SPORT FACILITIES MANAGEMENT EXAM 2 QUESTIONS AND ANSWERS What are the two primary way to build a sport facility? - CORRECT ANSWER1st: determine how much money might be available for the project then fit the facility into the budget. 2nd: the planned approach; entails examining what is specifically needed and then developing an ideal facility within rough cost constraints.

Content preview

SPORT FACILITIES MANAGEMENT EXAM 2 QUESTIONS AND ANSWERS
What are the two primary way to build a sport facility? - CORRECT ANSWER✅✅1st: determine how
much money might be available for the project then fit the facility into the budget.

2nd: the planned approach; entails examining what is specifically needed and then developing an ideal
facility within rough cost constraints.



What are the four phases in the construction process? - CORRECT ANSWER✅✅1. programming phase:
deciding what to build; examining space, cost, and other criteria; deciding what events will be held at
the facility, including capacity and amenities issues; deciding the number and location of food and
beverage preparation and sales areas; finalizing support areas that will be needed.

2. design phase: designing the facility with architects; preparing schematic drawings and cost estimates;
developing the design and adding details such as HVAC systems; reviewing and verifying the documents;
reviewing operations to ensure that systems will operate as intended; preparing construction, legal, and
bidding documents.

3. construction phase: awarding the contract after checking references and qualifications of all parties;
developing the construction schedule through substantial completion of the facility; completing the
construction process and change orders; going through the inspection process.

4. occupancy phase: finishing, including completing punch lusts; obtaining the occupancy permit; doing
facility maintenance and renovations.



Understand each of the construction process phases. - CORRECT ANSWER✅✅construction phase:
awarding the contract after checking references and qualifications of all parties; developing the
construction schedule through substantial completion of the facility; completing the construction
process and change orders; going through the inspection process.



Know what the difference is between requests for qualifications, requests for proposals, and request for
bids. - CORRECT ANSWER✅✅Request for qualifications: helps determine which companies meet the
minimum requirements for building the facility.

Request for proposals: requests a particular action; can ask a company how it would propose solving a
problem or what price it would charge to build a facility.

Request for bids: an RFQ decides what companies are qualified and those companies will receive an RFB
and are asked to bid on a project.

, What is a Turnkey contract? - CORRECT ANSWER✅✅a contract in which a construction company builds
the facility with very little input from the future owner; when the construction is completed, the
construction company turns the keys of the new building over to the new owner.



What is a Design-build contract? - CORRECT ANSWER✅✅similar to turnkey contract with exception that
the owner, rather than the builder, provides the land and may control the schedule and budget.



What are two of the drawing types created during the preconstruction phase? - CORRECT
ANSWER✅✅site drawings, plumbing drawings show, structural drawings, architectural drawings,
mechanical drawings, and electrical drawings.



Know the five construction elements. - CORRECT ANSWER✅✅foundation material, structure and load,
superstructure, exterior components, and internal components.



What is the substructure of a facility? - CORRECT ANSWER✅✅the level at and below ground level.



What is the superstructure of a facility? - CORRECT ANSWER✅✅everything above the substructure and
includes the framing, columns, beams, and trusses.



Why is it more expensive to remodel a facility than to build a new one? - CORRECT
ANSWER✅✅renovations need to comply with current building codes and laws rather than the rules
when it was made.



What are the six areas that costs might occur in a project? - CORRECT ANSWER✅✅1. preliminary costs:
acquisition of site; site decontamination; site development; legal fees; cost of bond issues; promotion
and publicity; preliminary architect fees for preparation of preliminary fees; consultant fees (legal, tax,
bonds, polling, political).

2. architectural fees: preparation of architectural and engineering plans; supervision of construction;
engineering requirements.

3. Construction costs: building contract and subcontracts; supervision costs; building permits.

4. FFE (up to 15% of the total budget): building; outdoor play areas.

5. Insurance costs to pay the facility developer if the construction company fails to complete the project.

Document information

Uploaded on
October 19, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES
3.4
(14)
Sold
92
Followers
1
Items
12010
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions