100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CMGT 3500 Final exam Questions And Answers Graded A+!!!

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
16-10-2025
Written in
2025/2026

Expenditures for new construction are highest when the economy is _____ and when the economy is _____, a greater percentage of expenditures are devoted to renovation and remodeling. - ANS Strong; Weak T/F: The construction industry accounts for nearly 5% of the GDP. - ANS True Prices in the industry tend to rise as competition is _________. - ANS Decreased How does the construction industry differ from typical manufacturing? - ANS Construction is characterized by custom-built projects while typical manufacturing is based on mass production of products Which of the following is NOT a reason entry into the construction industry is easy? - ANS Employees are considered less valuable than the equipment and materials T/F: The cyclical nature of construction work also means that construction workers do not usually face limited employment opportunities during certain time periods, keeping the unemployment rate within the industry low in comparison to industrial workers. - ANS False Which of the following is considered the most important resource and is often responsible for the greatest fluctuations in total anticipated costs? - ANS Labor Statistics on the number of __________ placed under construction in a stated period of time (generally one month), are often used to indicate how well the industry is responding to the economy. - ANS New homes Which of the four broad categories of construction would a church fall under? - ANS Nonresidential building construction What is the term for when a company is formed just to construct a single project? - ANS Joint venture In a construction project, which party determines when a particular project is needed? - ANS Owner T/F: Once the decision is made to have a project built, it is not necessary to obtain designer services. - ANS False Which method consists of a contract drawn up between the owner and a general contractor? - ANS General In the general contract method, after the owner enters into contracts with the designer and constructor, which of the following comes next? - ANS A public advertisement is made which advises all interested parties of the particulars of the project and the upcoming bid date In which method does the owner take charge of the management of the project, assuming the managerial functions ordinarily performed by the general contractor? - ANS Separate If the owner possesses the necessary abilities to MANAGE a construction project, which method would you suggest to them? - ANS Separate Which of the following is true under the force account method? - ANS The owner decides to do some of the construction work or essentially do the work in-house, and their own workers or employees are solely assigned the task of performing the construction work What is the difference between the general contract method and the design-build method? - ANS In the general method, the designer role and contractor role are two separate entities, whereas in the design-build method, the contractor is also responsible for the design of the project. In the professional construction management method, when is value engineering considered most cost-effective? - ANS During the design phase The CM at risk firm is responsible for all of the following EXCEPT: - ANS Pay for all of the materials used in the project When a dispute arises with a contract, in order for it to be quickly resolved, the language must be _________. - ANS Clear T/F: Most construction contracts are express contracts - ANS True When a party has not complied with the terms of a contract, they have _________ the contract. - ANS Breached A contract is ________ when both parties to the agreement have fully performed in accordance with the contract's terms, and __________ when some portion of the agreement remains to be done. - ANS Executed; Executory What is the difference between an express contract and an implied contract? - ANS Express contracts have clear and concise terms of agreement that are usually established verbally or written down and implied contracts have terms of the agreement that are not clearly stated but are established through inference and deduction. A _________ arrangement is where individuals are "joined," in a legal and liability sense, as one party in the action. - ANS Joint In a __________ arrangement, each party in a contract is considered separate and each party has a liability separate from that of any other parties. - ANS Several If a contractor promises to perform the construction work as specified, and the owner promises to pay a stated amount for this work, what type of agreement is this? - ANS Bilateral T/F: A construction contract is still executory if the owner has not paid for the work. - ANS True Which of the following is NOT one of the criteria a contract has to meet to be considered valid? - ANS Time specified A ___________________ is a right created by law that permits workers and material suppliers who provide improvements to real property, to place a claim on that land if they are not paid. - ANS Mechanic's Lien Which court case tested the government's denial of land use for a particular purpose constitute public seizure of property? - ANS State of Washington v. Lake Lawrence Public Lands Protection Association Although the practice of eminent domain may seem harsh to the individual landowner, the purpose of this governmental power is to benefit _________. - ANS The Public What is the purpose of an easement? - ANS To grant specific right of use to nonowners of particular property by stating limited and specific use can be made of said property

Show more Read less
Institution
CMGT
Course
CMGT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CMGT
Course
CMGT

Document information

Uploaded on
October 16, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CMGT 3500 Final exam Questions And
Answers Graded A+!!!




A
R
U
LA
C
O
D

, Expenditures for new construction are highest when the economy is _____ and when the
economy is _____, a greater percentage of expenditures are devoted to renovation and
remodeling. - ANS Strong; Weak




A
T/F: The construction industry accounts for nearly 5% of the GDP. - ANS True




R
Prices in the industry tend to rise as competition is _________. - ANS Decreased

How does the construction industry differ from typical manufacturing? - ANS Construction
is characterized by custom-built projects while typical manufacturing is based on mass



U
production of products

Which of the following is NOT a reason entry into the construction industry is easy? - ANS
LA
Employees are considered less valuable than the equipment and materials

T/F: The cyclical nature of construction work also means that construction workers do not
usually face limited employment opportunities during certain time periods, keeping the
unemployment rate within the industry low in comparison to industrial workers. - ANS False
C

Which of the following is considered the most important resource and is often responsible for
the greatest fluctuations in total anticipated costs? - ANS Labor

Statistics on the number of __________ placed under construction in a stated period of time
O


(generally one month), are often used to indicate how well the industry is responding to the
economy. - ANS New homes
D



Which of the four broad categories of construction would a church fall under? - ANS
Nonresidential building construction

What is the term for when a company is formed just to construct a single project? - ANS
Joint venture

In a construction project, which party determines when a particular project is needed? - ANS
Owner

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DocLaura Galen College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
143
Member since
2 year
Number of followers
38
Documents
6487
Last sold
15 hours ago

4.2

43 reviews

5
26
4
4
3
10
2
2
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions