Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

CCM CERTIFICATION EXAM WITH ALL CORRECT & 100% VERIFIED ANSWERS|ACTUAL COMPLETE EXAM| ALREADY GRADED A+

Document preview thumbnail
Preview 2 out of 12 pages

CCM CERTIFICATION EXAM WITH ALL CORRECT & 100% VERIFIED ANSWERS|ACTUAL COMPLETE EXAM| ALREADY GRADED A+

Content preview

CCM CERTIFICATION EXAM WITH ALL CORRECT & 100%
VERIFIED ANSWERS|ACTUAL COMPLETE EXAM|
ALREADY GRADED A+

Construction Management Functions ✔Correct Answer-1.Project Delivery Methods
2. Project Management
3. Cost Management
4. Time Management
5. Quality Management
6. Contract Administration
7. Safety Management
8. Program Management
9. Sustainability
10. Risk Management
11. Building Information Modeling

Construction Management Phases ✔Correct Answer-- Pre-design
• Design
• Procurement
• Construction
• Post-construction

Project Delivery Method ✔Correct Answer-is a contracting strategy used by an agency or owner for
organizing the design, construction, operations, and maintenance services for a construction project
from conception to occupancy by entering into legal agreements with one or more entities or
parties.

Basic Delivery Forms ✔Correct Answer-1. Traditional Approach or Design-Bid-Build (D-B-B)
2. Multiple-Prime Contracting (Multi-Prime)
3. Construction Management-at-Risk (CM-at-Risk)
4. Design-Build (D-B)
5. Integrated Project Delivery (IPD)

Traditional Approach or Design-Bid-Build (D-B-B) ✔Correct Answer-Most common delivery
method. The parties involved in the traditional delivery system include the owner, the designer, and
one or more contractors with subcontractors. Executes major phases of project in linear sequence.
General contractor usually selected in low bid process.

CM at Risk ✔Correct Answer-Acts as owner's agent and provides professional services early in the
project. CM role expands to general contractor after design phase then CM hires sub contractors.

Design Build (D-B) ✔Correct Answer-Grown in popularity. For the owner, the primary benefit is the
simplicity of having one party responsible for both the development of the design and the execution
of the construction for the project.

Multiple Prime Contracting ✔Correct Answer-The owner holds separate contracts with contractors
of various disciplines, such as general construction, structural, mechanical, and electrical. CM
administers contracts and manages budget an schedule.

, IPD Contracts(Integrated Project Delivery) ✔Correct Answer-A relatively new entry into the U.S.
marketplace and very few projects have been carried out using these contracts. Requires
collaboration and a multiparty agreement among the primary parties—owner, designer, CM, and
builder—so that the risk, responsibility and liability for project delivery are collectively managed and
appropriately shared.

Construction Management ✔Correct Answer-A management approach that focuses on the
delivery of professional services.

Construction Management Standards of Practice ✔Correct Answer-Intended to establish industry
standards of service and to serve as a guide to the range of services that constitute professional
construction management.

Project Management ✔Correct Answer-as defined by CMAA, is the use of integrated systems and
procedures by a team of professionals during project design and construction.

Project Management Plan ✔Correct Answer-typically establishes the scope, budget, schedule,
environmental conditions, and the basic systems to be utilized.

Project Management Plan Components ✔Correct Answer-Project description • Scope of work •
Milestone schedule • Master schedule • Quality management approach • Safety management plan •
Reference to project documents • Project organization chart and staffing plan • Explanation of roles,
responsibilities, and authority of team members • Project budget/work breakdown structure •
Sustainability plan • Logistics including temporary construction support requirements, i.e. laydown
or marshalling area • Environmental/archeological considerations • Reference to project procedures
manual • Management information system • Communications protocol • Bid packaging, contracting
strategy, and delivery system evaluation • Site mobilization and utilization phase • BIM
implementation strategy

Pre Design Phase ✔Correct Answer-the owner must assemble and organize a project team
composed of design and construction management professionals as well as other key professional,
technical and administrative staff necessary to assure the success of the project.

Project Procedures Manual ✔Correct Answer-It clearly define the team responsibilities, levels of
authority, communication protocol, and the systems, methods, and procedures for project execution.

Design Phase ✔Correct Answer-As the process proceeds from schematic through final design, the
team must consider the issues critical to each particular phase, moving from general decisions in the
early phase to detailed decisions as design progresses.

5 C's ✔Correct Answer-1. Clarity
2. Completeness
3. Constructibility
4. Compliance (with owner's program)
5. Coordination (among the trades and contractors as appropriate).

Procurement Phase ✔Correct Answer-goal in this phase is to secure bidders for each bid package
(or subcontractor trade) who are qualified, competitive, interested in the work, and capable of doing
the work within the project time requirements.

Document information

Uploaded on
October 14, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
60
Followers
1
Items
12284
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions