When does lightning present the greatest hazard to the
crane and rigging personnel? - ANSWER-When thunder
and lightening are apparent
What force would be required to move in object up an in-
dined plan compared to lifting it vertically? - ANSWER-1
1/2 times more
Personnel platforms shall NOT be used to lift: - ANSWER-
Tools and materials without employees
All of the following are reasons for stopping personnel
lifting and operations EXCEPT: - ANSWER-There are no
TAG LINES
When working on close quarters, the main concern is: -
ANSWER-SAFETY
The point of any object's weight can be concentrated at: -
ANSWER-Center of gravity
, 2|Page
In a spur-gear chain hoist with a two chain system, the
endless chain is used to: - ANSWER-Raise and lower the
load
In an emergency situation, what is the rigger's FIRST
priority? - ANSWER-To prevent injury or loss of life
All of the following conditions exert dynamic loading on a
crane EXCEPT: - ANSWER-Static boom angle
Proper lead sheave placement as it relates to the hoisting
drum location is: - ANSWER-Proper spooling of wire rope
The most important information to consider when planning
a lift is: - ANSWER-Weight of the load
Prior to use, all new, altered, modified, or repaired rigging
hardware shall be inspected by whom? - ANSWER-A
designated person
An unsafe condition that riggers should be aware of when
dealing with a multi part load block is: - ANSWER-Twisting
multi part lines