100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CTQP FINAL ESTIMATES LEVEL 1 QUESTIONS & ANSWERS

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
09-10-2025
Written in
2025/2026

1) A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - ANSWERTrue For the DOT, the management of Construction and reconstruction projects involves the following specific responsibilities: A. Planning, Programming and design B. Contract administration C. Contractor payments D. Design and Contract Management E. All of the above - ANSWERE. All of the above

Show more Read less
Institution
CTQP
Course
CTQP









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CTQP
Course
CTQP

Document information

Uploaded on
October 9, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • ctqp

Content preview

CTQP FINAL ESTIMATES LEVEL 1
QUESTIONS & ANSWERS
1) A major function of the DOT is to carry out Construction and Reconstruction
programs to provide the public with adequate transportation service. - ANSWERTrue

For the DOT, the management of Construction and reconstruction projects involves the
following specific responsibilities:
A. Planning, Programming and design
B. Contract administration
C. Contractor payments
D. Design and Contract Management
E. All of the above - ANSWERE. All of the above

3) To pay for the work performed by Contractors, progress and Final Estimates are
needed. True or False? - ANSWERTrue

DESIGN STANDARDS - ANSWERThese standards are made available for Design,
Construction, Maintenance, and Utility operations on the State Highway System. This
booklet provides guidelines and technical drawings for design and Construction
personnel.

Multiple choice. Please match the appropriate documentation name with the correct
description below:
A. [Final Plans]: For reviewing contract time charges before clearing estimates for final
payment; [Computation Books]: Documents pertinent changes during construction and
show the "as-built' condition; [Field Books]: Contains alignment notes and cross section
notes, etc.
B. [Construction Diaries]: For reviewing contract time charges before clearing estimates
for final payment; [Final Plans]: Documents pertinent changes during construction and
show the "as-built' conditions; [Field Books]: Contains alignment notes and cross
section notes, etc.
C. [Final Plans]: For reviewing contract time charges before clearing estimates for final
payment; [Tabulation Forms]: Documents pertinent changes during construction and
show the "as-built' conditions; [Field Books]: Contains alignment notes and cross
section notes, etc.
D. [Fi - ANSWERB. [Construction Diaries]: For reviewing contract time charges before
clearing estimates for final payment; [Final Plans]: Documents pertinent changes during
construction and show the "as-built' conditions; [Field Books]: Contains alignment notes
and cross section notes, etc.

When using calculators or computers, you should use the:
A. Rules of rounding described in CONSTRUCTION MATH.
B. Full decimal capabilities of the machine

, C. CPAM as a guide to rounding
D. Machine only as a backup to your manual computations
E. None of the above - ANSWERB. Full decimal capabilities of the machine

True or False. It is usually necessary to measure items which are to be paid for on a
Lump Sum or Plan Quantity basis. - ANSWERFalse

True or False. To measure and pay for the work performed by Contractors, Progress
and Final Estimates are needed. - ANSWERTrue

True or False. Special provisions are contract documents that may describe Some
situation unique to a particular project or modify a Requirement set forth in the
Specifications. - ANSWERTrue

True or False. Progress payments are made to contractors on the basis of monthly
progress estimates. - ANSWERTrue

Which of the following are NOT types of final estimates documentation?
A. Truck Tabulation Forms and Computer Input
B. Final plans
C. Computation Book Forms
D. Unit Pricing and Estimates Procedure Manual
E. None of the above - ANSWERD. Unit Pricing and Esimates Procedure Manual

What identification is missing from the front cover and the spine of the field notebook
shown below
A. Front Cover: Notebook number, Financial
1. Project ID NO., and the description of the contents
2. Spine: Fed Aid Aid No.

B. Font Cover: Notebook Number, Financial
1. Project ID No. and the description of Contents
2. Spine: Contract No.

C. Front Cover: Notebook Number, Financial
1. Project ID No. and description of contents
2. Spine: Notebook Number

D. Front Cover: Notebook Number, Financial
1. Project ID No. and the description of contents
2. Spine: Financial Project ID No.

E. None of the above - ANSWERC. Front Cover: Notebook Number, Financial
1. Project ID No. and description of contents
2. Spine: Notebook Number

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
600
Member since
2 year
Number of followers
368
Documents
17729
Last sold
2 days ago
GOLD PREMIUM

HELLO? welcome to my store thanks for visiting this page here you are guaranteed of well revised and assured EXAMS ALL GRADED A+ thus making your education journey easy and seamless . DO NOT HESITATE TO CONTACT ME IF YOU ARE IN NEED OF ANY EXAM .I AM READY 24/7 TO ASSIST YOU ALSO REFER YOUR FRIENDS.

4.1

114 reviews

5
69
4
10
3
21
2
2
1
12

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions