MGSC 485 Exam 3 Questions with Correct Answers Latest Update 2025/2026 Name the 8 major wastes - Answers defects, over production, waiting, non-utilized resources, transportation, inventory, motion, excess process (DOWNTIME) Value Stream Mapping is Based on 2 ideas: - Answers system wide view, visualizing VSM is - Answers flow kaizen Product quantity analysis (PQA) - Answers start here to determine if part volumes make the choice obvious Product routing analysis (PRA) - Answers use if product-quantity analysis is inconclusive; based on finding a common equipment and information flow as viewed from customer perspective Mapping the Value stream to Identify Flow Kaizen Opportunities - Answers 1. Select product family 2. Draw a current state 3. Draw a future state 4. Develop work plan and implement The perfect state - Answers completely continuous flow; production lead time so short that one can make-to-order What are the steps to identify flow kaizen opportunities? - Answers select product family, draw a current state, draw future state, develop work plan and implement Finding Process lead time - Answers Approx. cycle time in seconds or value-added time in seconds if process lead time longer than cycle time, use longest time if parallel branches. Sum value-added and lead time at end of flow VSM Map Design - Answers Customers: upper right Processes: left to right on bottom Inventory: between processes (as needed) Process Cycle Efficiency - Answers Total Process or value added time/Total Production lead time Littles Law - Answers I = R x T R= Production (in units/day) T= Flow time (days) C/O on VSM meaning - Answers Change over time C/T on VSM meaning - Answers Cycle time products that go through common steps and consume common resources for most part. - Answers product family What is VSM always drawn for? - Answers Product Family When should product-routing technique be used? - Answers If product-quantity analysis is inconclusive (e.g., less than an 80:20 ratio between quantity and parts) When should customer-specific routing technique be used? - Answers If firm makes similar parts for a variety of customers, each having unique specifications (GE, Sony, and LG product families) When should problem-specific routing technique be used? - Answers If specific part type is experiencing aberrant problems or needs time or quality improvement Characteristics of a lean value stream system - Answers 1. Produce to takt time 2. Develop continuous flow, or if cannot, use supermarkets to control production 3. Send customer schedule to only one process 4. Distribute production of products evenly 5. Create "initial pull" by withdrawing small, consistent increments 6. Develop ability to make "every part every day" Take time - Answers available working time/customer demand When do use super markets? - Answers Control production-where continuous flow does not extend upstream What type of system is a supermarket? - Answers Pull system Alternatives to a Supermarket - Answers FIFO, Sequence Pull Using only one schedule process in pull system is a ____ process - Answers pacemaker Pitch - Answers increment of work (take time x pack size)

Content preview

MGSC 485 Exam 3 Questions with Correct Answers Latest Update 2025/2026

Name the 8 major wastes - Answers defects, over production, waiting, non-utilized resources,
transportation, inventory, motion, excess process (DOWNTIME)

Value Stream Mapping is Based on 2 ideas: - Answers system wide view, visualizing

VSM is - Answers flow kaizen

Product quantity analysis (PQA) - Answers start here to determine if part volumes make the
choice obvious

Product routing analysis (PRA) - Answers use if product-quantity analysis is inconclusive; based
on finding a common equipment and information flow as viewed from customer perspective

Mapping the Value stream to Identify Flow Kaizen Opportunities - Answers 1. Select product
family

2. Draw a current state

3. Draw a future state

4. Develop work plan and implement

The perfect state - Answers completely continuous flow; production lead time so short that one
can make-to-order

What are the steps to identify flow kaizen opportunities? - Answers select product family, draw a
current state, draw future state, develop work plan and implement

Finding Process lead time - Answers Approx. cycle time in seconds or value-added time in
seconds if process lead time longer than cycle time, use longest time if parallel branches.



Sum value-added and lead time at end of flow

VSM Map Design - Answers Customers: upper right

Processes: left to right on bottom

Inventory: between processes (as needed)

Process Cycle Efficiency - Answers Total Process or value added time/Total Production lead
time

Littles Law - Answers I = R x T

, R= Production (in units/day)



T= Flow time (days)

C/O on VSM meaning - Answers Change over time

C/T on VSM meaning - Answers Cycle time

products that go through common steps and consume common resources for most part. -
Answers product family

What is VSM always drawn for? - Answers Product Family

When should product-routing technique be used? - Answers If product-quantity analysis is
inconclusive (e.g., less than an 80:20 ratio between quantity and parts)

When should customer-specific routing technique be used? - Answers If firm makes similar
parts for a variety of customers, each having unique specifications (GE, Sony, and LG product
families)

When should problem-specific routing technique be used? - Answers If specific part type is
experiencing aberrant problems or needs time or quality improvement

Characteristics of a lean value stream system - Answers 1. Produce to takt time

2. Develop continuous flow, or if cannot, use supermarkets to control production

3. Send customer schedule to only one process

4. Distribute production of products evenly

5. Create "initial pull" by withdrawing small, consistent increments

6. Develop ability to make "every part every day"

Take time - Answers available working time/customer demand

When do use super markets? - Answers Control production-where continuous flow does not
extend upstream

What type of system is a supermarket? - Answers Pull system

Alternatives to a Supermarket - Answers FIFO, Sequence Pull

Using only one schedule process in pull system is a ____ process - Answers pacemaker

Pitch - Answers increment of work (take time x pack size)

Document information

Uploaded on
November 23, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.4
(12)
Sold
113
Followers
2
Items
14856
Last sold
6 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions