Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Virginia Erosion and Sediment Control Inspector Exam Questions With Verified Answers

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
29-09-2025
Written in
2025/2026

Virginia Erosion and Sediment Control Inspector Exam Questions With Verified Answers .4 factors influencing erosion - Answer-climate groundcover (influenced by humans) soil properties topography (influenced by humans) .county use bonds - Answer-returned within 60 days of adequate stabilization can't be more than 25% of estimated cost to cover expenses should the applicant fail conservation action .Describe MS-19 after July 1, 2014 - Answer-Requires management of post-development SW runoff if not under SW program -If SW into a natural channel, then achieve energy balance -If into a manmade channel, EB or max 2-yr storm discharge -If into restored channel, EB or peak discharge is designed parameters .Erosion Impact Area - Answer-area of land NOT ASSOCIATED with a current land- disturbing activity but contributing to sedimentation .How are you eligible to take the exam? - Answer-Take a DEQ training class OR DEQ 800 hour work experience form .How is a slope percentage calculated? - Answer-rise/run horizontal distance / vertical distance closer number to 1 in a ratio= higher percentage=steeper slope .How is a stop-work order issued? (3 scenarios) - Answer-1. NOC measures are not done by deadline, then issue SWO on all or part. 7 days, or sooner if corrected. 2. no plan/permits, mail and post on site 3. emergency- no NOC required. .How many days to remove temporary controls after final site stabilization? (MS-18) - Answer-30 days .How many ft of utility can be open at a time? (MS-16) - Answer-500 linear ft of a utility trench .How much extra mesh is required at an inlet? - Answer-12 inches .How much more soil loss occurs from construction sites versus natural soil erosion rates? Agricultural land? - Answer-1000 times more than the average natural soil erosion rate. 20 times more than agricultural land. .If dormant for more than 14 days, how many days to seed? - Answer-7 days for temp vegetation (permanent vegetation if dormant for 1 year)

Show more Read less
Institution
Virginia Erosion And Sediment Control Inspector Ex
Course
Virginia Erosion and Sediment Control Inspector Ex

Content preview

Virginia Erosion and Sediment Control
Inspector Exam Questions With
Verified Answers



\.4 factors influencing erosion - Answer- climate

groundcover (influenced by humans)

soil properties

topography (influenced by humans)



\.county use bonds - Answer- returned within 60 days of adequate stabilization



can't be more than 25% of estimated cost



to cover expenses should the applicant fail conservation action



\.Describe MS-19 after July 1, 2014 - Answer- Requires management of post-development
SW runoff if not under SW program

-If SW into a natural channel, then achieve energy balance

-If into a manmade channel, EB or max 2-yr storm discharge

-If into restored channel, EB or peak discharge is designed parameters



\.Erosion Impact Area - Answer- area of land NOT ASSOCIATED with a current land- disturbing
activity but contributing to sedimentation

, \.How are you eligible to take the exam? - Answer- Take a DEQ training class OR DEQ 800
hour work experience form



\.How is a slope percentage calculated? - Answer- rise/run

horizontal distance / vertical distance



closer number to 1 in a ratio= higher percentage=steeper slope



\.How is a stop-work order issued? (3 scenarios) - Answer- 1. NOC measures are not done by
deadline, then issue SWO on all or part. 7 days, or sooner if corrected.

2. no plan/permits, mail and post on site

3. emergency- no NOC required.



\.How many days to remove temporary controls after final site stabilization? (MS-18) - Answer-
30 days



\.How many ft of utility can be open at a time? (MS-16) - Answer- 500 linear ft of a utility
trench



\.How much extra mesh is required at an inlet? - Answer- 12 inches



\.How much more soil loss occurs from construction sites versus natural soil erosion rates?
Agricultural land? - Answer- 1000 times more than the average natural soil erosion rate.

20 times more than agricultural land.



\.If dormant for more than 14 days, how many days to seed? - Answer- 7 days for temp
vegetation (permanent vegetation if dormant for >1 year)

Written for

Institution
Virginia Erosion and Sediment Control Inspector Ex
Course
Virginia Erosion and Sediment Control Inspector Ex

Document information

Uploaded on
September 29, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IszackBd University Of Washington
View profile
Follow You need to be logged in order to follow users or courses
Sold
40
Member since
1 year
Number of followers
3
Documents
5705
Last sold
6 days ago
IszackBd Stuvia

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don\'t find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. FOR ANY REQUEST FEEL FREE TO REACH US

Read more Read less
5.0

3 reviews

5
3
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions