Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CM250 EXAM 2 QUESTIONS & COMPLETE SOLUTIONS

Document preview thumbnail
Preview 2 out of 8 pages

CM250 EXAM 2 QUESTIONS & COMPLETE SOLUTIONS is a study set on Quizlet that helps learners prepare for the U.S. Army Corps of Engineers (USACE) and Naval Facilities Engineering Systems Command (NAVFAC) required training course and certification exam.

Content preview

CM250 EXAM 2 QUESTIONS &
COMPLETE SOLUTIONS

Within the federal CQM (construction quality management) program, who has the responsibility
for quality control? - correct answer ✔✔Builder



To determine the fleet size (number of haulers) for the project, one of two deterministic models
are used. What are the two models? - correct answer ✔✔rational and queues



The CQM process provides full documentation of the materials incorporated into the work,
work performed, and tests results of work in place. - correct answer ✔✔True



Which party in the traditional construction process has primary responsibility for quality
control? - correct answer ✔✔?



Quality assurance focuses on - correct answer ✔✔Providing confidence that specific quality
requirements can and will be satisfied



Quality control focuses on ______. - correct answer ✔✔Meeting the specific quality
requirements required in the contract documents



What is the required level tolerance specified by most manufactures for setting a crane? -
correct answer ✔✔1%



You are setting a rooftop air handler. The top of the roof parapet is 60-ft above the finish grade
that the crane is sitting on. The rigging from the end of the boom is 5 ft from the end of the
boom and includes the hook. The air handler and the slings to lift it are 10 ft. high. The
minimum distance from the building that you can set the crane is 45 ft. The air handler is to be

, set 40 ft from the edge of the roof. What minimum (calculated) length of boom will you need,
and how far from the building will you set the crane? - correct answer ✔✔142 ft and 60 ft ?



If the projected lift exceeds 75% of the crane's rated capacity, or if there are multiple cranes
used for a lift, it is considered a "critical lift". - correct answer ✔✔True



What is the average time to erect and dismantle a 165 ft tower crane? - correct answer ✔✔21
days



In selecting a crane, you need to consider the weight of the load (crane attachments, wire rope,
slings, and block), maximum radius of swing to lift the load, and the combined height of the
load, slings, block, and vertical lift. - correct answer ✔✔True



If you are willing to accept no more than a 20% chance of exceeding the design capacity of the
drainage culvert for your project, what rainfall intensity factor would... (incomplete, graph
question) - correct answer ✔✔1.18



Key principles to erosion control include _________. (Select all that apply) - correct answer
✔✔Minimize disturbed area and protect natural features and soil



Control of stormwater flowing onto and through the project site



Protection of slopes



When must the application (notice of intent) be made for obtaining permit coverage for the
construction site? - correct answer ✔✔No later than 14 days prior to the start of construction ?



What federal regulation governs the development of SWPPP? - correct answer ✔✔NPDES

Document information

Uploaded on
September 30, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVIA2024
3.5
(4)
Sold
24
Followers
0
Items
7416
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions