Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

MQM 227 Exam 2 with Verified Answers

Document preview thumbnail
Preview 2 out of 13 pages

MQM 227 Exam 2 with Verified Answers

Content preview

MQM 227 Exam 2 with Verified Answers
1. Which of the following statements is incorrect?

a. Aggregate planning involves planning at a specific product/service level not a product family
level.

b. Scheduling decisions allocate available capacity or resources (equipment, labor, and space) to
jobs for a given period of time.

c. Aggregate planning seeks to determine the resources needed while scheduling allocates the
resources made available through aggregate planning in the best manner to meet operational
objectives.

d. Aggregate planning is done on a time frame of about one year; scheduling is done on a time
frame of a few months, weeks, or hours. —Answer: a. Aggregate planning involves planning at
a specific product/service level not a product family level.

2. Which of the following statements is incorrect?

a. The purpose of forecast accuracy is to determine when the forecasting method is no longer
tracking actual demand and should be reset.

b. Forecasting is only used to predict future events.

c. Through planning, we consciously attempt to alter future events.

d. Whenever demand is not constrained by capacity, inventory, or other management policies;
the forecasting of demand should be the same as the forecasting of sales.

e. The purpose of forecast accuracy is to monitor predictable demand observations or outliers
(which should be carefully evaluated and perhaps excluded from data analysis). —Answer: e.
The purpose of forecast accuracy is to monitor predictable demand observations or outliers
(which should be carefully evaluated and perhaps excluded from data analysis).

3. Which of the following statements is incorrect?

a. Batch and job shop processes generally have even lower utilization.

b. Assembly-line processes may set planned utilization at 80% to allow for flexibility to meet
unexpected demand.

c. In considering economies of scale, larger facilities are generally more economical because
fixed costs can be spread over more units of production.

d. A product-focused facility produces one family or type of product or service.



© 2025 All rights reserved

, e. In considering economies of scale, larger facilities are generally more economical because the
cost of buildings and equipment increases linearly with volume. —Answer: e. In considering
economies of scale, larger facilities are generally more economical because the cost of buildings
and equipment increases linearly with volume.

4. Which of the following options is not listed as a method of adding capacity to bottlenecks?

a. adding machine time (e.g., coverage during breaks)

b. reducing setup time

c. subcontracting

d. using different equipment if equally efficient —Answer: d. using different equipment if
equally efficient

5. Which of the following statements is incorrect?

a. A project is a permanent endeavor undertaken to create a unique product or service.

b. Large objects such as ships, buildings, and custom-made equipment are manufactured on a
project basis.

c. A project completion date and intermediate milestones are frequently established at the
outset.

d. The budget might impact the schedule if the company has a tight budget and is unwilling to
pay additional money to expedite critical components of the project. —Answer: a. A project is a
permanent endeavor undertaken to create a unique product or service.

6. Which of the following statements is incorrect?

a. Human resource planning is greatly affected by aggregate planning because planning for
future production can result in hiring, layoffs, training, and overtime decisions.

b. Demand management entails modifying or influencing demand by differential pricing which
is often used to reduce peak demand or to build up demand in off-peak periods.

c. Demand management entails modifying or influencing demand by using advertising and
promotion to stimulate and/or smooth out demand.

d. Demand management entails modifying or influencing demand by using backlogs
(customers waiting for late orders).

e. An aggregate plan should be the basis for final budget development and for budget revisions
as conditions warrant. —Answer: e. An aggregate plan should be the basis for final budget
development and for budget revisions as conditions warrant.

7. Which of the following statements is incorrect?


© 2025 All rights reserved

Document information

Uploaded on
October 25, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Passit
3.5
(23)
Sold
125
Followers
6
Items
14451
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions