ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+&lt;RECENT VERSION&gt; 1) The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm] 2) The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] 3) The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - ANSWER Annually, accuracy 4) The temperature of concrete may be measured in a wheelbarrow. True or False? - ANSWER True 5) The temperature of concrete may be measured in a wall form. True of False - ANSWER True 6) A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - ANSWER False 7) What must be done to the sample container prior to sampling the concrete? - ANSWER Dampen (with water) 8) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - ANSWER Gently press the concrete around the temperature measuring device at the surface of the concrete 9) When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ _____ before making the test. - ANSWER Wet sieved 10) The slump test is applicable to plastic concrete with a maximum size aggregate of _____. - ANSWER 1.5 in. 11) When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be _____. - ANSWER Removed by wet sieving the sample over 1.5 in. sieve 12) The mold for making the slump test is in the shape of _____. - ANSWER The frustum of a cone 13) The height of the slump mold is _____. - ANSWER 12 in. [300 mm] 14) The interior surface of the slump mold is allowed to have minor irregularities. True or False? - ANSWER False 15) For use in the slump test, the end or both ends of the tamping rod must be _____. - ANSWER Rounded to a hemispherical tip 16) The sample of concrete for use in making the slump test must be obtained in accordance with ASTM Standard _____. - ANSWER C172, Standard Practice for Sampling Freshly Mixed Concrete 17) The slump mold should be in a dry condition before beginning the test. True or False? - ANSWER False 18) The surface on which the slump mold will be placed must be _____. - ANSWER Flat, level, moist, non absorbent, and free of vibration 19) The slump mold is filled in _____ layers. - ANSWER 3 20) Each layer should fill approximately _____ the volume of the mold. - ANSWER One-third 21) The approximate concrete depth (in verticle distance) after placing the first layer is _____, and the second layer is _____. - ANSWER 2 5/8 in., 6 1/8 in. 22) How deep should the tamping rod penetrate into each layer? - ANSWER Rod each layer throughout its depth; on the second and final layers, the rod should penetrate into the previous layer approximately 1 in. 23) When rodding the bottom layer, the tamping rod must be _____ to uniformly distribute the strokes. - ANSWER Slightly inclined 24) What must be done if the concrete drops below the top of the slump mold while the top layer is being rodded? - ANSWER Add additional concrete to keep an excess of concrete above the top of the mold at all times 25) Prior to lifting the mold, concrete must be removed from _____. - ANSWER The area surrounding the base of the mold 26) After the final rodding, the sides of the slump mold should be tapped lightly with the tamping rod. True or False? - ANSWER False 27) When raising the slump mold, it should not be rotated or twisted, True or False? - ANSWER True 28) How much time is allowed for lifting the slump mold ? - ANSWER 5 +- 2 seconds 29) The measurement for slump is made from the top of the mold to what point of the concrete specimen? - ANSWER The displaced original center of the top surface of the specimen 30) The slump of the concrete is measured and reported to the nearest _____. - ANSWER 1/4 in. 31) How much time is allowed to conduct the slump test from beginning to completion? - ANSWER 2 1/2 minutes 32) The diameter of the tamping rod used in the Slump test is _____. - ANSWER 5/8 in. 33) What is the required shape of the tamping end of the rod? - ANSWER Rounded to a hemispherical tip 34) A plastic container can be used for the measure in unit weight. True or False? - ANSWER False, measure must be steel or another suitable metal 35) What is the required minimum frequency of the vibrator used in Unit Weight test method? - ANSWER 9000 vibrations per minute 36) What is the minimum thickness of a metal strike-off plate? - ANSWER 1/4 in. 37) What is the minimum thickness for a glass or acrylic strike-off plate? - ANSWER 1/2 in. 38) What is the specified weight of the mallet used on measures that are 0.5 ft^3 or smaller? - ANSWER 1.25 lbs. 39) What method of consolidation must be used when the slump is greater than 3 in.? - ANSWER Rodding 40) What method of consolidation must be used when the slump is less than 1 in.? - ANSWER Vibration 41) If rodding is the method of consolidation being used, the measure must be filled in how many layers? - ANSWER 3 42) For consolidating the unit weight sample into the bowel, what is the required number of strokes of the tamping rod for consolidation of each layer? - ANSWER 25 43) When rodding the middle and the top layers, the tamping rod should penetrate into the layer below approximately _____. - ANSWER 1 in. 44) If vibration is the method of consolidation, the measure must be filled in _____ approximately equal layers. - ANSWER 2 45) If, after consolidation of the final layer for unit weight, the concrete level is 1/2 in. above the top of the measure, what should be done? - ANSWER Remove a representative portion of the excess concrete with a trowel or scoop 46) After consolidation of the final layer for unit weight, an excess of concrete ____ above the top of the measure is considered optimum. - ANSWER 1/8 in. 47) After completing the strike-off procedure for unit weight, what must be done before weighing the measure and sample? - ANSWER Clean off any excess concrete 48) The Type B Pressure Meter of determining air content can be used on concrete containing _____ _____ aggregate. - ANSWER Relatively Dense 49) The Type B Pressure Meter of determining air content cannot be used on concrete containing the following types of aggregates, _____, _____, _____. - ANSWER Lightweight, air-cooled blast furnace slag, or aggregates of high porosity

Show more Read less
Institution
Aci Concrete
Course
Aci concrete











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Aci concrete
Course
Aci concrete

Document information

Uploaded on
November 13, 2025
Number of pages
60
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

ACI CONCRETE FIELD TESTING
TECHNICIAN- GRADE I
PRACTICE EXAM QUESTIONS WITH
CORRECT DETAILED ANSWERS |
ALREADY GRADED A+<RECENT
VERSION>

1) The sensor of the temperature measuring device shall be submerged a minimum of
_____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm]


2) The temperature measuring device shall have a capacity of measuring temperature of
freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of
_____. - ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]


3) The temperature measuring device shall be calibrated _____, or whenever there is a
question of _____. - ANSWER Annually, accuracy


4) The temperature of concrete may be measured in a wheelbarrow. True or False? -
ANSWER True


5) The temperature of concrete may be measured in a wall form. True of False -
ANSWER True


6) A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. True of False? - ANSWER False


7) What must be done to the sample container prior to sampling the concrete? -
ANSWER Dampen (with water)

,8) What must be done to the concrete surrounding the temperature measuring device
after the device is submerged in the fresh concrete. - ANSWER Gently press the
concrete around the temperature measuring device at the surface of the concrete




9) When the concrete contains aggregate larger than that permitted for a particular test
method, the sample of concrete must be _____ _____ before making the test. -
ANSWER Wet sieved


10) The slump test is applicable to plastic concrete with a maximum size aggregate of
_____. - ANSWER 1.5 in.


11) When the concrete contains aggregate larger than allowed for the slump test, the large
aggregate must be _____. - ANSWER Removed by wet sieving the sample over
1.5 in. sieve


12) The mold for making the slump test is in the shape of _____. - ANSWER The
frustum of a cone


13) The height of the slump mold is _____. - ANSWER 12 in. [300 mm]


14) The interior surface of the slump mold is allowed to have minor irregularities. True or
False? - ANSWER False


15) For use in the slump test, the end or both ends of the tamping rod must be _____. -
ANSWER Rounded to a hemispherical tip


16) The sample of concrete for use in making the slump test must be obtained in
accordance with ASTM Standard _____. - ANSWER C172, Standard Practice for
Sampling Freshly Mixed Concrete


17) The slump mold should be in a dry condition before beginning the test. True or False?
- ANSWER False

,18) The surface on which the slump mold will be placed must be _____. - ANSWER
Flat, level, moist, non absorbent, and free of vibration


19) The slump mold is filled in _____ layers. - ANSWER 3



20) Each layer should fill approximately _____ the volume of the mold. - ANSWER
One-third


21) The approximate concrete depth (in verticle distance) after placing the first layer is
_____, and the second layer is _____. - ANSWER 2 5/8 in., 6 1/8 in.




22) How deep should the tamping rod penetrate into each layer? - ANSWER Rod each
layer throughout its depth; on the second and final layers, the rod should penetrate
into the previous layer approximately 1 in.


23) When rodding the bottom layer, the tamping rod must be _____ to uniformly
distribute the strokes. - ANSWER Slightly inclined


24) What must be done if the concrete drops below the top of the slump mold while the
top layer is being rodded? - ANSWER Add additional concrete to keep an excess
of concrete above the top of the mold at all times


25) Prior to lifting the mold, concrete must be removed from _____. - ANSWER The
area surrounding the base of the mold


26) After the final rodding, the sides of the slump mold should be tapped lightly with the
tamping rod. True or False? - ANSWER False


27) When raising the slump mold, it should not be rotated or twisted, True or False? -
ANSWER True



28) How much time is allowed for lifting the slump mold ? - ANSWER 5 +- 2 seconds

, 29) The measurement for slump is made from the top of the mold to what point of the
concrete specimen? - ANSWER The displaced original center of the top surface of
the specimen


30) The slump of the concrete is measured and reported to the nearest _____. -
ANSWER 1/4 in.


31) How much time is allowed to conduct the slump test from beginning to completion? -
ANSWER 2 1/2 minutes



32) The diameter of the tamping rod used in the Slump test is _____. - ANSWER 5/8
in.


33) What is the required shape of the tamping end of the rod? - ANSWER Rounded to
a hemispherical tip


34) A plastic container can be used for the measure in unit weight. True or False? -
ANSWER False, measure must be steel or another suitable metal


35) What is the required minimum frequency of the vibrator used in Unit Weight test
method? - ANSWER 9000 vibrations per minute



36) What is the minimum thickness of a metal strike-off plate? - ANSWER 1/4 in.



37) What is the minimum thickness for a glass or acrylic strike-off plate? - ANSWER
1/2 in.


38) What is the specified weight of the mallet used on measures that are 0.5 ft^3 or
smaller? - ANSWER 1.25 lbs.


39) What method of consolidation must be used when the slump is greater than 3 in.? -
ANSWER Rodding
$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
jervismuthami

Get to know the seller

Seller avatar
jervismuthami Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
6 months
Number of followers
0
Documents
560
Last sold
6 hours ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions