EVM 101 FINAL EXAM STUDY GUIDE 2026 COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS LATEST VERSION

Document preview thumbnail
Preview 4 out of 31 pages

EVM 101 FINAL EXAM STUDY GUIDE 2026 COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS LATEST VERSION 1. PV (Planned Value) - ANSWER Time-phased estimate value of planned work BCWS 2. BAC - ANSWER Budgeted at Complete total estimated value for all work planed through any given level authorized work 3. EV (Earned Value) - ANSWER time phased estimate value of completed work thorugh any given level and time period (BCWP) 4. AC (Actual Cost) - ANSWER Actual Cost of Work Performed (ACWP) 5. SV - ANSWER Seduled Variance EV-PV Positive (Ahead of Schedue) 6. CV - ANSWER Cost Variance EV-AC Poisitve (Under Budget) 7. EAC - ANSWER -Estimate at Completion -BAC/CPI -Independet cost estimated to complete all work planned through any given level -forecast cost 8. SPI - ANSWER Scheduled Performance Index EV/PV BCWP/BCWS 1 = Ahead of Schedule 9. CPI - ANSWER Cost Performance Index EV/AC BCWP/ACWP 1.00 = (Under Budget) 10. % Scheduled - ANSWER PV/BAC 11. % Completed - ANSWER EV/ BAC 12. % Spent - ANSWER AC/ BAC 13. TCPI - ANSWER To-Complete Performance Index (BAC-EVcum)/(BAC-ACcum) 1 = Must be more efficient 14. Performance Measurement Baseline (PMB) - ANSWER The performance measurement baseline (PMB) is the time-phased plan for accomplishing the contractual scope of work (SOW) against which contract performance is measured. The PMB is the resourced, budgeted cost for work scheduled (BCWS) for the contract. 15. Over Target Baseline (OTB) - ANSWER An over target baseline (OTB) is the condition created when the PMB is formally replanned to include additional performance management budget in excess of the contract's originally negotiated cost. An OTB increases the performance budget without modifying the work scope, or other constraints of the contract. 16. Over Target Schedule (OTS) - ANSWER An over target schedule (OTS) is the condition created when the contractor replans the schedule to one that exceeds the contract milestones and/or delivery date(s). The new schedule also becomes the basis for the performance budgets. An OTS is typically accompanied by increased cost, and thus an OTB. 17. Total Allocated Budget (TAB) - ANSWER The total allocated budget (TAB) reflects the budget for all authorized work scope. The TAB will always be equal to the Contract Budget Base (CBB) unless an OTB has been approved. Throughout a contract, the TAB may change in value due to negotiated contract modifications, or authorized unpriced work (AUW) 18. Contract Budget Base (CBB) - ANSWER The contract budget base is the sum of the negotiated contract cost and the estimated cost of any authorized unpriced work budgets: the CBB represents the current value of the project. The CBB also includes and budget set aside for management reserve. Contract overruns or underruns are determined by comparing the final cost of the contract with the CBB. 19. how many guidelines are there in the APM EVM - ANSWER thirty two guidelines divided between five sections 20. the five guideline sections are - ANSWER organisation, accounting considerations, analysis and management reports, revisions and data maintenance, planning scheduling and budgeting 21. the thirty two guidelines ensure - ANSWER the integrity of the projects baseline planning, performance measurement and cost collection processes

Content preview

EVM 101 FINAL EXAM STUDY GUIDE
2026 COMPLETE QUESTIONS WITH
CORRECT DETAILED ANSWERS ||
100% GUARANTEED PASS
<LATEST VERSION>



1. PV (Planned Value) - ANSWER ✔ Time-phased estimate value of planned
work


BCWS


2. BAC - ANSWER ✔ Budgeted at Complete
total estimated value for all work planed through any given level
authorized work


3. EV (Earned Value) - ANSWER ✔ time phased estimate value of completed
work thorugh any given level and time period (BCWP)


4. AC (Actual Cost) - ANSWER ✔ Actual Cost of Work Performed (ACWP)


5. SV - ANSWER ✔ Seduled Variance
EV-PV

, Positive (Ahead of Schedue)


6. CV - ANSWER ✔ Cost Variance
EV-AC


Poisitve (Under Budget)


7. EAC - ANSWER ✔ -Estimate at Completion
-BAC/CPI
-Independet cost estimated to complete all work planned through any given
level
-forecast cost


8. SPI - ANSWER ✔ Scheduled Performance Index
EV/PV
BCWP/BCWS
>1 = Ahead of Schedule


9. CPI - ANSWER ✔ Cost Performance Index
EV/AC
BCWP/ACWP
>1.00 = (Under Budget)


10.% Scheduled - ANSWER ✔ PV/BAC

,11.% Completed - ANSWER ✔ EV/ BAC


12.% Spent - ANSWER ✔ AC/ BAC


13.TCPI - ANSWER ✔ To-Complete Performance Index
(BAC-EVcum)/(BAC-ACcum)


>1 = Must be more efficient


14.Performance Measurement Baseline (PMB) - ANSWER ✔ The performance
measurement baseline (PMB) is the time-phased plan for accomplishing the
contractual scope of work (SOW) against which contract performance is
measured. The PMB is the resourced, budgeted cost for work scheduled
(BCWS) for the contract.


15.Over Target Baseline (OTB) - ANSWER ✔ An over target baseline (OTB)
is the condition created when the PMB is formally replanned to include
additional performance management budget in excess of the contract's
originally negotiated cost. An OTB increases the performance budget
without modifying the work scope, or other constraints of the contract.


16.Over Target Schedule (OTS) - ANSWER ✔ An over target schedule (OTS)
is the condition created when the contractor replans the schedule to one that
exceeds the contract milestones and/or delivery date(s). The new schedule
also becomes the basis for the performance budgets. An OTS is typically
accompanied by increased cost, and thus an OTB.

, 17.Total Allocated Budget (TAB) - ANSWER ✔ The total allocated budget
(TAB) reflects the budget for all authorized work scope. The TAB will
always be equal to the Contract Budget Base (CBB) unless an OTB has been
approved. Throughout a contract, the TAB may change in value due to
negotiated contract modifications, or authorized unpriced work (AUW)


18.Contract Budget Base (CBB) - ANSWER ✔ The contract budget base is the
sum of the negotiated contract cost and the estimated cost of any authorized
unpriced work budgets: the CBB represents the current value of the project.
The CBB also includes and budget set aside for management reserve.
Contract overruns or underruns are determined by comparing the final cost
of the contract with the CBB.


19.how many guidelines are there in the APM EVM - ANSWER ✔ thirty two
guidelines divided between five sections


20.the five guideline sections are - ANSWER ✔ organisation, accounting
considerations, analysis and management reports, revisions and data
maintenance, planning scheduling and budgeting


21.the thirty two guidelines ensure - ANSWER ✔ the integrity of the projects
baseline planning, performance measurement and cost collection processes

Document information

Uploaded on
November 5, 2025
Number of pages
31
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin
3.7
(148)
Sold
728
Followers
17
Items
3941
Last sold
18 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions