Hearing protection is required when the noise level at a job
site, averaged over 8 hours meets _____ decibles.
A. 95
B. 90
C. 80
D. 100 - ANSWERS-90
The maximum length of a hallway in a spinklered office
building shall be:
, A. 200'
B. 100'
C. 500'
D. 300' - ANSWERS-300'
What is the AAB requirement for a new church, mosque or
temple?
A. Entryway compliance
B. Partial compliance
C. They are exempt
D. Full compliance - ANSWERS-Full compliance
What is the size of a #3 rebar?
A. 1/8"
B. 1-3/8"
C. 3/8"
D. 1" - ANSWERS-3/8"
The maximum spacing of collar ties shall be _____ on center.
SUPERVISOR LICENSE (CSL) PRACTICE
EXAM WITH CORRECT ACTUAL
QUESTIONS AND CORRECTLY WELL
DEFINED ANSWERS LATEST ALREADY
GRADED A+ 2025 – 2026
Hearing protection is required when the noise level at a job
site, averaged over 8 hours meets _____ decibles.
A. 95
B. 90
C. 80
D. 100 - ANSWERS-90
The maximum length of a hallway in a spinklered office
building shall be:
, A. 200'
B. 100'
C. 500'
D. 300' - ANSWERS-300'
What is the AAB requirement for a new church, mosque or
temple?
A. Entryway compliance
B. Partial compliance
C. They are exempt
D. Full compliance - ANSWERS-Full compliance
What is the size of a #3 rebar?
A. 1/8"
B. 1-3/8"
C. 3/8"
D. 1" - ANSWERS-3/8"
The maximum spacing of collar ties shall be _____ on center.