Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 30 pages
Exam (elaborations)

Texas Mold Remediation Contractor State Exam — Complete Solutions (2025/2026)

Document preview thumbnail
Preview 3 out of 30 pages

This document provides the complete set of verified solutions for the Texas Mold Remediation Contractor State Exam for the 2025/2026 licensing cycle. It covers essential topics outlined by the Texas Department of Licensing and Regulation (TDLR), including mold assessment and remediation procedures, containment and safety practices, legal requirements, documentation standards, and post-remediation clearance. Designed for professionals seeking state certification, this guide ensures full comprehension of Texas-specific regulations and best practices for safe, compliant remediation.

Content preview

TEXAS MOLD REMEDIATION CONTRACTOR STATE EXAM — COMPLETE
SOLUTIONS (2025/2026)

Introduction

The Texas Mold Remediation Contractor license, regulated by the Texas Department of
Licensing and Regulation (TDLR), certifies professionals to safely assess and remediate
mold in buildings, protecting public health and property. Contractors must adhere to
TDLR rules to ensure compliance, minimize risks, and uphold standards during projects.
This exam covers core areas, including Texas Administrative Code (TAC) mold
regulations, remediation protocols and project management, containment setup and
negative air pressure, personal protective equipment (PPE), work plans, remediation
protocols, and post-remediation evaluation (PRE), licensing requirements, reporting, and
recordkeeping, liability, insurance standards, and homeowner rights, health risks, mold
identification, and environmental controls. Designed for the 2025/2026 licensing period,
this guide provides original, scenario-based questions with detailed explanations to
support complete mastery, formatted in Markdown for clarity.


Question 1
A mold remediation contractor is hired for a project in a Texas residence with visible
mold growth exceeding 25 contiguous square feet. Per TAC §78, what is the FIRST step?
A. Begin removal without assessment
B. Notify TDLR immediately
C. Ensure a Mold Assessment Report (MAR) is completed

D. Apply biocide without containment

Correct Answer: C — Ensure a Mold Assessment Report (MAR) is completed

Explanation: TAC §78.100 requires a licensed Mold Assessor to complete a MAR before
remediation for projects >25 sq ft, outlining scope and protocols. Removal without
assessment (A), immediate TDLR notification (B), or biocide application (D) violates
sequencing rules.

Question 2
During a remediation project, a contractor identifies additional mold in an HVAC system.
What must be done per TDLR rules?
A. Ignore if not visible
B. Amend the Mold Remediation Protocol (MRP)
C. Continue without documentation

D. Use unapproved cleaners

,Correct Answer: B — Amend the Mold Remediation Protocol (MRP)

Explanation: TAC §78.120 mandates amending the MRP for new discoveries like HVAC
mold, ensuring updated containment and removal plans. Ignoring (A), continuing
undocumented (C), or unapproved cleaners (D) risks non-compliance and health hazards.

Question 3
What is the minimum PPE requirement for workers in a containment area with Category 3
mold?
A. Gloves only
B. Full-body suit, respirator, gloves, and boots
C. No PPE needed

D. Mask and gloves only

Correct Answer: B — Full-body suit, respirator, gloves, and boots

Explanation: TAC §78.140 requires full-body protective suits, N95 or higher respirators,
gloves, and boots for Category 3 (extensive) mold to prevent exposure. Gloves only (A),
no PPE (C), or minimal (D) is insufficient.

Question 4
A contractor completes remediation. What is required for post-remediation evaluation
(PRE)?
A. No evaluation needed
B. Visual inspection and clearance testing by a Mold Assessor
C. Self-inspection only

D. Homeowner sign-off without testing

Correct Answer: B — Visual inspection and clearance testing by a Mold Assessor

Explanation: TAC §78.130 mandates PRE by a licensed Mold Assessor, including visual
checks and air/surface sampling to confirm mold removal. No evaluation (A),
self-inspection (C), or sign-off without testing (D) violates clearance rules.

Question 5
What is a key requirement for mold remediation work plans per TAC §78?
A. No written plan needed
B. Include containment, removal methods, and PPE
C. Verbal plan only

D. Ignore HVAC considerations

Correct Answer: B — Include containment, removal methods, and PPE

, Explanation: TAC §78.110 requires work plans to detail containment zones, removal
techniques, PPE, and disposal to ensure safe, effective remediation. No plan (A), verbal
(C), or ignoring HVAC (D) risks non-compliance.

Question 6
An employee develops a rash after mold exposure. What is the contractor’s
responsibility?
A. Ignore if mild
B. Report incident and provide medical evaluation
C. Continue work without PPE

D. Deny exposure occurred

Correct Answer: B — Report incident and provide medical evaluation

Explanation: TAC §78.150 requires reporting exposure incidents and offering medical
evaluation to comply with worker safety. Ignoring (A), no PPE (C), or denial (D) violates
regulations.

Question 7
What is the negative air pressure requirement for containment areas?
A. No pressure needed
B. Maintain -0.02 inches of water column
C. Positive pressure only

D. Variable without monitoring

Correct Answer: B — Maintain -0.02 inches of water column

Explanation: TAC §78.120 mandates negative pressure of at least -0.02 inches WC in
containment to prevent mold spore spread. No pressure (A), positive (C), or unmonitored
(D) risks contamination.

Question 8
A contractor must notify TDLR of a project if?
A. Mold <25 sq ft
B. Project >25 sq ft and requires MRP
C. All projects, regardless of size

D. Only commercial projects

Correct Answer: B — Project >25 sq ft and requires MRP

Explanation: TAC §78.100 requires notification for projects >25 sq ft needing a MRP.
Small projects (A), all projects (C), or only commercial (D) are incorrect.

Document information

Uploaded on
November 11, 2025
Number of pages
30
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorAgness
3.5
(4)
Sold
44
Followers
5
Items
1396
Last sold
18 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions