Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

CM 214 - LESSON 28 EXAM 4 QUESTIONS WITH 100% VERIFIED ANSWERS.

Document preview thumbnail
Preview 2 out of 7 pages

CM 214 - LESSON 28 EXAM 4 QUESTIONS WITH 100% VERIFIED ANSWERS.

Content preview

CM 214 - LESSON 28 EXAM 4 QUESTIONS WITH 100%
VERIFIED ANSWERS.




Which of the following defines runoff?
a. the wearing away of soil by wind or water
b. the soil that is washed from the land into water, usually after rainfall
c. the rain, snow melt, and irrigation water that appears in streams, rivers,
drains, and sewers Answer - C


What is an SWPPP?
a. a plan that describes the measures that will be taken on a site to control
stormwater pollution
b. a best management practice that controls runoff, erosion, or sediment
c. a permit that authorizes a category of stormwater discharges under the CWA
within a geographical area Answer - A


Which type of BMP is implemented to maintain a clean jobsite?
a. erosion control
b. good housekeeping measures
c. sediment control Answer - B


What's the purpose of a stabilized construction entrance?
a. to compact the sediment attached to the wheels of construction vehicles

, b. to reduce the amount of runoff leaving the jobsite
c. to minimize the amount of soil being tracked from the jobsite Answer - C


When must changes be made to the SWPPP?
a. before the NOI is posted
b. when the CGP is updated during the construction project
c. when a BMP is found to be ineffective during an inspection Answer - C


Which of the following does the site supervisor have to do after an inspection?
a. Resubmit the SWPPP.
b. Prepare an inspection report.
c. Submit a Notice of Intent. Answer - B


When is the Notice of Termination filed?
a. once construction has ceased and the area is stabilized
b. before development and construction begin
c. during the construction phase Answer - A


When can the builder stop conducting SWPPP inspections and maintenance on
the site?
a. when the SWPPP is complete and the NOI has been filed
b. after the rainy season has ended
c. when construction is complete and all areas of the site have been
permanently stabilized Answer - C


When a storm or rainfall isn't in the forecast, how does the site supervisor
know when to inspect each BMP?

Document information

Uploaded on
November 19, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EvaTee
3.9
(980)
Sold
5359
Followers
3573
Items
58200
Last sold
12 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions