Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

TCU EXAM 4 ISSUES IN ENGINEERING DESIGN QUESTIONS AND ANSWERS GRADED A+

Document preview thumbnail
Preview 2 out of 5 pages

TCU EXAM 4 ISSUES IN ENGINEERING DESIGN QUESTIONS AND ANSWERS GRADED A+ Specifications - Answers A detailed, exact statement of particulars, especially a statement prescribing materials, dimensions, and quality of work for something to be built, installed, or manufactured. A detailed precise presentation or plan or proposal for something. A restriction that is insisted upon as a condition for an agreement. "Functional Specifications" - Answers Don't tell them what to provide but what the system is required to do. Two kinds of specifications - Answers Bid specification and procurement specification. Bid Specification - Answers "Request for Quotation." Requests/Solicits Industrial responses from perspective bidders for systems and solutions to meet the functional and technical requirements. Procurement specification - Answers To the winning supplier. The final Version with all clarifications targeting a supplier for contract award and purchase order. What are the standard requirements for all Specs - Answers 1. Signature page 2. Applicable Specifications, codes, and industry standards 3. Shipping 4. Bidder Responsibilities 5. Delivery Cover and Cost What makes a good specification? - Answers Cover all bases, encourage suppliers - large number of responses, avoid supplier confusion, and weed out pretenders. Risk - Answers A potential problem or threat that could affect the program's ability to meet its operational capability and performance, technical, cost, schedule, financial, or other objectives. Opportunity - Answers A potential initiative, such as performing a task more efficiently, that if implemented, could improve the programs ability to meet it's operational capability and performance and other objectives. Problem - Answers An undesirable event that has occurred. Since the adverse impact has been realized, it is no longer a risk and it must be handled through corrective actions. Responsibility - Answers Ensure all risks pertaining to an assigned program are identified and mitigated. What is necessary for the successful application of Risk Management? - Answers An understanding of both the basic mechanics of its implementation and the culture that must exist in order for stakeholders to effectively participate. Mechanization of Risk Management - Answers Includes the details involved in performing the five elements of risk management. Five elements of risk management - Answers Planning, identification, assessment, handling, and monitoring.

Content preview

TCU EXAM 4 ISSUES IN ENGINEERING DESIGN QUESTIONS AND ANSWERS GRADED A+

Specifications - Answers A detailed, exact statement of particulars, especially a statement
prescribing materials, dimensions, and quality of work for something to be built, installed, or
manufactured. A detailed precise presentation or plan or proposal for something. A restriction
that is insisted upon as a condition for an agreement.

"Functional Specifications" - Answers Don't tell them what to provide but what the system is
required to do.

Two kinds of specifications - Answers Bid specification and procurement specification.

Bid Specification - Answers "Request for Quotation." Requests/Solicits Industrial responses
from perspective bidders for systems and solutions to meet the functional and technical
requirements.

Procurement specification - Answers To the winning supplier. The final Version with all
clarifications targeting a supplier for contract award and purchase order.

What are the standard requirements for all Specs - Answers 1. Signature page

2. Applicable Specifications, codes, and industry standards

3. Shipping

4. Bidder Responsibilities

5. Delivery Cover and Cost

What makes a good specification? - Answers Cover all bases, encourage suppliers - large
number of responses, avoid supplier confusion, and weed out pretenders.

Risk - Answers A potential problem or threat that could affect the program's ability to meet its
operational capability and performance, technical, cost, schedule, financial, or other objectives.

Opportunity - Answers A potential initiative, such as performing a task more efficiently, that if
implemented, could improve the programs ability to meet it's operational capability and
performance and other objectives.

Problem - Answers An undesirable event that has occurred. Since the adverse impact has been
realized, it is no longer a risk and it must be handled through corrective actions.

Responsibility - Answers Ensure all risks pertaining to an assigned program are identified and
mitigated.

What is necessary for the successful application of Risk Management? - Answers An
understanding of both the basic mechanics of its implementation and the culture that must

, exist in order for stakeholders to effectively participate.

Mechanization of Risk Management - Answers Includes the details involved in performing the
five elements of risk management.

Five elements of risk management - Answers Planning, identification, assessment, handling, and
monitoring.

The culture involved in Risk Management - Answers The "environment" which must be
developed and the "attitude" which must exist in all personnel, management and stakeholders.

Planning Step of Risk Management Process Flow - Answers Includes the development of the
who, what , when, where, and how of the implementation of the process on the program. The
risk process is iterative, the risk management plan is continually reviewed and updated as
internal and external requirements mature or change.

Identification Step of Risk Management Process Flow - Answers During this step, risk
management process stakeholders identify potential risk/opportunities. Risk and Opportunities
are identified by stakeholders through the use of workshops, team meetings, one-on-one
interviews.

Assessment Step of Risk Management Process Flow - Answers Risk and opportunity -
qualitative and quantitative. Risk scoring matrix used.

Qualitative risk and opportunity assessment - Answers Results in high, moderate or low score
provides the basis for prioritization of potential risks and opportunities. Based on two criteria;
likelihood and consequence of occurrence.

Two criteria that determine level of risk - Answers Likelihood and consequence of occurrence.

Quantitative risk and opportunity assessment - Answers Allows Program Management to
allocate Management Reserve based on a ROM estimate of;

1. Cost impact if the risk occurs

2. Cost impact if the opportunity is achieved

3. Cost of the implementation of the mitigation/achievement plans

Handling Step of Risk Management Process Flow - Answers A strategy is selected for how to
handle the identified and assessed risks/opportunities.

Handling for risks/opportunities that are assessed as low - Answers They do not require
mitigation plans but are included on the watch list. The watch list is reviewed at regular intervals
to determine if candidates need to be re-assessed.

Handling for risks/opportunities that are assessed as high or moderate - Answers A handling

Document information

Uploaded on
November 7, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.4
(12)
Sold
114
Followers
2
Items
14902
Last sold
4 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions