CDC MASTERY PRACTICE TEST REVIEW QUESTIONS
What provides the basis for the minimum equipment and supplies a unit requires to
support its maximum simultaneous deployment responsibility? x - Answer -The total
number of AW* and DW* coded UTCs in UTC Availability for their wing/installation
What information source is required to view an asset's status in the Global
Transportation Network (GTN) as it goes from origin to destination? - Answer -
Movement data
If an impasse relating to an entire agreement cannot be resolved at base level, then the
- Answer -support agreement manager (SAM) and receiver send the impasse to their
major commands (MAJCOM) for resolution
If an Installation Deployment Officer (IDO) does not stand up the Deployment Control
Center (DCC), then who is responsible for all daily tasking requirements? - Answer -
Installation Deployment Readiness Cell (IDRC)
Which functional level is responsible for associating, tracking, and managing personnel
and equipment in unit type codes (UTC) and assigning them to the proper Air and
Space Expeditionary Force (AEF)? x - Answer -Unit commander or equivalent level
supervisor
As part of the Integrated Deployment System (IDS), which system maintains unit type
code (UTC) logistics detail? x - Answer -Logistics Module (LOGMOD)
What type of plan is an abbreviated form of an operation plan (OPLAN)? x - Answer -
Concept
What type of plan is prepared by the supporting combatant commanders when they are
assisting the supported commander's contingency plans? - Answer -Supporting
What uniquely identifies each unit in the time-phased force and deployment data
(TPFDD)? - Answer -Unit line number (ULN)
What community refers to the participating in the overall strategic planning of the Armed
Forces? - Answer -Joint Strategic Planning Community
The responsibility for organizing, training, and equipping aerospace forces to meet
combatant commander (CCDR) requirements is the x - Answer -Headquarters USAF
(HAF)
Deployable manpower authorizations that cannot be described by or do not fit an
existing standard deployable unit type code (UTC) will be postured into - Answer -an
associate UTC
,Which function do noncommissioned officers (NCO) provide during base support and
expeditionary site planning processes? x - Answer -Conduct training for subordinate
and tenant units
What kind of order does the Secretary of Defense (SECDEF) approve and transmit to
the supported commander and Joint Planning and Execution Community (JPEC)
announcing the selected course of action (COA)? x - Answer -Alert
Unit commanders are responsible for appointing unit cargo increment monitors in writing
to x - Answer -the host Logistics Plans function
A deployed unit commander ensures a redeployment plan is executed in accordance
with time phased force deployment data (TPFDD) by - Answer -having their logistics
planner coordinate strategic airlift moves with the major command (MAJCOM)
Unit type codes (UTCs) reflect potential capabilities that consists of - Answer -both
manpower and equipment
What work center provides overall direction and coordination of reception and beddown
procedures? - Answer -Reception control center (RCC)
What is the first step when conducting a deployment staff assistance visit (SAV)? -
Answer -Schedule the meeting with the unit
Establishing broad, Total Force (active duty, Air Reserve Component, civilian)
personnel and manpower policy and guidance is the responsibility of which functional
area? x - Answer -Deputy Chief of Staff, Personnel
A personnel or material deficiency that has a critical negative impact on a unit to
perform its wartime mission is a - Answer -limiting factor
When dealing with the vehicle authorization listing (VAL), what use codes are logistics
planners mainly concerned with? - Answer -L, M
Who manages the status of cargo, updates completion times in the Schedule module of
the Logistics Module (LOGMOD), identifies potential bottlenecks and works with Cargo
Deployment Function (CDF) personnel, units, and Deployment Control Center (DCC) to
ensure cargo is processed on time? - Answer -Controllers
Who is responsible to report the status of unit type codes (UTC) in Air and Space
Expeditionary Forces Reporting Tool (ART)? x - Answer -Unit commander
What component of Manpower and Equipment Force Packaging System (MEFPAK)
resides in the Logistics Module (LOGMOD) and is used to collect and store the materiel
requirements for UTCs? x - Answer -Logistics Force Packaging Subsystem (LOGFOR)
, Who accompanies the war readiness materiel (WRM) noncommissioned officer
(WRMNCO) on surveillance visits to provide technical expertise? x - Answer -WRM
manager (WRMM)
Which deployment tool is used to ensure time-phased force and deployment data
(TPFDD) is maintained in accordance with the operations plan (OPLAN) it supports? x -
Answer -Joint Operation Planning and Execution System (JOPES)
Who appoints an installation Base Support and Expeditionary Planning Tool (BAS&E)
office of primary responsibility (OPR) in writing? - Answer -Wing commander
What is an equipment requirement for the Unit Deployment Control Center (UDCC)? x -
Answer -Robust communications
What are the two parts of the war consumable distribution objective (WCDO)? - Answer
-Munitions and nonmunitions
Deployment data for all Department of Defense (DOD) unit type codes (UTC) is
contained in which file? - Answer -Type unit characteristics (TUCHA)
How many phases are there in the crisis action planning (CAP) process? - Answer -6
Conducting readiness assessment is critical to - Answer -measure a unit's ability to
deploy and sustain forward operation
Who is responsible for costs associated with war readiness materiel (WRM)
reconstitution after direct mission support use? x - Answer -Storing command
Who is responsible for requesting support, and how is the support initially requested? -
Answer -Receiver, in writing
What type of order is used to prepare forces to deploy or deploy forces without
approving the execution of a plan or operations order (OPORD)? x - Answer -
Deployment
When assessing unit type codes (UTC), commanders rate each UTC against the unit's -
Answer -current ability to support deployments
What is the basic difference between a shortfall and a reclama? x - Answer -The
shortfall is the deficiency and the reclama is the process that identifies the deficiency
Who is ultimately responsible for making every effort to ensure approved levels of
support are requisitioned, stored, and maintained ready for use? - Answer -Installation
commander
What provides the basis for the minimum equipment and supplies a unit requires to
support its maximum simultaneous deployment responsibility? x - Answer -The total
number of AW* and DW* coded UTCs in UTC Availability for their wing/installation
What information source is required to view an asset's status in the Global
Transportation Network (GTN) as it goes from origin to destination? - Answer -
Movement data
If an impasse relating to an entire agreement cannot be resolved at base level, then the
- Answer -support agreement manager (SAM) and receiver send the impasse to their
major commands (MAJCOM) for resolution
If an Installation Deployment Officer (IDO) does not stand up the Deployment Control
Center (DCC), then who is responsible for all daily tasking requirements? - Answer -
Installation Deployment Readiness Cell (IDRC)
Which functional level is responsible for associating, tracking, and managing personnel
and equipment in unit type codes (UTC) and assigning them to the proper Air and
Space Expeditionary Force (AEF)? x - Answer -Unit commander or equivalent level
supervisor
As part of the Integrated Deployment System (IDS), which system maintains unit type
code (UTC) logistics detail? x - Answer -Logistics Module (LOGMOD)
What type of plan is an abbreviated form of an operation plan (OPLAN)? x - Answer -
Concept
What type of plan is prepared by the supporting combatant commanders when they are
assisting the supported commander's contingency plans? - Answer -Supporting
What uniquely identifies each unit in the time-phased force and deployment data
(TPFDD)? - Answer -Unit line number (ULN)
What community refers to the participating in the overall strategic planning of the Armed
Forces? - Answer -Joint Strategic Planning Community
The responsibility for organizing, training, and equipping aerospace forces to meet
combatant commander (CCDR) requirements is the x - Answer -Headquarters USAF
(HAF)
Deployable manpower authorizations that cannot be described by or do not fit an
existing standard deployable unit type code (UTC) will be postured into - Answer -an
associate UTC
,Which function do noncommissioned officers (NCO) provide during base support and
expeditionary site planning processes? x - Answer -Conduct training for subordinate
and tenant units
What kind of order does the Secretary of Defense (SECDEF) approve and transmit to
the supported commander and Joint Planning and Execution Community (JPEC)
announcing the selected course of action (COA)? x - Answer -Alert
Unit commanders are responsible for appointing unit cargo increment monitors in writing
to x - Answer -the host Logistics Plans function
A deployed unit commander ensures a redeployment plan is executed in accordance
with time phased force deployment data (TPFDD) by - Answer -having their logistics
planner coordinate strategic airlift moves with the major command (MAJCOM)
Unit type codes (UTCs) reflect potential capabilities that consists of - Answer -both
manpower and equipment
What work center provides overall direction and coordination of reception and beddown
procedures? - Answer -Reception control center (RCC)
What is the first step when conducting a deployment staff assistance visit (SAV)? -
Answer -Schedule the meeting with the unit
Establishing broad, Total Force (active duty, Air Reserve Component, civilian)
personnel and manpower policy and guidance is the responsibility of which functional
area? x - Answer -Deputy Chief of Staff, Personnel
A personnel or material deficiency that has a critical negative impact on a unit to
perform its wartime mission is a - Answer -limiting factor
When dealing with the vehicle authorization listing (VAL), what use codes are logistics
planners mainly concerned with? - Answer -L, M
Who manages the status of cargo, updates completion times in the Schedule module of
the Logistics Module (LOGMOD), identifies potential bottlenecks and works with Cargo
Deployment Function (CDF) personnel, units, and Deployment Control Center (DCC) to
ensure cargo is processed on time? - Answer -Controllers
Who is responsible to report the status of unit type codes (UTC) in Air and Space
Expeditionary Forces Reporting Tool (ART)? x - Answer -Unit commander
What component of Manpower and Equipment Force Packaging System (MEFPAK)
resides in the Logistics Module (LOGMOD) and is used to collect and store the materiel
requirements for UTCs? x - Answer -Logistics Force Packaging Subsystem (LOGFOR)
, Who accompanies the war readiness materiel (WRM) noncommissioned officer
(WRMNCO) on surveillance visits to provide technical expertise? x - Answer -WRM
manager (WRMM)
Which deployment tool is used to ensure time-phased force and deployment data
(TPFDD) is maintained in accordance with the operations plan (OPLAN) it supports? x -
Answer -Joint Operation Planning and Execution System (JOPES)
Who appoints an installation Base Support and Expeditionary Planning Tool (BAS&E)
office of primary responsibility (OPR) in writing? - Answer -Wing commander
What is an equipment requirement for the Unit Deployment Control Center (UDCC)? x -
Answer -Robust communications
What are the two parts of the war consumable distribution objective (WCDO)? - Answer
-Munitions and nonmunitions
Deployment data for all Department of Defense (DOD) unit type codes (UTC) is
contained in which file? - Answer -Type unit characteristics (TUCHA)
How many phases are there in the crisis action planning (CAP) process? - Answer -6
Conducting readiness assessment is critical to - Answer -measure a unit's ability to
deploy and sustain forward operation
Who is responsible for costs associated with war readiness materiel (WRM)
reconstitution after direct mission support use? x - Answer -Storing command
Who is responsible for requesting support, and how is the support initially requested? -
Answer -Receiver, in writing
What type of order is used to prepare forces to deploy or deploy forces without
approving the execution of a plan or operations order (OPORD)? x - Answer -
Deployment
When assessing unit type codes (UTC), commanders rate each UTC against the unit's -
Answer -current ability to support deployments
What is the basic difference between a shortfall and a reclama? x - Answer -The
shortfall is the deficiency and the reclama is the process that identifies the deficiency
Who is ultimately responsible for making every effort to ensure approved levels of
support are requisitioned, stored, and maintained ready for use? - Answer -Installation
commander