Cutter personnel who should be present at the cutter's arrival conference
prior to drydock:
✓ DCA, EO, XO, MPA, etc.
Where is the CG yard located?
✓ Baltimore, Maryland.
Which members of the training team should be involved in scenario
development?
✓ All DCCT members.
COMDINST M9000.6, which specific aspects of engineering does it reference?
✓ Naval Engineering.
Who approves DCPO replacements and rotation dates?
✓ XO.
What must a unit do if using a breathing air compressor outside of unit
ownership?
✓ A copy of that unit's BAC certificate must be added to your unit's record.
What does CGTTP 3-91.4 cover?
✓ Shipboard Fire Prevention and Fire Marshal.
, The Gas Alert Micro has one dual sensor. What gases does it monitor for?
✓ CO (Carbon Monoxide) & H2S (Hydrogen Sulfide).
4 engineer shore based support teams -ANSWER✔✔Maintenance Augmentation
Teams
(MAT),
National Industrial Enterprise (NIE),
Weapons Augmentation Team (WAT), Advanced Ship System Instruction and
Support Team (ASSIST)
If you deviate from specs due to an underway emergency, how many days to
commence work when you return? -ANSWER✔✔14 days
Nondirected used to provide specific requirements pertaining directly to coast
guard policy and procedure for all in service cutters -ANSWER✔✔Technical
Standard
Electronic document begins annual depot level maintenance on M7 SCBA, what is
it? -ANSWER✔✔MILSTRIP
Electronic document begins annual depot level maintenance on M7 SCBA, how far
in advance needs to be submitted prior to due date -ANSWER✔✔30 days prior to
expiration
What shore based entity is responsible for depot level maintenance and is
geographically distributed to support regions -ANSWER✔✔MAT (Maintenance
Augmentation Teams)
QUESTIONSNAJD ANSWERS WITH
COMPLETE SOLUTIONS 100%
CORRECT RATED A+
Cutter personnel who should be present at the cutter's arrival conference
prior to drydock:
✓ DCA, EO, XO, MPA, etc.
Where is the CG yard located?
✓ Baltimore, Maryland.
Which members of the training team should be involved in scenario
development?
✓ All DCCT members.
COMDINST M9000.6, which specific aspects of engineering does it reference?
✓ Naval Engineering.
Who approves DCPO replacements and rotation dates?
✓ XO.
What must a unit do if using a breathing air compressor outside of unit
ownership?
✓ A copy of that unit's BAC certificate must be added to your unit's record.
What does CGTTP 3-91.4 cover?
✓ Shipboard Fire Prevention and Fire Marshal.
, The Gas Alert Micro has one dual sensor. What gases does it monitor for?
✓ CO (Carbon Monoxide) & H2S (Hydrogen Sulfide).
4 engineer shore based support teams -ANSWER✔✔Maintenance Augmentation
Teams
(MAT),
National Industrial Enterprise (NIE),
Weapons Augmentation Team (WAT), Advanced Ship System Instruction and
Support Team (ASSIST)
If you deviate from specs due to an underway emergency, how many days to
commence work when you return? -ANSWER✔✔14 days
Nondirected used to provide specific requirements pertaining directly to coast
guard policy and procedure for all in service cutters -ANSWER✔✔Technical
Standard
Electronic document begins annual depot level maintenance on M7 SCBA, what is
it? -ANSWER✔✔MILSTRIP
Electronic document begins annual depot level maintenance on M7 SCBA, how far
in advance needs to be submitted prior to due date -ANSWER✔✔30 days prior to
expiration
What shore based entity is responsible for depot level maintenance and is
geographically distributed to support regions -ANSWER✔✔MAT (Maintenance
Augmentation Teams)