100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CDT Exam Prep 1-4 Questions with Detailed Verified Answers

Rating
-
Sold
-
Pages
54
Grade
A+
Uploaded on
25-10-2025
Written in
2025/2026

CDT Exam Prep 1-4 Questions with Detailed Verified Answers

Institution
CDT
Course
CDT











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT
Course
CDT

Document information

Uploaded on
October 25, 2025
Number of pages
54
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CDT Exam Prep 1-4 Questions with Detailed
Verified Answers
Bidding documents are considered legal documents?

▪ True.

▪ False. Ans: False

Codes governing commercial construction and residential construction are different?

▪ True.

▪ False. Ans: True

The A/E usually hires a construction manager? Ans: False

The Owner, Contractor and A/E are parties to the construction agreement?

▪ True.

▪False. Ans: False

There are no differences between the AIA and EJCDC general conditions?

▪ True.

▪False. Ans: False

The drawings take precedence over the specifications?

▪ True.

▪False. Ans: False

,The role of a subcontractor is the same as a material supplier?

▪ True.

▪ False. Ans: False

The supplementary conditions should be coordinated with the Owner/A/E agreement?

▪ True.

▪Fals Ans: True

nProject descriptions and outline specifications are legal and binding documents?

▪ True.

▪False Ans: False

nThe contractor and the A/E review submittals for the same reasons and from the
same point of view?

▪ True.

▪False Ans: F

In 1964, the term "Project Manual" was introduced by the:

A. American Bar Association.

B. American Institute of Architects.

C. Construction Specifications Institute.

D. Department of Defense. Ans: B

© Get it right 2025 Getaway - Stuvia US All rights reserved

,Uniform Location of Subject Matterprepared by the EJCDC and jointly published by
EJCDC and AIA provides a recommended location of topics in all of the following
EXCEPT:

A. Supplementary Conditions.

B. Division 01.

C. Agreement.

D. Drawings. Ans: D

During the Planning/Pre-Design stage, the A/E may be retained to:

A. Develop outline specifications.

B. Describe the character of the mechanical system.

C. Prepare renderings.

D.Assist in financial feasibility studies Ans: D

During which project phase does the A/E review the Owner's program and budget
requirements and suggest alternative approaches?

A. Planning/Pre-Design.

B. Design.

C. Bidding/Negotiation.

D. Construction.

E. Post-Construction. Ans: B



© Get it right 2025 Getaway - Stuvia US All rights reserved

, A project's "life cycle" includes all of the following EXCEPT?

A. Planning/Design.

B. Financing.

C. Construction.

D. Evaluation.

E. Demolition. Ans: B

nThe Specification-type document prepared during the Design Development phase is
called the:

A. Outline Specification.

B. Rough Draft Specification.

C. UniFormat Elements. Ans: A

nThe contractual relationship governed by the Conditions of the Contract is between:

A. Owner and Contractor.

B. A/E and Contractor.

C. Owner and Subcontractors.

D.A/E and Subcontractors. Ans: A

nThe Agreement:

A. Establishes how the contract will be administered.



© Get it right 2025 Getaway - Stuvia US All rights reserved

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Shinnie University Of California - Berkeley
View profile
Follow You need to be logged in order to follow users or courses
Sold
20
Member since
11 months
Number of followers
0
Documents
4019
Last sold
3 days ago

Here's why you should trust us: Expertly Curated Content: Access high-quality, course-specific exam guides, notes, and practice questions created by Experts. Time-Saving Solutions: Save hours of study time with concise, easy-to-understand materials tailored to key exam topics. Proven Success: Our resources are designed to help you ace exams, boosting grades and confidence. Affordable Excellence: Get exceptional study materials at prices every student can afford.

Read more Read less
4.2

5 reviews

5
2
4
2
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions