AATC Exam 3 - PM Comprehensive
with questions with detailed answers
Technical
Programmatic
Business - ANS ✔✔3x Major Areas of Risk in an Acquisition Program
Technical Performance Measures (TPM) - ANS ✔✔Tech compares planned or estimated values
of designated performance parameters w/ achieved values as the parameter moves toward a
goal
Cost
Schedule
Performance - ANS ✔✔3x Risk Consequence Categories used during MSA phase to analyze tech
approaches
Operationally Suitable - ANS ✔✔Technical performance measure's actual results are trending
below the lower tolerance. This can prevent a system from being __________ _________
Technical Performance Measures (TPMs) - ANS ✔✔_____ are used to assess the technical risk
rate
Cost Fund Status Report (CFSR) - ANS ✔✔____ report is used to report a snapshot of
contracting funding, expenditures, billings, and termination liability which relates EVM
information to funding information.
BCWP - ACWP
, (Budgeted Cost - Actual Cost) - ANS ✔✔Equation used to determine cost variance.
Minimize Waste
Responsiveness to Change - ANS ✔✔2x Principles of Lean Manufacturing
Over Budget
Behind Schedule - ANS ✔✔Contract has negative cost and schedule variances. They are ______
budget and ______ schedule.
Cost Variance (CV) is positive
Schedule Variance (SV) is negative
CPI: 1.03
SPI: .98 - ANS ✔✔Cost & schedule status is:
Under budget
Behind Schedule
Inefficient on Cost (Positive CPI)
Inefficient on Schedule (Negative SPI)
Lean Manufacturing
Stability in Manufacturing Process
Reduction of Variability in Production - ANS ✔✔3x Methods to Control Manufacturing Costs
Single Process Initiative - ANS ✔✔Corporation has the ability to perform multi-functional
related work within the same production cell. One process is used for both commercial and
defense customers.
with questions with detailed answers
Technical
Programmatic
Business - ANS ✔✔3x Major Areas of Risk in an Acquisition Program
Technical Performance Measures (TPM) - ANS ✔✔Tech compares planned or estimated values
of designated performance parameters w/ achieved values as the parameter moves toward a
goal
Cost
Schedule
Performance - ANS ✔✔3x Risk Consequence Categories used during MSA phase to analyze tech
approaches
Operationally Suitable - ANS ✔✔Technical performance measure's actual results are trending
below the lower tolerance. This can prevent a system from being __________ _________
Technical Performance Measures (TPMs) - ANS ✔✔_____ are used to assess the technical risk
rate
Cost Fund Status Report (CFSR) - ANS ✔✔____ report is used to report a snapshot of
contracting funding, expenditures, billings, and termination liability which relates EVM
information to funding information.
BCWP - ACWP
, (Budgeted Cost - Actual Cost) - ANS ✔✔Equation used to determine cost variance.
Minimize Waste
Responsiveness to Change - ANS ✔✔2x Principles of Lean Manufacturing
Over Budget
Behind Schedule - ANS ✔✔Contract has negative cost and schedule variances. They are ______
budget and ______ schedule.
Cost Variance (CV) is positive
Schedule Variance (SV) is negative
CPI: 1.03
SPI: .98 - ANS ✔✔Cost & schedule status is:
Under budget
Behind Schedule
Inefficient on Cost (Positive CPI)
Inefficient on Schedule (Negative SPI)
Lean Manufacturing
Stability in Manufacturing Process
Reduction of Variability in Production - ANS ✔✔3x Methods to Control Manufacturing Costs
Single Process Initiative - ANS ✔✔Corporation has the ability to perform multi-functional
related work within the same production cell. One process is used for both commercial and
defense customers.