Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Air Assault Phase 1 2025 Comprehensive Questions And Verified Answers/ Complete Solutions With Rationales |Get It 100% Accurate!! Already Passed!!

Document preview thumbnail
Preview 2 out of 15 pages

Air Assault Phase 1 2025 Comprehensive Questions And Verified Answers/ Complete Solutions With Rationales |Get It 100% Accurate!! Already Passed!!

Content preview

1



Air Assault Phase 1 2025 Comprehensive
Questions And Verified Answers/
Complete Solutions With Rationales |Get
It 100% Accurate!! Already Passed!!
What is the allowable cargo load of the LUH-72A in its normal configuration when
used for MEDEVAC operations? - (ANSWER)2 litter, 1 medic, or 5 ambulatory.



ACL of LUH-72A for combat equipped troops - (ANSWER)8 pax



LUH-72A Cargo Hook Capacity - (ANSWER)3306 lbs



LUH-72A Max gross weight - (ANSWER)7903 lbs



LUH 72A max and cruise speed - (ANSWER)Max- 145 knots

Cruise- 130-133 knots



What is the primary use for the CH-47 when used during CASEVAC missions? -
(ANSWER)Mass Casualty Evacuation



Primary mission of the CH-47D/F - (ANSWER)Troop and cargo transport

, 2


What is the crew of a LUH- 72A when not being used for MEDEVAC operations? -
(ANSWER)(3) Pilot, Co-Pilot, Crew Chief



What is the total length (and total usable) of the high performance utility hoist? -
(ANSWER)256ft (250ft)



When used for CASEVAC operations, what is the (ACL) for the CH-47? -
(ANSWER)31 ambulatory or 24 litter.



If the obstacle on the approach route is eight meters tall and the obstacle on the
departure route is ten meters tall of your PZ/LZ, what is the unusable space for
the departure route? - (ANSWER)100m



What reference material covers LZ/PZ operations? - (ANSWER)FM 3-21.38



What are the dimensions of the reference lights that mark an additional
touchdown point for cargo aircraft? - (ANSWER)10m x 10m



What is the first step in HLZ setup (LZ/PZ operations)? - (ANSWER)Establish
control facilities (ground to air communications, observation of PZ/LZ,
observation of incoming AC)



What size landing point is required for a CH-47 with a long line sling load during
nighttime operations? - (ANSWER)Size 7

Document information

Uploaded on
September 27, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheAlphanurse
4.2
(382)
Sold
5786
Followers
179
Items
6684
Last sold
3 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions