EXAMINATION TEST 2026 COMPLETE
QUESTIONS AND SOLUTIONS 100% CORRECT
● Food quality protection act - regulate pesticides through estab of
tolerance levels for drinking water, residential, and dietary exposure
● Who registers all pesticides in GA - EPA and Dept of Ag
● General Use Pesticide - less likely to harm environ
● Restricted Use Pesticide - only certified operator or someone under
their supervision may apply
● Violation of FIFRA - civil penalties + 5000.00
● Violation of the law - criminal penalty up to 25,000 and one year in
prison
● Killing of endangered - max fine of 20,000 and 1 yr in prison
,● Who administers SPCA - Dept of Ag and Georgia Structural Pest
Control Commission
● Certified operator - household pest control-25, wood destroying
organisms-25, and fumigation-12
● Contracts for WDO - -before the work begins -type of treatment,
effective date, diagram, price, terms, conditions for renewal, provisions
for limitation of liability, what if structure chanes, 3 day, signature,
station info, insurance
● Post construction subterranean termite control warranty only contract
limitations - -one and two family dwellings and townhomes -initial
inspection, type of treatment at first occurrence, annual inspection,
inspection/repair statement
● WIR - previous and active subterranean, powder post, wood boring,
dry wood termites, wood decaying fungus
● Comprehensive post construction soil termiticide application - -
removal of cellulosic material from under building, removal of w2e
except pressure treated, removal of visible and accessible tunnels, app of
approved termiticide to exterior and interior soils
● Defined post construction soil termiticide application - removal of
cellulosic material from under building, removal or all w2e except
, pressure treated, removal of all accessible tunnels, app of approved
termiticide
● Post construction non soil termiticide applications other than baits -
removal of all celulosic, removal of all w2e except pressure treated,
removal of all visible and accessible tunnels, app of approved termiticide
● Post construction termiticide bait applications - removal of all
cellulosic material from under building, removal of all w2e except
pressure treated, removal of all visible and accessible tunnels
● Pre construction termiticide bait applications - systems must be
monitored consistent w/product label for 1 yr at no additional cost when
installed for pre construction or to control infestations found during
coverage period of WIR
● Treatment of Powder Post and Wood Borers - application of approved
pesticide, ventilation of the under floor space between the bottom of the
floor joists and the earth to meet the requirements of the international
residential building code for 1-2 family dwellings, and installation of
moisture barrier to cover min of 70% exposed soil surface in crawl
● Treatment of wood decay fungi - ventilation of under floor space
between bottom of floor joists and the earth to meet the requirements of
the international residential building code for 1-2 family dwellings,