SAFe | Advanced Scrum Master Practice Test (4.6) | 2019 -
Study online at https://quizlet.com/_hus2uf
1. `Which statement is true about the phase-gate milestone model and risk
reduction?: --- camila answer: A*
A. It does not mitigate risk as intended
B. It creates large batches of requirements
C. It reduces product increment values
D. It helps to visualize and limit WIP
--
https://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-working-systems/
2. `When does the Inspect and Adapt event happen?: --- camila answer: D
A. At the end of the System Demo
B. At the end of every two weeks
C. At the end of the second day of PI Planning
D. At the end of each PI
--
https://www.scaledagileframework.com/inspect-and-adapt/
3. `Who reviews the top capabilities for the upcoming PI?: --- camila answer: C*
A. Project Manager
B. Solution Architect/Engineer
C. Solution Management
D. Project Owner
--
https://www.scaledagileframework.com/product-and-solution-management/
4. `Why should team members continuously and actively engage with other
teams during PI Planning?: --- camila answer: C or A5'
-C
--A
A.To manage dependencies and resolve impediments
B. To understand how the other team is working
, SAFe | Advanced Scrum Master Practice Test (4.6) | 2019 -
Study online at https://quizlet.com/_hus2uf
C. To foster an environment of capacity and velocity
D. To create a backlog of features the team can adopt
--
https://www.scaledagileframework.com/pi-planning/
5. `What are two Release Train Engineer responsibilities? (Choose two.): --- camila
answer: A & C*
A. Facilitate PI Planning readiness and the event itself
B. Understand Customer needs; validate solutions
C. Drive relentless improvement through Inspect and Adapt
D. Build an effective Product Owner / Product Manager team
E. Manage and prioritize the flow of work to the program
--
https://www.scaledagileframework.com/release-train-engineer-and-solution-train-engineer/
6. `What anti-pattern can emerge during the Scrum of Scrums?: --- camila answer: D*
A. Scrum Masters bring in risks and impediments for escalation
B. Scrum Masters work with the Release Train Engineer to resolve risks and impediments
C. Scrum Masters have a daily 15 minute meet-after with the Release Train Engineer
D. Scrum Masters report on the teams' task status each day
--
https://www.agilest.org/scaled-agile/scrum-of-scrums/
--
https://www.scaledagileframework.com/scrum-master/
, SAFe | Advanced Scrum Master Practice Test (4.6) | 2019 -
Study online at https://quizlet.com/_hus2uf
7. `What action should be taken on Relentless Improvement Backlog items from
the Problem Solving Workshop?: --- camila answer: C * >
A. Assign points or prioritization levels
B. Calculate for cost before continuing
C. Use as direct input into the PI Planning session that follows
D. Assign to the team best suited to solve
--
https://www.scaledagileframework.com/inspect-and-adapt/
8. `According to Daniel Pink, which three factors drive motivation and lead to
better performance and personal satisfaction? (Choose three.): --- *camila answer: B,
C, F
A. Reward
B. Mastery
C. Purpose
D. Recognition
E. Responsibility
F. Autonomy
--
https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-workers/
9. `What are three Team Retrospective anti-patterns? (Choose three.): --- *camila
answer: A, B, C
A. When the Scrum Master decides what the Retrospective topic(s) will be and directs the team on specific improvement
items to work on
B. When the team's people manager comes in to observe
Study online at https://quizlet.com/_hus2uf
1. `Which statement is true about the phase-gate milestone model and risk
reduction?: --- camila answer: A*
A. It does not mitigate risk as intended
B. It creates large batches of requirements
C. It reduces product increment values
D. It helps to visualize and limit WIP
--
https://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-working-systems/
2. `When does the Inspect and Adapt event happen?: --- camila answer: D
A. At the end of the System Demo
B. At the end of every two weeks
C. At the end of the second day of PI Planning
D. At the end of each PI
--
https://www.scaledagileframework.com/inspect-and-adapt/
3. `Who reviews the top capabilities for the upcoming PI?: --- camila answer: C*
A. Project Manager
B. Solution Architect/Engineer
C. Solution Management
D. Project Owner
--
https://www.scaledagileframework.com/product-and-solution-management/
4. `Why should team members continuously and actively engage with other
teams during PI Planning?: --- camila answer: C or A5'
-C
--A
A.To manage dependencies and resolve impediments
B. To understand how the other team is working
, SAFe | Advanced Scrum Master Practice Test (4.6) | 2019 -
Study online at https://quizlet.com/_hus2uf
C. To foster an environment of capacity and velocity
D. To create a backlog of features the team can adopt
--
https://www.scaledagileframework.com/pi-planning/
5. `What are two Release Train Engineer responsibilities? (Choose two.): --- camila
answer: A & C*
A. Facilitate PI Planning readiness and the event itself
B. Understand Customer needs; validate solutions
C. Drive relentless improvement through Inspect and Adapt
D. Build an effective Product Owner / Product Manager team
E. Manage and prioritize the flow of work to the program
--
https://www.scaledagileframework.com/release-train-engineer-and-solution-train-engineer/
6. `What anti-pattern can emerge during the Scrum of Scrums?: --- camila answer: D*
A. Scrum Masters bring in risks and impediments for escalation
B. Scrum Masters work with the Release Train Engineer to resolve risks and impediments
C. Scrum Masters have a daily 15 minute meet-after with the Release Train Engineer
D. Scrum Masters report on the teams' task status each day
--
https://www.agilest.org/scaled-agile/scrum-of-scrums/
--
https://www.scaledagileframework.com/scrum-master/
, SAFe | Advanced Scrum Master Practice Test (4.6) | 2019 -
Study online at https://quizlet.com/_hus2uf
7. `What action should be taken on Relentless Improvement Backlog items from
the Problem Solving Workshop?: --- camila answer: C * >
A. Assign points or prioritization levels
B. Calculate for cost before continuing
C. Use as direct input into the PI Planning session that follows
D. Assign to the team best suited to solve
--
https://www.scaledagileframework.com/inspect-and-adapt/
8. `According to Daniel Pink, which three factors drive motivation and lead to
better performance and personal satisfaction? (Choose three.): --- *camila answer: B,
C, F
A. Reward
B. Mastery
C. Purpose
D. Recognition
E. Responsibility
F. Autonomy
--
https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-workers/
9. `What are three Team Retrospective anti-patterns? (Choose three.): --- *camila
answer: A, B, C
A. When the Scrum Master decides what the Retrospective topic(s) will be and directs the team on specific improvement
items to work on
B. When the team's people manager comes in to observe