bolts, ICC Structural Steel, s1 bolts, S1
Bolting, ICC Bolting
Terms in this set (789)
Where, in any specific case, restrictive
different sections of this code
specify different materials,
methods of construction or other
requirements, the
most_________shall govern.
Section R102.1
The purpose of this code is to minimum
establish ________ requirements to
safeguard the public safety,
health and general welfare.
Section R101.3
,Where the extent of the IRC
reference to a referenced code
or standard includes subject
matter that is within the scope of
the IRC, the provisions of the
________ shall take precedence.
Section R102.4.2
An alternative material or method satisfactory intent
shall be approved where the
proposed design is _______ and
complies with _______of the
provisions of the IRC.
Section R104.11
Other than storm shelters, a 200 sq ft
permit is not required for one
story detached accessory
structures, provided that the floor
area does not exceed _______
square feet
Section R 105.2
Compliance with the specific performance
________ -based provisions of the
International Codes shall be an
alternative to the specific
requirements of the IRC
Section R104.11
Fences not over_______ feet high 7 ft
do not require permits
Section R105.2
,A permit is not required for the required
replacement of branch circuit
overcurrent devices(breakers) of
the ________ capacity in the same
location (within a panel)
Section R105.2
Decks not exceeding ______ square 200 sq ft 30in
feet in area, that are not more
than _______ inches above grade at
any point, are not attached to a
dwelling, do not require a permit.
Section R105.2
Where equipment replacements next working (to the building official)
and repairs must be performed in
an emergency situation, the
permit application shall be
submitted within the _______ _________
business day.
Section R105.2.1
An application for a permit for 180 (180 days also applies to extensions)
any proposed work shall be
deemed to have been
abandoned ___________days after the
date of filing.
Section R105.3.2
Before issuing a permit, the authorized
building official is __________ to
examine or cause to be
examined buildings, structures
and sites for which an application
has been filed.
Section R105.9
, Where the building official issues REVIEWED FOR CODE COMPLIANCE
a permit, the construction
documents shall be approved in
writing or by a stamp that states
___________ _________ _________ ___________.
Section R106.3.1
Final inspection shall be made complete occupancy
after the permitted work is
____________ and prior to ____________.
Section R109.1.6
If located in a flood hazard area, final
the documentation of elevations
required in Section R322.1.10 shall
be submitted to the building
official prior to the ______________
inspection
Section R109.1.6.1
That which enables a device, an Access (to)
appliance or equipment to be
reached by ready access or by a
means that first requires the
removal or movement of a panel,
door or similar obstruction.
Section R202
A finished or unfinished habitable Attic, Habitable
space within a attic
Section R202
Hot water is water at a 120*F
temperature greater than ________*F
Section R202