Which 3 layers MUST be present at a minimum for a road? -
ANSWERS-Surface
Base Course
Compacted subgrade
What are the 6 facility categories by preference for occupation? -
ANSWERS-1. U.S. owned, occupied, or leased facilities
2. U.S. owned, substitutes pre-positioned in theatre
3. Host nation/multinational support facilities
4. Facilities available from commercial sources
5. U.S. owned facility substitutes stored in U.S.
6. Newly constructed facilities
*Emphasis on Existing Facilities*
What are the roles of stability general engineering? - ANSWERS-1.
Civil security and control
2. Restore essential services
3. Support infrastructure development
4. DSCA
What are the steps and teams to Airfield Damage Repair (ADR)? -
ANSWERS-1. Establish security
,2. Airfield Assessment team: Runs length of runway. Records all
craters. Identifies any UXO's, spalling, mines, damage, vehicles,
debris. Determine, recommend CBR
3. Runway Clearance Element: Removes any debris, etc.
4. Light Airfield Repair team: Repairs any craters on MOS
What is the criteria for airfield repair quality? - ANSWERS-Final
Repair within 3/4" of original runway surface.
Craters not within 25 ft of each other (if unavailable, treat as one large
crater).
Craters not within touchdown (1000ft of either end of MOS)
What is the critical path? - ANSWERS-The longest time path through
the network and is formed by joining those activities, which if
delayed, will delay the project.
Characteristics:
1. Must be continuous
2. Determines project duration
3. Can have more than one critical path
4. Has no float
What are the essentials of project management? - ANSWERS--
Something you specifically want to accomplish
- Quantifiable
- Way to measure the success or failure
- Termination Point
, What are steps common to road and railroad construction? -
ANSWERS-- Clear and grub
- Prepare subgrade by cutting/filling and compacting
What are the 3 semi-permanent repairs? - ANSWERS-3 Semi-
Permanant Repairs:
- Stone and grout
- Concrete
- Sand
What are the construction expected life spans? - ANSWERS-
Temporary: < 5 years
Semi-permanent: 5-25 years
Permanant: > 25 years
What is the purpose of Airfield Seizure? - ANSWERS-The purpose
can be to allow follow-on airland forces to conduct transload
operations or to establish a lodgment in order to continue combat
operations from that location.
MOS length and width for:
C-130
C-17
Fighter aircraft - ANSWERS-Fighter aircraft: 5,000 feet long by 50
feet wide.