "Single 120v circuits, do now not join multi-cord department circuits"

d. A, B and C

ANSWER:

D

Absorption Charging - ANS-Once almost charged, present day regulations are required to
prevent the battery from overcharging.

Absorption charging reduces the price modern to hold the battery voltage at a law voltage for a
positive time frame.

Usually lasts 1 to a few hours and adds another 10 to 15% to capactiy

Ampere-Hour Integrating Charge Controller - ANS-Regulates present day glide based totally on
present quantity of overcharge

*overcharge is ration of enter Ah to AH price in battery

An off grid customer is located at 35°N with a 5kW PV array tilted at forty five° and the system is
working at 70% conversion performance. He complains that he needed to replace the battery
financial institution after most effective 5 years of use. When checking the system size in
opposition to the patron hundreds you locate:

Daily loads for crucial layout months of December and January are each 300kWh with a load
fraction of eighty%; the solar Insolation (sun hour) for those months is round three.Five. The
battery financial institution ability is 20kWh and located in the barn. What is the hassle?

A. PV array is too small

c. The location of the battery financial institution is horrific

b. The battery financial institution is too small

, d. The tilt of the PV array is terrible - ANS-ANSWER:

B
The PV array is most excellent: 300kWh ÷ 30 days ÷ 3.5 sun hours ÷ .70 conversion efficiency =
4.08 x 120% = 4.9kW PV array.
The battery financial institution must be sized for 20% common intensity of discharge:
Daily load = three hundred ÷ 30 days = 10kWh ÷ 20% = 50kWh x 80% load fraction = 40kWh
The battery financial institution will be better positioned but with out similarly records it's hard to
know.
The 45° tilt for this range is premiere for an off grid PV system

Array Reconnect Setpoint - ANS-This is the voltage degree that tells the Charge Controller to
reconnect the battery to the array for charging

Average Battery Charging Losses - ANS-2% to 10% relying on DOD

Average Depth of Discharge Calculations - ANS-Max DOD / Days of Autonomy x Load Fraction

Battery Bank Size Calculations

? Four x Average Daily Load) = 25% Daily Depth of Discharge - ANS-Daily kWh x Days of
Autonomy / Max DOD%

Battery Based Inverters have to be sized to address what two things? - ANS-1) Instantaneous
Load (plus?)
2) Surge Load

Bulk Charging - ANS-Battery Charging at a enormously high fee charge that expenses the
battery up to law. Usually approximately 80 to 90 percentage.

Charge Acceptance - ANS-The ratio of the increase in battery fee to the quantity of fee provided
to the battery

Regulated through the fee controller

Charge Rate in Battery - ANS-(Rated Amp-Hour Capacity) x (80%) / (5 Hours) = Max Charging
Amps C/5 rating

Charge Regulation Set Point: High Voltage - ANS-Inhibits charging of batteries

Charge Regulation Set Point: Low Voltage - ANS-Allows battery charging

Common call for Buck/Boost Direct Current Converters - ANS-MPPT Charge Controllers

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LegitPage Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
79
Member since
1 year
Number of followers
24
Documents
1645
Last sold
1 month ago

Welcome to LegitPage ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

4.3

16 reviews

5
10
4
2
3
3
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions