Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 40 pages
Exam (elaborations)

DBIA EXAM REVIEW 2026 FULL QUESTIONS AND ANSWERS GUARANTEED PASS GRADED A+

Document preview thumbnail
Preview 4 out of 40 pages

DBIA EXAM REVIEW 2026 FULL QUESTIONS AND ANSWERS GUARANTEED PASS GRADED A+

Content preview

DBIA EXAM REVIEW 2026 FULL QUESTIONS
AND ANSWERS GUARANTEED PASS GRADED
A+

◉ The Design-Builder assumes what type of responsibility regarding
errors and omissions in bridging documents provided by the
Owner? Answer: Full responsibility for errors and omissions


◉ In a Design-Build contract, if the Owner insists on a design
specification rather than a performance specification, which of the
following risks increases significantly for the Owner? Answer:
Performance failure due to Owner-specified design


◉ What is a key advantage of a Two-Step Best Value procurement
over a Single-Step? Answer: Encourages more bidders by reducing
workload in Step 1


◉ Which of the following would most likely trigger a Type 1
differing site condition claim? Answer: Encountering an
undocumented utility line


◉ Which party typically holds the contractual obligation for
obtaining and paying for permits in a Design-Build delivery model?
Answer: The Design-Builder

,◉ In a Design-Build team, the "single point of responsibility"
typically refers to: Answer: The Design-Builder


◉ Which scenario best reflects a misalignment in expectations
during a progressive design-build process? Answer: Owner
withholds decision-making authority from key stakeholders


◉ What is the most likely consequence of a poorly defined basis of
design (BOD)? Answer: Misinterpretation of performance criteria


◉ Under DBIA Standard Form of Agreement, who has the right to
direct the means and methods of construction? Answer: The Design-
Builder


◉ What is the principal challenge in allocating design risk in a
Design-Build project? Answer: Transfer of design liability from
architect to design-builder


◉ Under DBIA best practices, which of the following is the most
important factor during team selection? Answer: Qualifications and
team cohesion


◉ A Design-Build project using a bridging approach is most at risk
of: Answer: Duplicate design effort

,◉ Which legal doctrine may limit a contractor's liability if a project
is built precisely to Owner-furnished design documents? Answer:
Spearin Doctrine


◉ When is the optimal time to establish the Design-Builder's
Guaranteed Maximum Price (GMP) in a progressive design-build
model? Answer: At 60-80% design development


◉ Which of the following is LEAST likely to be considered a Design-
Builder's risk? Answer: Change in Owner leadership


◉ If the Owner fails to make timely decisions during the design
validation phase, what is the Design-Builder's best contractual
remedy? Answer: Issue a change order for delay


◉ The primary legal purpose of a teaming agreement in Design-
Build procurement is: Answer: To establish terms of collaboration
between design and construction entities


◉ Which of the following best reflects the principle of 'design
excellence' in the context of Design-Build? Answer: Integrated
design solutions aligned with Owner goals

, ◉ In a fixed-price Design-Build contract, cost savings due to
innovative methods usually: Answer: Are shared per the contract's
incentive provisions


◉ What factor most increases the risk of scope creep in Design-
Build? Answer: Poorly defined Owner project goals


◉ Which is a distinguishing characteristic of a highly effective
Owner's criteria document? Answer: Unambiguous functional
requirements


◉ DBIA advocates for the use of performance-based specifications
because they: Answer: Permit innovation by the Design-Builder


◉ A Design-Build contract that includes substantial Owner-directed
design elements should: Answer: Clearly allocate liability for
performance


◉ What is the purpose of a validation phase in progressive design-
build? Answer: To align scope, budget, and performance
expectations


◉ In the context of integrated delivery, "design assist" typically
refers to: Answer: Subcontractors influencing the design for
constructability and cost efficiency

Document information

Uploaded on
November 6, 2025
Number of pages
40
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
3.9
(24)
Sold
222
Followers
3
Items
55018
Last sold
21 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions