OM TEST 3 EXAM QUESTIONS AND ANSWERS Kanban means "symbol" or "box" in Japanese. - CORRECT ANSWERFalse You have been called in as a consultant to set up a kanban control system. The first thing you do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be set at 5 percent of the demand during lead time. The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours. Which of the following is the number of kanban card sets necessary to support this situation? - CORRECT ANSWER6,300 k= 1,200 x 10 x 1.05/2= 6,300

Content preview

OM TEST 3 EXAM QUESTIONS AND ANSWERS
Kanban means "symbol" or "box" in Japanese. - CORRECT ANSWER✅✅False



You have been called in as a consultant to set up a kanban control system. The first thing you do is to
determine the number of kanban card sets needed. Your research shows that the expected demand
during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be
set at 5 percent of the demand during lead time. The tote trays used as containers can hold 2 units of
stock, and the lead time to replenish an order is 10 hours. Which of the following is the number of
kanban card sets necessary to support this situation? - CORRECT ANSWER✅✅6,300

k= 1,200 x 10 x 1.05/2= 6,300



When implementing a lean production system, a stabilized schedule is achieved using which of the
following? - CORRECT ANSWER✅✅Level scheduling



Lean production makes implementing green strategies in manufacturing processes more difficult. -
CORRECT ANSWER✅✅False



JIT manufacturing forces a firm to work with a lower water level despite safety hazards. - CORRECT
ANSWER✅✅False



In setting up a kanban control system you need to determine the number of kanban card sets needed. If
the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand
during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the
number of kanban card sets is needed? - CORRECT ANSWER✅✅30

k= 25 x 5 x 1.20/5= 30



JIT is typically applied to nonrepetitive manufacturing. - CORRECT ANSWER✅✅False



Group technology (GT) is credited with which of the following benefits? - CORRECT
ANSWER✅✅Reducing waiting time between process operations

,A principle of value stream mapping is to concentrate on speeding up value-added operations. -
CORRECT ANSWER✅✅False



Which of the following is an element that addresses elimination of waste under lean production? -
CORRECT ANSWER✅✅Kanban production control system



To implement a flow process in developing a lean system a firm might do which of the following? -
CORRECT ANSWER✅✅Reduce setup/changeover time



Lean production is an integrated set of activities designed to achieve high-volume production using
minimal inventories of raw materials, work-in-process, and finished goods. - CORRECT ANSWER✅✅True



Which of the following is not listed in the textbook as a component of a lean supply chain? - CORRECT
ANSWER✅✅Lean management



One of the many lean techniques that have been successfully applied in service firms is the eliminating
of unnecessary activities. - CORRECT ANSWER✅✅True



A kaizen burst is a symbol on a value stream map. - CORRECT ANSWER✅✅True



An activity where the parts that go into each unit of a product are periodically removed from inventory
and accounted for based on the number of units produced is called which of the following? - CORRECT
ANSWER✅✅Backflush



In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? -
CORRECT ANSWER✅✅Overproduction



Automation is a key to lean procurement. - CORRECT ANSWER✅✅True



The goal of JIT production is to drive all inventory queues lower. - CORRECT ANSWER✅✅False

, Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the
logistics activities. - CORRECT ANSWER✅✅False



Group technology is a philosophy wherein similar parts are grouped together and the processes
required to make the parts are arranged as a work cell. - CORRECT ANSWER✅✅True



One of the many lean techniques that have been successfully applied in service firms is the upgrading of
quality. - CORRECT ANSWER✅✅True



Uniform planet loading is a process of smoothing the production activity flow to dampen the reaction
waves that normally occur in response to schedule variations. - CORRECT ANSWER✅✅True



Uniform planet loading is where you schedule production with different amounts of the same product
each day of the week to permit variation to meet changing demand requirements. - CORRECT
ANSWER✅✅False



Lean production is a management philosophy and a pull system throughout the plant. - CORRECT
ANSWER✅✅True



Which of the following address elimination of waste under lean production? - CORRECT
ANSWER✅✅Quality at the source



In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If
assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the
demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours,
what number of Kanban card sets is needed? - CORRECT ANSWER✅✅120

k= 50 x 8 x 1.20/4= 120



In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? -
CORRECT ANSWER✅✅Product defects



In implementing a lean production system you should work with suppliers to do which of the following?
- CORRECT ANSWER✅✅Make frequent deliveries

Document information

Uploaded on
November 8, 2025
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES
3.4
(14)
Sold
92
Followers
1
Items
12009
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions