MQM 227 Exam with Questions and Answers 100% Correct
*CHAPTER 2* - ✔✔
*CHAPTER 3* - ✔✔
*CHAPTER 5* - ✔✔
a firm that modifies a product design to utilize fewer parts and a "snap-in"
design rather than screws is likely using which concept?
a. design for manufacture and assembly
b. reliability engineering
c. concurrent engineering
d. design for environment
e. value analysis - ✔✔a. design for manufacture and assembly
a job shop is an example of a(n):
a. repetitive process
b. continuous process
c. line process
d. assembly-line process
e. specialized process - ✔✔e. specialized process
,a simple CPM network has five activities, A, B, C, D, and E. A is an immediate
predecessor of C and of D. B is also an immediate predecessor of C and of D. C
and D are both immediate predecessors of E. which of the following statements
is true?
a. there are two paths in the network
b. there are four paths in the network
c. there are five paths in the network
d. there are 25 paths in the network
e. there are six paths in the network - ✔✔b. there are four paths in the network
a strategy is a(n):
a. set of opportunities in the marketplace
b. broad statement of purpose
c. simulation used to test various product line options
d. plan for cost reduction
e. action plan to achieve the mission - ✔✔e. action plan to achieve the mission
by effective operations management, we can...
a. reduce costs of manufacturing
b. minimize amount of time customers wait in line
c. reduce the aesthetic appearance of goods
d. deliver products to customer more quickly
, e. produce using smallest input of resources - ✔✔b. minimize amount of time
customers wait in line
capacity planning can be influenced by _________.
a. product packaging requirements
b. demand volatility
c. product price
d. product quality
e. product features - ✔✔b. demand volatility
companies may install extra capacity in anticipation of future increases in
demand for their products or services. such extra capacity is called _______.
a. hedging capacity
b. overproduction capability
c. a capacity cushion
d. waste
e. flexible capacity - ✔✔c. a capacity cushion
first-tier suppliers refers to...
a. suppliers who provide components, systems, or finished goods and services
to the primary firm
*CHAPTER 2* - ✔✔
*CHAPTER 3* - ✔✔
*CHAPTER 5* - ✔✔
a firm that modifies a product design to utilize fewer parts and a "snap-in"
design rather than screws is likely using which concept?
a. design for manufacture and assembly
b. reliability engineering
c. concurrent engineering
d. design for environment
e. value analysis - ✔✔a. design for manufacture and assembly
a job shop is an example of a(n):
a. repetitive process
b. continuous process
c. line process
d. assembly-line process
e. specialized process - ✔✔e. specialized process
,a simple CPM network has five activities, A, B, C, D, and E. A is an immediate
predecessor of C and of D. B is also an immediate predecessor of C and of D. C
and D are both immediate predecessors of E. which of the following statements
is true?
a. there are two paths in the network
b. there are four paths in the network
c. there are five paths in the network
d. there are 25 paths in the network
e. there are six paths in the network - ✔✔b. there are four paths in the network
a strategy is a(n):
a. set of opportunities in the marketplace
b. broad statement of purpose
c. simulation used to test various product line options
d. plan for cost reduction
e. action plan to achieve the mission - ✔✔e. action plan to achieve the mission
by effective operations management, we can...
a. reduce costs of manufacturing
b. minimize amount of time customers wait in line
c. reduce the aesthetic appearance of goods
d. deliver products to customer more quickly
, e. produce using smallest input of resources - ✔✔b. minimize amount of time
customers wait in line
capacity planning can be influenced by _________.
a. product packaging requirements
b. demand volatility
c. product price
d. product quality
e. product features - ✔✔b. demand volatility
companies may install extra capacity in anticipation of future increases in
demand for their products or services. such extra capacity is called _______.
a. hedging capacity
b. overproduction capability
c. a capacity cushion
d. waste
e. flexible capacity - ✔✔c. a capacity cushion
first-tier suppliers refers to...
a. suppliers who provide components, systems, or finished goods and services
to the primary firm