Complete Questions And Correct Answers
(Verified Answers)|Brand New Version!
Save
Practice questions for this set
Learn 1 /7 Study with Learn
is defective in away that causes all current to
Choose an answer
After installing a new battery how
1 A grounded circuit is on that... 2 long should you wait to allow for
pcm time
When performing a volt drop test the
3 The component D in the following 4 volt meter setting should be set to
the following..
Don't know?
, Terms in this set (59)
After installing a new no need to wait
battery how long should
you wait to allow for pcm
time
As blower motor speed increases
decreases the voltage
drop across the resistance
block....
What should you do first Unlock the battery ground cable
when replacing junction
block or fuse?
The polarity of the voltage a commutator
applied to the
electromagnetic coils of
an actual working DC
motor is....
When performing a volt 3 volts
drop test the volt meter
setting should be set to
the following..
The symbol at the RIGHT a relay
represents.....
Which device is used to potentiometer
monitor throttle position
on the computer
A reading of .8 volts on excessive resistance
the volt meter #2 would
indicate.....
In a conventional wiring Splice
diagram a dot at the enter
section