The following are the challenges facing the construction industry today, except - decreasing
demand in sustainability requirements
the parameters define the overall extent of work to be included in a construction contract. -
scope of project
a supplemental drawing to the plans and specifications that details fabrication method,
materials, and models of a product or installation associated with the project. - shop
drawings
it is a process of awarding a contract to subcontractors and issuing a purchase order for
materials and equipment. - buy out
a request made by the owner to add or subtract features to the scope of the project resulting in
changes to the contract - change order
a daily amount of money paid by the contractor to the owner for each day that the project fails
to meet the completion date specified in the contract - liquidated damage
a change or addition to the contract documents issued after the documents have been released
but before the bids are due - addenda
, a contract document set consists of - an agreement, construction drawings, specifications,
addenda, general and supplementary condition
the shop drawings are prepared by the - architect
in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - general contractor
what is the first known recorded building code that outlines the roles and duties of the master
builder - code of hammurabi
in the construction management (CM) method of project delivery, there is normally no general
contractor - true
in the construction management at risk (CMAR) method of project delivery, the construction
manager - manages the project's construction during the construction phase
what project delivery method in which only one firm is contracted for both design and
construction of the project - design-build
what delivery method is best used if highly technical in nature of the project that requires good
communication and coordination need to occur between designers and builder? - Design-
build
what delivery method in which there is no or limited input from contractors and subcontractors
during the design phase? - Design-Bid-Build
Final Exam review Questions and Verified Answers:
{LATEST 2025/ 2026 UPDATE} COMPLETE REAL AND
AUTHENTIC EXAM {100% CORRECT} RATED A+!!!!
The following are the challenges facing the construction industry today, except - decreasing
demand in sustainability requirements
the parameters define the overall extent of work to be included in a construction contract. -
scope of project
a supplemental drawing to the plans and specifications that details fabrication method,
materials, and models of a product or installation associated with the project. - shop
drawings
it is a process of awarding a contract to subcontractors and issuing a purchase order for
materials and equipment. - buy out
a request made by the owner to add or subtract features to the scope of the project resulting in
changes to the contract - change order
a daily amount of money paid by the contractor to the owner for each day that the project fails
to meet the completion date specified in the contract - liquidated damage
a change or addition to the contract documents issued after the documents have been released
but before the bids are due - addenda
, a contract document set consists of - an agreement, construction drawings, specifications,
addenda, general and supplementary condition
the shop drawings are prepared by the - architect
in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - general contractor
what is the first known recorded building code that outlines the roles and duties of the master
builder - code of hammurabi
in the construction management (CM) method of project delivery, there is normally no general
contractor - true
in the construction management at risk (CMAR) method of project delivery, the construction
manager - manages the project's construction during the construction phase
what project delivery method in which only one firm is contracted for both design and
construction of the project - design-build
what delivery method is best used if highly technical in nature of the project that requires good
communication and coordination need to occur between designers and builder? - Design-
build
what delivery method in which there is no or limited input from contractors and subcontractors
during the design phase? - Design-Bid-Build