What size LDA must comply with stormwater management
regulation? in CPBA areas? - CORRECT ANSWER-anything of 1 acre
or more, or 2500 ft^2 in CPBA areas; may be more stringent
locally.
what are some activities exempt from SWM regulations? -
CORRECT ANSWER-mining, agriculture, sewer discharges, local
reclamation programs, routine maintenance of preexisting
operations, public emergency activity
what term basically means a plea deal for stormwater
offenders? - CORRECT ANSWER-consent order, which replaces
penalties with fines.
how long does VSMP authority have to review SWM plan? -
CORRECT ANSWER-15 days to review and determine approval, and
notify applicant.
How often must a VSMP authority inspect an LDA? - CORRECT
ANSWER-Periodically.
, all SWPPP requirements may be met by - CORRECT ANSWER-
incorporating other plans into reference, or by developing
missing elements.
What must the DEQ issue to an operator before an LDA? -
CORRECT ANSWER-a construction GP
How soon after final grade of a site must vegetation be put in
place? - CORRECT ANSWER-within 7 days.
How long must operator keep routine inspection reports? -
CORRECT ANSWER-At least 3 years after the GP expires/terminates.
How long does operator have to revise SWPPP if authority
deems it necessary? How long does local authority have to
review any modifications to SWPPP? - CORRECT ANSWER-7 days for
operator to make changes, 60 days for authority to review
changes.
How long does operator have to notify DEQ of an unauthorized
discharge? How long does operator have to make a written
report of this? - CORRECT ANSWER-within 24 hours of discovery for
notification, within 5 days for written acknowledgement.
What constitutes a measurable rain event according to GP? -
CORRECT ANSWER-0.25 in. or more over 24 hours.