Exam Review | 138 Comprehensive
Questions & Answers | Grade A |
100% Correct
Quiz_________________?
GSPCC -
Answer☑️
Georgia Structural Pest Control Commission
Quiz_________________?
GDA -
Answer☑️
Georgia Department of Agriculture
Quiz_________________?
FIFRA -
Answer☑️
Federal Insecticide, Fungicide, and Rodenticide Act 1947
Regulate the registration and labeling of pesticides.
Amended in 1972 to include classification systems for types of pesticides and created
requirements for:
-Certification of applicators authorized to apply pesticides
-Safety of workers using pesticides
-Protection of environment from contamination by pesticides
-Creation of EPA to administer FIFRA
Quiz_________________?
EPA -
Answer☑️
Environmental Protection Agency
1
, Quiz_________________?
Endangered Species Act of 1973 -
Answer☑️
Required EPA to ensure that using registered pesticides would not harm species placed
on endangered species list.
Quiz_________________?
FQPA -
Answer☑️
Food Quality Protection Act of 1996
Amended FIFRA and directed EPA to regulate pesticides through establishment of
tolerance levels for pesticides from dietary, drinking water, and non-occupational
(residential) exposure in conjunction with the Federal, Food, Drug, and Cosmetic Act.
Quiz_________________?
In order to obtain a registration, EPA and GDA require pesticide manufactures provide
what information to the EPA? -
Answer☑️
-Toxicity of the pesticide
-Hazard to the applicator
-Effect on the environment
Quiz_________________?
OSHA -
Answer☑️
Occupational Safety and Health Administration 1970
Any company with 10 or more employees to keep certain records and make reports
including all work related deaths, injuries, and illnesses.
Quiz_________________?
SPCA -
Answer☑️
Structural Pest Control Act
Primary law for the pest management industry in Georgia.
The Department of Agriculture is the enforcement agency for the SPCA.
Quiz_________________?
Requirements for Georgia SPCA -
Answer☑️
Company License
-All pest management companies must be licensed before they begin operation
Certified Operator
-Every pest management company (branch) must employee at least one person who
has taken and passed the certification exam.
2
, Registered Employees
-all non-certified technicians must be registered, in order to work without the presence
of a certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered
periodically.
Re-certification
-5 years
-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
-WDO- 8 hours
-FUM- 3 hours
Quiz_________________?
Designated Certified Operators (DCO) Categories -
Answer☑️
WDO- Wood Destroying Organisms
HPC- Household Pest Control
FUM- Fumigation
Quiz_________________?
Contracts for Control of WDO -
Answer☑️
A contract must be issued for every WDO service before the work begins.
Copied must be kept for 2 years following the expiration of the contract.
Quiz_________________?
Comprehensive Post Construction Soil Termiticide Application for Subterranean
Termites -
Answer☑️
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils
Quiz_________________?
Defined Post Construction Soil Termiticide Application for Subterranean Termites -
Answer☑️
Removal of all cellulosic material from under the building
3
, Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
Quiz_________________?
Post Construction Soil Termiticide Application for Subterranean Termites, Other than
Baits -
Answer☑️
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Quiz_________________?
Post Construction Termiticide Bait Application for Subterranean Termites -
Answer☑️
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Quiz_________________?
Pre-Construction Termiticide Bait Application for Subterranean Termites -
Answer☑️
Systems must be monitored for one year at no additional cost when installed for pre-
construction or to control infestations found during the coverage period of an official
Georgia Wood Infestation Inspection Report.
Quiz_________________?
Alternate Application Techniques (AAT) -
Answer☑️
AATs must be approved by the commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas
specified in defined, comprehensive, or pre-construction treatments
Quiz_________________?
Treatment of Powder Post Beetles and Wood Borers -
Answer☑️
Application of an approved pesticide
4