100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MGMT 339 CHAPTER 7 PROJECT MANAGEMENT EXAM AND ACTUAL ANSWERS.

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
07-10-2025
Written in
2025/2026

Project - Answer an Interrelated set of activities with a definite starting and ending point, which results in a unique outcome for a specific allocation of resources. Project Management - Answer A systemized, phased approach to defining, organizing, planning, monitoring and controlling projects. Program - Answer An interdependent set of projects that have a common strategic purpose. work breakdown structure (WBS) - Answer A statement of all work that has to be completed. activity - Answer The smallest unit of work effort consuming both time and resources that the project manager can schedule and control. network diagram - Answer A network planning method, designed to depict the relationships between activities, that consist of nodes (circles) and arcs (arrows). program evaluation and review technique (PERT) - Answer A network planning method created for the U.S. Navy's Polaris missile project in the 1950's, which involved 3,000 separate contractors and suppliers. Critical Path Method (CPM) - Answer A network planning method developed in the 1950's as a means of scheduling maintenance shutdowns at chemical-processing plants. precedence relationship - Answer A relationship that determines a sequence for undertaking activities; it specifies that one activity cannot start until a preceding activity has been completed. Path - Answer The sequence of activities between a projects start and finish. Critical Path - Answer The sequence of activities between projects start and finish that takes the longest time to complete. earliest finish time (EF) - Answer An activitys earliest stat time plus its estimated duration, t, or EF = ES + t.

Show more Read less








Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
October 7, 2025
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

MGMT 339 CHAPTER 7 PROJECT
MANAGEMENT EXAM AND ACTUAL
ANSWERS.
Project - Answer an Interrelated set of activities with a definite starting and ending point,
which results in a unique outcome for a specific allocation of resources.



Project Management - Answer A systemized, phased approach to defining, organizing,
planning, monitoring and controlling projects.



Program - Answer An interdependent set of projects that have a common strategic purpose.



work breakdown structure (WBS) - Answer A statement of all work that has to be completed.



activity - Answer The smallest unit of work effort consuming both time and resources that the
project manager can schedule and control.



network diagram - Answer A network planning method, designed to depict the relationships
between activities, that consist of nodes (circles) and arcs (arrows).



program evaluation and review technique (PERT) - Answer A network planning method
created for the U.S. Navy's Polaris missile project in the 1950's, which involved 3,000 separate
contractors and suppliers.



Critical Path Method (CPM) - Answer A network planning method developed in the 1950's as a
means of scheduling maintenance shutdowns at chemical-processing plants.



precedence relationship - Answer A relationship that determines a sequence for undertaking
activities; it specifies that one activity cannot start until a preceding activity has been
completed.



Path - Answer The sequence of activities between a projects start and finish.




Critical Path - Answer The sequence of activities between projects start and finish that takes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9 Webster University
View profile
Follow You need to be logged in order to follow users or courses
Sold
756
Member since
2 year
Number of followers
125
Documents
24874
Last sold
1 day ago
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

133 reviews

5
60
4
19
3
22
2
9
1
23

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions