A manual fire alarm system.
IBC 907.2.7, pg 218-correct-answer-Consider a Group M occupancy with an
occupant load of 4000 with a total of 2 floors. What are the fire alarm initiation
requirements for this occupancy?
A manual
IBC 907.29.1, pg 219-correct-answer-Consider a Group R-2 occupancy containing
17 sleeping units. This occupancy requires __________ fire alarm system?
B
IBC 907.2.2.1, pg 216-correct-answer-Consider an ambulatory care facility. This
type of occupancy is considered to be a Group _____.
An automatic smoke detection system shall be installed in corridors and spaces
permitted to be open to corridors. IBC 907.2.6.2, pg 217-correct-answer-Consider
a Group I-2 nursing home occupancy. Smoke detectors are not provided in
, 2|Page
individual sleeping units. Automatic door closing devices with integral smoke
detections are not provided for individual sleeping units. What are the fire alarm
initiation requirements for this occupancy?
A Manual fire alarm system. automatic smoke detection is corridors, smoke alarms
in sleeping units.
IBC 907.2.8.1-3, pg 218-219-correct-answer-Consider a Group R-1 occupancy
which is 3 stories and all sleeping units open up to interior corridors . The building
does not have an automatic sprinkler system. What are the fire alarm initiation
requirements?
Functional test per manufacture's instructions.-correct-answer-Which of the
following tests are required for smoke alarms in one-and two- family dwellings?
Elevate their feet-correct-answer-How do you treat someone who has fainted?
Heat exhaustion-correct-answer-Dilated pupils are a symptom of:
When direct pressure has failed.-correct-answer-According to the Nicet test, when