10/5/25, 10:55 AM ICC California UST Service Technician Flashcards | Quizlet
Science Engineering Chemical Engineering
ICC California UST Service Technician
7 studiers in 3 days 3.0 (3 reviews)
Save
Students also studied
Flashcard sets Study guides Practice tests
Voc words Sept 8th Study Guide Chapter 1-4 SI Prefixes: Giga, Mega, Kilo, and M... Regula
Teacher 8 terms 18 terms 16 terms 18 terms
mowen186 Preview anselmoluna06 Preview marychidgey29 Preview san
Terms in this set (278)
UDC was required at time of installation for January 1, 2000
all systems installed after?
July 1, 2005, service techs shall possess or ICC UST Service Technician Exam
work under someone who has a current
certification indicating he or she has
passed the?
ICC cert must be renewed every? 24 months
Service techs must possess or be The individual has a tank testing license
employed by a person who has the
appropriate contractor's license unless?
Service tech is defined by any individual Tests UST monitoring equipment, trouble shoots UST systems, and/or installs UST
who? monitoring equipment.
If the manufacturer training no longer exist, Approve comparable alternate training .
the local agency may?
UST includes? Tank and connected piping
What is considered a UST? A petroleum underground storage tank.
What UST system meets the requirements Doubled wall tanks
for secondary containment?
According to title 23; the following piping Pressured product piping
components if installed after July 1, 1987
must have secondary containment.
What is considered "pipe" on tanks installed Pressured product piping and below ground vapor recovery.
after July 1, 2003?
https://quizlet.com/681344061/icc-california-ust-service-technician-flash-cards/ 1/7
, 10/5/25, 10:55 AM ICC California UST Service Technician Flashcards | Quizlet
Under dispenser containment (UDC) was December 31, 2003
required for all existing UST systems by
What system is for exchanging gas vapors Stage 1 vapor recovery
in a storage tank and product in a fuel
delivery truck
Which approved method for non-visual Statistical Inventory Reconciliation (SIR)
monitoring for existing UST systems.
ATG must be capable for detecting a 0.2 gallons per hour
release of?
What is no longer an approved method for Manual inventory reconciliation.
non-visual monitoring on existing UST
systems?
Automatic line leak detectors installed on 3 gallons per hour at 10 psi
underground piping with secondary
containment shall be capable of detecting
a leak of ?
How often should ATG be programmed to At least monthly
test the tank?
According to PEI RP 300, a combustible Detect vapor leaks in a vapor recovery system.
gas can be used to?
According to PEI RP 300, a written scope Construction plans
of work for vapor recovery installation
should include?
Positive shut off overfill protection device 95% full
must stop the flow of fuel when the tank is
no more then?
According to Executive Order (EO) VR 201- Depended filter seal damage
A , what could cause a nozzle shut off
mechanism or malfunction?
According to VR 201-A, breakaway Logged in GDF log
reconnection must be?
According to PEI RP 300 what is an Sketching a diagram on the inside cover of vapor recovery equipment manual
INCORRECT method of documenting
piping location?
According to PEI RP 300 as built drawing maintained as long as UST is in service.
or pictures of the underground pipping
and other components shall be_________.
According to EO VR 101-E maintenance Name and Designated UST Operator.
records are required to include what?
The Phil-Tite EVR Phase 1 system require Used with no more than 3 p/v valves
that vapor vent pipes at any UST system be
According to EO VR 2010 after installing a Nozzle dispensing shut off test
new spout assembly in the Healy 900
nozzle the following test must be
conducted?
According to Healy EO VR 201-A a vapor Gasoline dispensing facility operator(GDF)
recovery record is to be maintained by?
https://quizlet.com/681344061/icc-california-ust-service-technician-flash-cards/ 2/7
Science Engineering Chemical Engineering
ICC California UST Service Technician
7 studiers in 3 days 3.0 (3 reviews)
Save
Students also studied
Flashcard sets Study guides Practice tests
Voc words Sept 8th Study Guide Chapter 1-4 SI Prefixes: Giga, Mega, Kilo, and M... Regula
Teacher 8 terms 18 terms 16 terms 18 terms
mowen186 Preview anselmoluna06 Preview marychidgey29 Preview san
Terms in this set (278)
UDC was required at time of installation for January 1, 2000
all systems installed after?
July 1, 2005, service techs shall possess or ICC UST Service Technician Exam
work under someone who has a current
certification indicating he or she has
passed the?
ICC cert must be renewed every? 24 months
Service techs must possess or be The individual has a tank testing license
employed by a person who has the
appropriate contractor's license unless?
Service tech is defined by any individual Tests UST monitoring equipment, trouble shoots UST systems, and/or installs UST
who? monitoring equipment.
If the manufacturer training no longer exist, Approve comparable alternate training .
the local agency may?
UST includes? Tank and connected piping
What is considered a UST? A petroleum underground storage tank.
What UST system meets the requirements Doubled wall tanks
for secondary containment?
According to title 23; the following piping Pressured product piping
components if installed after July 1, 1987
must have secondary containment.
What is considered "pipe" on tanks installed Pressured product piping and below ground vapor recovery.
after July 1, 2003?
https://quizlet.com/681344061/icc-california-ust-service-technician-flash-cards/ 1/7
, 10/5/25, 10:55 AM ICC California UST Service Technician Flashcards | Quizlet
Under dispenser containment (UDC) was December 31, 2003
required for all existing UST systems by
What system is for exchanging gas vapors Stage 1 vapor recovery
in a storage tank and product in a fuel
delivery truck
Which approved method for non-visual Statistical Inventory Reconciliation (SIR)
monitoring for existing UST systems.
ATG must be capable for detecting a 0.2 gallons per hour
release of?
What is no longer an approved method for Manual inventory reconciliation.
non-visual monitoring on existing UST
systems?
Automatic line leak detectors installed on 3 gallons per hour at 10 psi
underground piping with secondary
containment shall be capable of detecting
a leak of ?
How often should ATG be programmed to At least monthly
test the tank?
According to PEI RP 300, a combustible Detect vapor leaks in a vapor recovery system.
gas can be used to?
According to PEI RP 300, a written scope Construction plans
of work for vapor recovery installation
should include?
Positive shut off overfill protection device 95% full
must stop the flow of fuel when the tank is
no more then?
According to Executive Order (EO) VR 201- Depended filter seal damage
A , what could cause a nozzle shut off
mechanism or malfunction?
According to VR 201-A, breakaway Logged in GDF log
reconnection must be?
According to PEI RP 300 what is an Sketching a diagram on the inside cover of vapor recovery equipment manual
INCORRECT method of documenting
piping location?
According to PEI RP 300 as built drawing maintained as long as UST is in service.
or pictures of the underground pipping
and other components shall be_________.
According to EO VR 101-E maintenance Name and Designated UST Operator.
records are required to include what?
The Phil-Tite EVR Phase 1 system require Used with no more than 3 p/v valves
that vapor vent pipes at any UST system be
According to EO VR 2010 after installing a Nozzle dispensing shut off test
new spout assembly in the Healy 900
nozzle the following test must be
conducted?
According to Healy EO VR 201-A a vapor Gasoline dispensing facility operator(GDF)
recovery record is to be maintained by?
https://quizlet.com/681344061/icc-california-ust-service-technician-flash-cards/ 2/7