CHAPTER C C 1: COMMERCIAL
CC C C BUILDING C C PLANS C C AND C C SPECIFICATIONS
TABLE OF CONTENTS
C C C C
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where appropriate,
cc cc cc cc cc cc cc cc cc cc cc cc cc
with answers that are complete sentences.
cc cc cc cc cc cc
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
cc cc cc cc cc cc cc cc cc cc cc cc
applicable, responses should be written in complete sentences.
cc cc cc cc cc cc cc cc
1. What section of a commercial building’s specification contains a list of
cc cc c c c c cc c c cc c c cc c c
contract documents?
c c cc
Answer: A list of the contract documents is contained in General Clauses
c c c c c c c c c c c c c c c c c c c c c c
and Conditions. A listing of the Commercial Building contract documents is
c c cc c c c c c c c c c c c c c c c c c c
presented in this chapter under the heading ―Commercial Building Plans.‖ The
c c c c cc cc cc cc cc cc cc cc cc
instructor may wish to have the students check over this listing and compare it
cc cc cc cc cc c c c c c c c c c c c c c c c c c c
with the plans provided.
c c c c c c c c
2. The requirement for temporary light and power at the job site will be found in what
cc cc cc cc cc cc cc cc cc cc cc cc cc cc cc
portion of a commercial building’s specification?
cc cc cc cc cc
Answer: The Supplementary General Conditions specifies the job site requirements
cc cc cc cc cc cc cc cc cc
for temporary light and power. In some contracts, this electrical system becomes the
cc cc cc cc cc cc cc cc cc cc cc cc cc
responsibility of the general contractor; in other contracts, it is the electrical
cc cc cc cc cc cc cc cc cc cc cc cc
contractor’s responsibility to install and maintain the temporary electrical system. The
cc cc cc cc cc cc cc cc cc cc cc
instructor may wish to refer the student to NEC Article 590 and discuss the
cc cc cc cc cc cc cc cc cc cc cc cc cc cc
requirements in detail.
cc cc cc
2 | Page
cc cc cc cc cc
,3. The electrician uses the Schedule of Working Drawings for what purpose?
cc cc cc cc cc cc cc cc cc cc
Answer: The electrician uses the Schedule of Working Drawings to determine
c c c c c c cc c c c c c c c c cc c c
whether all of the drawings are at hand. The information on ―the other sheets‖ may be
c c cc cc cc cc cc cc cc cc cc cc cc cc cc cc cc
very important, especially in coordinating with other contractors.
cc cc cc cc cc cc cc cc
4. Complete the following items by indicating the letter(s) designating the correct
cc cc cc cc cc cc cc cc cc cc
source(s) of information:
cc cc cc
No. Answer Item Information
4. Sections Ceiling height cc Sections, Sheet A6 c c c c
5. Electrical Electrical receptacle cc Electrical symbol schedule, Chapter 2,
cc cc cc cc
symbol
cc style
cc Figure 2–6
c c cc
schedul
cc
e
6. Electrical Electrical outlet cc Electrical layout drawings, Sheets El,
cc cc cc cc
layout
cc location
cc E2, and E3
cc cc cc
drawing
cc
s
7. Elevations c c Exterior wall finishes cc cc Elevations, Sheets A4 and A5 c c c c c c cc
8. Site plan cc Grading elevations cc Site plan, Sheet A4
cc cc cc
9. Electrical Panelboard schedules c c Electrical layout drawings, Sheet E4
cc cc cc cc
layout
cc
drawing
cc
s
10. Architectural Room width cc Architectural floor plan, Sheets Al, A2, cc cc cc cc cc
floor plan
cc cc and A3
cc cc
11. Architectural Swing of door cc cc Architectural floor plan, Sheets Al, A2, cc cc cc cc cc
floor plan
cc cc and A3 cc
12. Sections View of interior wallcc cc cc Sections, Sheet A6 c c c c
Match the items on the left with those on the right by writing the letter designation of the
cc cc cc cc cc cc cc cc cc cc cc cc cc cc cc cc cc
appropriate organization from the list on the right.
cc cc cc cc cc cc cc cc
13. NEC Electrical Code cc National Electrical Code (NEC)
cc cc cc
3 | Page cc cc cc cc cc
, 14. IAEI Electrical inspectors
cc
International Association of Electrical
cc cc cc
Inspectors (IAEI)
cc cc
4 | Page