100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CAPM Study Questions with Answers (100% Correct Answers)

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
19-11-2025
Written in
2025/2026

CAPM Study Questions with Answers (100% Correct Answers) CAPM Study Questions with Answers (100% Correct Answers)

Institution
CAPM
Course
CAPM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CAPM
Course
CAPM

Document information

Uploaded on
November 19, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1




CAPM Study Questions with Answers (100%
Correct Answers)
Which of the following is a PMIS tool that can be used to execute the Manage
Communications Process? Answer: Social Media Management

All of the following are true about the project scope statement except Answer:
It is an output of the validate scope process

Project managers echibit different leadership styles each of the following is a
common leadership style except Answer: Motivational

which of the following contract types are used when the requirements are well
defined and nor significant changes to the scope are expected Answer: fixed
price contracts

in predictive projects the scope baseline for the project is the approved version
of which document Answer: project scope statement

which of the followingare considerations for tailoring for project schedule
management Answer: life cycle approach, resource availability, andd project
dimensions

which of the following is the process of analyzing sequences, durations,
resoruce requirements, and schedule constraints to create the project schedule
module for project execution and monitoring and controlling Answer: Develop
schedule

which of the following are types of project management office PMO structures
Answer: supportive, controlling, and directive

the process of formalizing acceptance of the completed project is which project
management process associated with the project scope management knowledge
area Answer: validate scope

,2


understanding, evaluating, defining, and managing requirements are essential
to satisfying Answer: customer expectations

what are the four processes in project stakeholder management Answer:
Identify Stakeholders.

Plan Stakeholder Engagement.

Manage Stakeholder Engagement.

Monitor Stakeholder Engagement.

Analogous cost estimating uses which of the following costs? Answer: The
actual cost of previous, similar projects.

what is used to construct a schedule model in which activities are represented
by nodes and graphically linked by one or more logical relationships to show
the performance sequence Answer: precedence diagramming method PDM

what is the process of developing options, selecting strategies, and agreeing on
actions to address overall project risk exposure, as well as treat individual
project risks Answer: plan risk responses

the three dimensions of complexity are defined as which of the following
Answer: system behavior, human behavior, and ambiguity

change requests are processed for review and disposition through the Perform
Integrated Change Control process and may include which of the following
types of change activities Answer: corrective action, preventative action, defect
reapir

which of the following describes a comprhensive list of changes submitted
during the project and their current status Answer: change log

during which time are team members commitments to the project strengthened
Answer: planning

, 3


all of the following statements about manage stakeholder engagment are true
except Answer: The ability of stakeholders to influence the project is typically
lowest during the initial stages and gets progressively higher as the project
progresses.

which of the following is an output in the determine budget process Answer:
project funding requirements, cost baseline, project document updates

which of the following is an input to the plan schedule management process
Answer: scope management plan

tools and techniques of the perform quantitative risk analysis process include
Answer: expert judgement, data gathering, simulations, and decision tree
analysis

what are the tools and techniques used in the close project or phase process
Answer: expert judgement, data analysis, meetings

All of the following are inputs to the identify risks process except Answer:
scope baseline

Constructive changes are Answer: Identified and documented by project
correspondence

Benchmarking involves comparing actual or planned project practices to those
of comparable projects with all of the following characteristics EXCEPT
Answer: Comparing practices only within the same application area

All of the following are external environmental factors EXCEPT Answer:
Organization values and principles

Effective team development strategies and activities are expected to increase the
team's performance, which increases the likelihood of meeting project
objectives. The evaluation of a team's effectiveness may include all of the
following indicators except Answer: Improvements in the overall project
performance as a result of increased intensity of conflict among project team
members

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Metric Yale School Of Medicine
View profile
Follow You need to be logged in order to follow users or courses
Sold
92
Member since
1 year
Number of followers
5
Documents
13109
Last sold
8 hours ago

Welcome to Metric – Your Go-To Study Resource on Stuvia! At Metric, we believe studying should be smart, efficient, and effective. That’s why we offer high-quality, exam-ready study notes, summaries, and resources designed to help you understand key concepts faster and achieve better results. Whether you're cramming for finals, revising for a quiz, or looking to deepen your understanding, Metric provides content that’s clear, structured, and aligned with real course requirements. ✨ What you’ll find at Metric: ✔️ Accurate, in-depth summaries ✔️ Easy-to-follow formats for fast revision ✔️ Notes based on real syllabus & past exams ✔️ Regularly updated content you can trust Join hundreds of students who rely on Metric to study smarter—not harder. Browse the shop, grab what you need, and level up your academic game today!ades with Expert Academic Help

Read more Read less
3.0

12 reviews

5
3
4
1
3
2
2
5
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions