What makes up a quality asphalt mixture? -ANSWER ✔---A quality asphalt mixture is determined by
the constructability, if it conforms to Specifications, and if it satisfies functional requirements.
CQC -ANSWER ✔---contractor quality control
Superpave -ANSWER ✔---Asphalt mix design system since 1998
QCP -ANSWER ✔---Quality control plan
QCM -ANSWER ✔---Quality control Manual
QC -ANSWER ✔---Quality Control (Contracting Testing and Inspection)
VT -ANSWER ✔---Verification Testing (FDOT or CEI Verification)
CEI -ANSWER ✔---Construction Engineering and Inspection
, RT -ANSWER ✔---Resolution Testing (FDOT)
IV -ANSWER ✔---Independent Verification Testing
IA -ANSWER ✔---Independent Assurance Testing
The decision-making authority on a job needs to be given to who? -ANSWER ✔---Needs to be given
to the level closet to the work as specified in the specifications. It ensure a quick handle on situations
and issues.
The governing order of project documents from high (1) to low (7) starts with the highest being -
ANSWER ✔---Special Provisions
The governing order of project documents from high to low (2) -ANSWER ✔---Technical Special
Provisions
The governing order of project documents from high to low (3) -ANSWER ✔---Plans
The governing order of project documents from high to low (4) -ANSWER ✔---Road design,
structures, and traffic operations standards
The governing order of project documents from high to low (5) -ANSWER ✔---Developmental
Specifications
The governing order of project documents from high to low (6) -ANSWER ✔---Supplemental
Specifications
The governing order of project documents from high to low (7) -ANSWER ✔---Standard
Specifications
Certification 2025 – Complete Study
Guide & Practice Test REAL EXAM 100%
What makes up a quality asphalt mixture? -ANSWER ✔---A quality asphalt mixture is determined by
the constructability, if it conforms to Specifications, and if it satisfies functional requirements.
CQC -ANSWER ✔---contractor quality control
Superpave -ANSWER ✔---Asphalt mix design system since 1998
QCP -ANSWER ✔---Quality control plan
QCM -ANSWER ✔---Quality control Manual
QC -ANSWER ✔---Quality Control (Contracting Testing and Inspection)
VT -ANSWER ✔---Verification Testing (FDOT or CEI Verification)
CEI -ANSWER ✔---Construction Engineering and Inspection
, RT -ANSWER ✔---Resolution Testing (FDOT)
IV -ANSWER ✔---Independent Verification Testing
IA -ANSWER ✔---Independent Assurance Testing
The decision-making authority on a job needs to be given to who? -ANSWER ✔---Needs to be given
to the level closet to the work as specified in the specifications. It ensure a quick handle on situations
and issues.
The governing order of project documents from high (1) to low (7) starts with the highest being -
ANSWER ✔---Special Provisions
The governing order of project documents from high to low (2) -ANSWER ✔---Technical Special
Provisions
The governing order of project documents from high to low (3) -ANSWER ✔---Plans
The governing order of project documents from high to low (4) -ANSWER ✔---Road design,
structures, and traffic operations standards
The governing order of project documents from high to low (5) -ANSWER ✔---Developmental
Specifications
The governing order of project documents from high to low (6) -ANSWER ✔---Supplemental
Specifications
The governing order of project documents from high to low (7) -ANSWER ✔---Standard
Specifications