VA DEQ ESC Inspector Exam questions
|\ |\ |\ |\ |\ |\




with answers |\




VESCP - CORRECT ANSWERS ✔✔Virginia Erosion and Sediment
|\ |\ |\ |\ |\ |\ |\ |\


Control Program |\




- Administered by counties/cities (must), towns (may)
|\ |\ |\ |\ |\ |\




- MUST BE APPROVED
|\ |\ |\




Minimum Standard 1 - CORRECT ANSWERS ✔✔Stabilization
|\ |\ |\ |\ |\ |\




permanent or temporary soil stabilization shall be applied to
|\ |\ |\ |\ |\ |\ |\ |\ |\


denuded areas within seven days after final grade is reached on
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


any portion of the site; temporary soil stabilization shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


applied within seven days to denuded areas that may not be at
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


final grade but will remain dormant for longer than 14 days;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


permanent stabilization shall be applied to areas that are to be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


left dormant for more than one year
|\ |\ |\ |\ |\ |\




Site NOT at Final Grade - CORRECT ANSWERS ✔✔- stabilize in 14
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


days
- temporarily seed
|\ |\




- mulch
|\




- permanently stabilize if dormant > 1 year
|\ |\ |\ |\ |\ |\ |\

,Site at Final Grade - CORRECT ANSWERS ✔✔- stabilize in 7 days
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


(recommended immediately) |\




- permanently or temporarily seed and mulch
|\ |\ |\ |\ |\ |\




- mulch/matting/straw
|\




Minimum Standard 2 - CORRECT ANSWERS ✔✔Stock Piles, Waste
|\ |\ |\ |\ |\ |\ |\ |\ |\


and Borrow Areas
|\ |\




during construction, soil stock piles and borrow areas shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


stabilized or protected with sediment trapping measures
|\ |\ |\ |\ |\ |\




mulch prevents erosion by protecting the surface from raindrop
|\ |\ |\ |\ |\ |\ |\ |\ |\


impact and silt fence intercepts and detains from disturbed areas
|\ |\ |\ |\ |\ |\ |\ |\ |\




Minimum Standard 3 - CORRECT ANSWERS ✔✔Permanent
|\ |\ |\ |\ |\ |\ |\


Vegetation


permanent vegetation cover shall be established on denuded
|\ |\ |\ |\ |\ |\ |\ |\


areas not otherwise permanently stabilized (permanent
|\ |\ |\ |\ |\ |\


vegetation shall not be considered established until a ground
|\ |\ |\ |\ |\ |\ |\ |\ |\


cover is achieved that is uniform, mature enough to survive, and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


will inhibit erosion *there is no % associated with this*)
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\




reduce erosion and decrease sediment yield from disturbed area
|\ |\ |\ |\ |\ |\ |\ |\




this is the standard used to verify that a site is ready for release
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


of bonds or surety
|\ |\ |\

,Minimum Standard 4 - CORRECT ANSWERS ✔✔First-Step
|\ |\ |\ |\ |\ |\ |\


Measures


Sediment basins and traps, perimeter dikes, sediment barriers
|\ |\ |\ |\ |\ |\ |\ |\


and other measures intended to trap sediment shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\


constructed as a first step in any land-disturbing activity and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


shall be made functional before upslope land disturbance takes
|\ |\ |\ |\ |\ |\ |\ |\ |\


place


a certain amount of initial land disturbance may be required to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


provide access for equipment to install the perimeter controls,
|\ |\ |\ |\ |\ |\ |\ |\ |\


but site clearing and grading should be kept to a minimum until
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


the perimeter controls are in place
|\ |\ |\ |\ |\




intercepts and detains small amounts of sediment from disturbed
|\ |\ |\ |\ |\ |\ |\ |\


areas during construction operation to prevent sediment from
|\ |\ |\ |\ |\ |\ |\ |\ |\


leaving the site and decrease velocity of sheet flows and low-to-
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


moderate level channel flow |\ |\ |\




Perimeter Controls - CORRECT ANSWERS ✔✔assures that
|\ |\ |\ |\ |\ |\ |\


sediment does not leave the perimeter of the land-disturbing
|\ |\ |\ |\ |\ |\ |\ |\ |\


area once site clearing, grading, and construction commences
|\ |\ |\ |\ |\ |\ |\




Examples: silt fences, sediment traps, sediment basins,
|\ |\ |\ |\ |\ |\ |\


construction entrance, temporary diversions, diversions |\ |\ |\ |\




Minimum Standard 5 - CORRECT ANSWERS ✔✔Earthen Structure
|\ |\ |\ |\ |\ |\ |\ |\


Stabilization

, stabilization measures shall be applied to earthen structures such
|\ |\ |\ |\ |\ |\ |\ |\


as dams, dikes, and diversions immediately after installation
|\ |\ |\ |\ |\ |\ |\ |\




reduce erosion and sedimentation and reduce damage from
|\ |\ |\ |\ |\ |\ |\ |\


sediment and runoff to downstream or off-site areas
|\ |\ |\ |\ |\ |\ |\




Minimum Standard 6 - CORRECT ANSWERS ✔✔Traps and Basins
|\ |\ |\ |\ |\ |\ |\ |\




sediment traps and basins shall be designed and constructed
|\ |\ |\ |\ |\ |\ |\ |\ |\


based upon the total drainage area (not just disturbed area) to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


be served by the trap or basin
|\ |\ |\ |\ |\ |\




Sediment Traps - CORRECT ANSWERS ✔✔minimum storage
|\ |\ |\ |\ |\ |\ |\


capacity shall be 134 cubic yards per acre of drainage area and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


shall only control drainage areas less than 3 acres
|\ |\ |\ |\ |\ |\ |\ |\




*stone outlet = trap* |\ |\ |\




Sediment Basins - CORRECT ANSWERS ✔✔surface runoff from
|\ |\ |\ |\ |\ |\ |\ |\


disturbed areas that is comprised of flow from drainage areas
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


greater than or equal to 3 acres shall be controlled by a basin;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


minimum storage capacity of a sediment basin shall be 134 cubic
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


yards per acre of drainage area; the outfall system shall, at a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


minimum, maintain the structural integrity of the basin during a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


25-year storm of 24-hour duration; runoff coefficients used in
|\ |\ |\ |\ |\ |\ |\ |\ |\


runoff calculations shall correspond to a bare earth condition or
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


those conditions expected to exist while the sediment basin is
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


utilized.

Document information

Uploaded on
October 24, 2025
Number of pages
42
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$24.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMSTUDYPLUG
4.5
(241)
Sold
380
Followers
108
Items
20758
Last sold
16 hours ago

Reviews from verified buyers



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions