render the permit void - grading, filling or other site modifications that would adversely
affect the sewage system
septic tank - first component of an on-site sewage management system, generally pre-
cast with concrete and delivered to the construction site
approval of the county board of health - septic tanks can be poured in place when
necessary, plans and specifications for the poured-in-place septic tanks must be submitted to
the health department prior to construction
two compartments - All septic tanks, pre-cast or poured in place, must be constructed to
standards set by the state
first compartment - designed to contain at least 2/3 of the total liquid capacity of the
tank
Technical Review Committee - Septic tanks may be constructed from material other than
concrete when approved
Study Guide (Septic Tank
Specifications pgs. 5-6) with
answer 100%correct
render the permit void - grading, filling or other site modifications that would adversely
affect the sewage system
septic tank - first component of an on-site sewage management system, generally pre-
cast with concrete and delivered to the construction site
approval of the county board of health - septic tanks can be poured in place when
necessary, plans and specifications for the poured-in-place septic tanks must be submitted to
the health department prior to construction
two compartments - All septic tanks, pre-cast or poured in place, must be constructed to
standards set by the state
first compartment - designed to contain at least 2/3 of the total liquid capacity of the
tank
Technical Review Committee - Septic tanks may be constructed from material other than
concrete when approved