Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

MQM 227 Ch. 21 Questions and Answers 100% Correct

Document preview thumbnail
Preview 3 out of 18 pages

MQM 227 Ch. 21 Questions and Answers 100% Correct

Content preview

MQM 227 Ch. 21 Questions and Answers 100% Correct
___ ___ are the amounts needed week by week in the future over and
above what is currently on hand or committed to through an order
already released and scheduled. - ✔✔Blank 1: Net
Blank 2: Requirements


___ ___ are the total amount required for a particular item. - ✔✔


___ ___ represent orders that have already been released and that
are scheduled to arrive as of the beginning of the period. -
✔✔Scheduled
Receipts


A ___ ___ is a company's attempt to provide a controlled window of
opportunity to make changes to the master production schedule. -
✔✔Blank 1: time
Blank 2: fence


A ___ requirement is the amount needed when the projected
available balance plus the scheduled receipts in a period are not
sufficient to cover the ___ requirements. - ✔✔Blank 1: net
Blank 2: gross

,A final assembly is made from standard options that the customer
chooses. - ✔✔Assemble-to-order


An EOQ lot sizing technique will try to minimize which of the following
costs given a fairly constant demand? Check all that apply.
Setup
Inventory holding
Marketing
Transportation - ✔✔Setup
Inventory holding


An item that can be produced and stocked as a subassembly is often
called a ___ bill-of-materials. - ✔✔modular


At any point in time, an MRP system can reference the ____ for
instantaneous parts availability to help meet gross requirements. -
✔✔inventory records file


Available to promise is a powerful tool for what? - ✔✔Coordinating
sales and production activities


BoM - ✔✔Identifies the specific materials used to make each item and
the correct quantities of each.

, EOQ assumes that parts are used ___ during the period. -
✔✔continuously


EOQ was not designed for a system like MRP. Why not? - ✔✔MRP has
discrete time periods


Examples: piston rings, electrical switches. What is the industry type?
- ✔✔Make-to-stock


Examples: trucks, generators, motors. What is the industry type? -
✔✔Assemble-to-order


Examples: turbine generators, heavy machine tools. What is the
industry type? - ✔✔Engineer-to-order


Finished goods purchased by individuals external to the organization
are considered what? - ✔✔Independent demand items


For Ford Motor Company, which of the following items would appear
on its master production schedule? Check all that apply.
Hoses
Engines
Cars
Fan belts

Document information

Uploaded on
October 24, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsCentre
3.7
(3)
Sold
13
Followers
0
Items
1709
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions