100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CMGT Final Exam Questions And Answers

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
17-10-2025
Written in
2025/2026

Project Management - ANS A discipline has come about to respond to client needs for the construction of more complex projects, to be built faster and more cost effectively. Associated Schools of Construction (ASC) - ANS 1965 nine universities met in Florida and formed this to promote construction management as a legitimate and unique area of study at universities. Steel - ANS In the 1800's this was introduced to allow for high- rise buildings. Objective of Project Management - ANS May be said to be the achievement of predetermined specifics within given targets of time, quality, cost and scope. But, the measured of success of the project is the maintenance of relationships and perceived satisfaction of all the stakeholders after significant trade offs being made during the life cycle to maintain scope, quality, time and budget. Heavy Civil - ANS 10% Roadways, Bridges, Tunnels, Dams, Airports, and Railways Mostly publicly funded. Horizontal Construction Industrial - ANS Steel mills, Processing plans, Manufacturing plants, Pipe lines, Electrical generating facilities, Oil refineries, Chemical processing plants. Mostly publicly funded. Least affected by economic fluctuations. Quality and time most important. Funding Sources - ANS 36% Public 64% Private Public Building: 10% Public Non-building: 12% Private Building: 71% Private Non-building: 7% Specialization - ANS Range of specialties helps insulate agains economic down turns. Framing, Mechanical, Demolition, Roofing, Electrical, Public works and Roads are major categories. Joint Venture/ Pooling Expertise - ANS As projects grow in size and complexity and contracts become schedule- oriented in order to mitigate costs, on- time completion becomes essential, firms pool expertise and financial resources for project bidding. Construction Management, Design- Build - ANS The technological sophistication of many projects and increased popularity of design-build contracts encourage the integration of construction managers, architects, engineers and construction companies. Repeat Business - ANS Bypassing bidding altogether and going with established relationships over low cost. Ethics - ANS American Institute of Contractors Code of Ethics. Bid Shopping. Being able to trust people we work with is a big part of putting our best effort into our work. Key success is creating a trusting environment in which people feel comfortable with each other. Iron Triangle - ANS These Construction Variables are Linked: Schedule, Cost, and Quality Change in one will affect the others: Projects done faster require more financial resources and quality may be compromised. High technical performance... increased time and money to complete. Architect - ANS Lead Designer. Creates Concept Drawings. Staff include Drafters/ CAD Operators, Specification Writers, Interior Designers, Landscape Architects. Anxious to provide a good design service and build a reputation for future work, perhaps creating a professional image in the final building. Respond to design requirements by first responding to and identifying the important elements of design (activities occurring in the building- feature requests) elements of design are key. Engineers - ANS Is the lead designer for infrastructure and industrial work. Building work, engineers brought in after concept is finalized but before details are developed. Types: Structural, Mechanical, Electrical, Civil, and Surveyors. Designs building systems, foundations, structural, mechanical, electrical and landscaping. 25%- 65% of construction costs go into engineering systems. Engineers approach is different as engineers break projects down into components and functional aspects are key. Prime Contractor - ANS Is anxious to maximize profit, especially if severe market competition have resulted in tight firm- price margins. (Firm- Price Margins are bids with low profit and overhead margins) Prime contractor is a general term to define the responsibility for all construction activities: Project manager Superintendents estimators Schedulers Purchasing agents Specialty contractors Building Trades - ANS Open shop/ Merit shop (ABC) and union shops. Open shops/ Merit shops are non- union operators. Open shops compete with unions on cost but not skilled labor. Open shops generally use skilled lead people to supervise semi- skilled labor. Unions heavily weighted toward skilled labor with apprenticeship programs. Material Suppliers - ANS Create installation standards though trade association which are often incorporated into codes. Equipment Suppliers - ANS Rent vs. Owning equipment Project Stakeholders - ANS Persons with a contractual or legal obligation to the project team and have the responsibility and authority to manage and commit resources according to schedule, cost, and technical performance objectives. Architect GC Subs Employees Suppliers Lenders Sureties Insurance Companies Project Delivery System - ANS Provides various combinations of project players and contract arrangements that define each players specific risks and responsibilities to achieve the owners project goals. Project Delivery Methods - ANS Traditional Design- Bid- Build Design- Build Construction Management (agent/ at risk) Contractual Arrangements Types - ANS Lump sum Cost- Plus a fee Unit costs Guarantee max CM at risk Design- Bid- Build - ANS Owner gets best price.

Show more Read less
Institution
CMGT
Course
CMGT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CMGT
Course
CMGT

Document information

Uploaded on
October 17, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

final exam cmgt Questions With
Complete Solutions




A
R
U
LA
C
O
D

, Builders Risk - ANS What is the name of the insurance that covers buildings while under
construction?

The Owner is allowed to do this when:
Defective work is not remedied
Failure of contractor to pay subs




A
Evidence that the work cannot be complete within the contract time - ANS What is withhold
payment?




R
The Owner may at anytime terminate the contract without cause. - ANS What is the
"termination for convenience" clause.

This specifications and contract drawings are two of these. - ANS What are the Contract



U
Documents?

The owner issues this to start the project. The time of performance for the contractor is
LA
measured from this. - ANS What is the NTP?

When an owner issues this to a contractor, the contractor proceeds with the work right away and
submits the price later. - ANS What is a CCD?

This type of delay could occur when a contractor encounters unusual or severe weather. - ANS
C

What is an excusable delay?

Arbitration and Mediation are forms of this. - ANS What is ADR?
O


The process of accelerating an activity or multiple activities to shorten the overall duration of the
project. - ANS What is crashing a project?
D



When you divide the earned manhours by the actual manhours, you get this - ANS What is
the SPI (Schedule Performance Index)?

The method used to measure work progress when the level of effort varies per phase? - ANS
Incremental Milestone

One of the basic standards that describes the performance requirements of the project's
components. - ANS What are the Specifications?

20% of the input accounts for 80% of the output. - ANS What is the Pareto Principle?

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DocLaura Galen College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
143
Member since
2 year
Number of followers
38
Documents
6487
Last sold
17 hours ago

4.2

43 reviews

5
26
4
4
3
10
2
2
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions