ECCC GE Exam comprehensive questions and verified
answers ACTUAL EXAM 2025 TEST!! Graded A+ |
2025|2026 EXAM UPDATE
Sewage Water
Electricity Academics Trash
Medical Safety
Other Considerations
SWEAT-MSO
MDMP and Construction MDMP nests within construction planning and EN
Planning requirements for sustainment
Unit requests on a DA4283 Go to DPW for approval
Create list for troop construction requests S3 syncs
with DPW for project
Projects are picked and project packet are given;
Project Origin/Routing scope of work, site plan, and drawings
S3C produces construction directive, BOM, and
Construct Activities Project assigned to executing
company
project supervisor identifies features of work during
estimating and scheduling
Definable Features of process. "Task which is sperate and distinct from
Work other tasks, has separate control requirements, and
may be identified by different trades or disciplines, or
it may be work by the same trade in a different
environment"
Prep Phase: apply network analysis, scheduling,
estimating Initial Phase: Choosing configuration,
For each definable materials, equipment Follow Up Phase: adherence to
feature of work standard procedures
Completion Phase: (in doctrine - rework phase)
consists of Quality Assurance and Quality Control
Quality Management activities instituted to achieve the quality levels
(QM) established by project plans and specifications or as
1/1
2
, 11/9/25, 8:33 PM ECCC GE Exam
directed quality established by the contract
requirements
engineering unit's system in place during execution
Quality Control (QC) to manage, control, and
document the unit's activities in compliance with the
project plans and specifications requirements
Unit QC Plan unit QC manager and assigned QC specialists
perform and direct activities to execute unit level QC
program
Project QC Plan - project managers and project supervisors perform
and direct activities to develop individual project QC
plan
planned and systematic pattern of all actions
Quality Assurance (QA) necessary to provide confidence that adequate
technical requirements are established, that products
and services conform to those requirements, and
satisfactory performance is achieved
Types of construction Permanent, Semi-permanent, Temporary
Forward Engineer Support Team-Advance (FEST-A) or
USACE Response Options Reconnaissance Team (RT) Advanced Echelon
(ADVON) team
Contingency Engineer District (CED)
2/1