Which one of the Following is not a Project Delivery System?
At-Risk CM
Design-Bid-Build
© 2025 Assignment Expert
Professional CM (Agency CM)
Multiple Prime Contracting [ Ans: ] Professional CM (Agency CM)
In lump-sum contracts, the Owner assumes the risk of the cost
Guru01 - Stuvia
True or False [ Ans: ] False
Typically, The design reviewer has the ultimate responsibility and
authority to make executive decisions to matters affecting time
and money in a construction project
True or False [ Ans: ] False
In The Design-Build Project delivery system, the Owner has
separate contracts with the Designer and the Contractor
True or False [ Ans: ] False
The Resident Project Representative should stop the work of the
Contractor when the work is not performed according to the
drawings and specifications
True or False [ Ans: ] False
Which of the Following should not be performed by the Resident
Project Representative?
, 2
For Expert help and assignment solutions, +254707240657
1. Ensuring that all work activities of contractor are inspected daily
2. Providing instructions directly to subcontractors
3. Approving the work that meets the contract requirements
4. Following up the work that requires corrections [ Ans: ] 2.
Providing instructions directly to subcontractors
Which of the following is not true for the construction diary?
1. Every working day should be reported even if no work is
reported
© 2025 Assignment Expert
2. It should be in ink if it is handwritten
3. There should be page numbers on every page
4. Entries should be made on a weekly basis [ Ans: ] 4. Entries
Guru01 - Stuvia
should be made on a weekly basis
Ambiguous language in a contract is interpreted against the party
who selected the language or supplied the contract
True or False [ Ans: ] True
According to Spearin Doctrine, when the contractor exactly
follows the detail specifications and drawings, she/he will not be
responsible for unsatisfactory results in the end product
True or False [ Ans: ] True
Shop Drawings Can be used as change orders
True or False [ Ans: ] False
Which one of the following is not an element of the contract as
we discussed in class?
For Expert help and assignment solutions, +254707240657
Con 367 Final Exam Questions and
Answers (100% Correct Answers) Already
Graded A+
Which one of the Following is not a Project Delivery System?
At-Risk CM
Design-Bid-Build
© 2025 Assignment Expert
Professional CM (Agency CM)
Multiple Prime Contracting [ Ans: ] Professional CM (Agency CM)
In lump-sum contracts, the Owner assumes the risk of the cost
Guru01 - Stuvia
True or False [ Ans: ] False
Typically, The design reviewer has the ultimate responsibility and
authority to make executive decisions to matters affecting time
and money in a construction project
True or False [ Ans: ] False
In The Design-Build Project delivery system, the Owner has
separate contracts with the Designer and the Contractor
True or False [ Ans: ] False
The Resident Project Representative should stop the work of the
Contractor when the work is not performed according to the
drawings and specifications
True or False [ Ans: ] False
Which of the Following should not be performed by the Resident
Project Representative?
, 2
For Expert help and assignment solutions, +254707240657
1. Ensuring that all work activities of contractor are inspected daily
2. Providing instructions directly to subcontractors
3. Approving the work that meets the contract requirements
4. Following up the work that requires corrections [ Ans: ] 2.
Providing instructions directly to subcontractors
Which of the following is not true for the construction diary?
1. Every working day should be reported even if no work is
reported
© 2025 Assignment Expert
2. It should be in ink if it is handwritten
3. There should be page numbers on every page
4. Entries should be made on a weekly basis [ Ans: ] 4. Entries
Guru01 - Stuvia
should be made on a weekly basis
Ambiguous language in a contract is interpreted against the party
who selected the language or supplied the contract
True or False [ Ans: ] True
According to Spearin Doctrine, when the contractor exactly
follows the detail specifications and drawings, she/he will not be
responsible for unsatisfactory results in the end product
True or False [ Ans: ] True
Shop Drawings Can be used as change orders
True or False [ Ans: ] False
Which one of the following is not an element of the contract as
we discussed in class?