Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CEPSCI PRACTICE TEST |ACCURATE QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
23-09-2025
Written in
2025/2026

CEPSCI PRACTICE TEST |ACCURATE QUESTIONS AND ANSWERS

Institution
CEPSCI
Course
CEPSCI

Content preview

CEPSCI PRACTICE TEST |ACCURATE QUESTIONS AND ANSWERS
1972 clean water act - -Administered by the US environmental protection agency (EPA)
Created the NPDES

-1987 - -Amendment to CWA CALLED WATER QUALITY ACT

-NPDES in south carolina - -South Carolina is NPDES delegated state.

-NPDES regulations are administered by - -SCDHEC

-CGP authorizes - -stormwater discharges from construction sites

-Who must obtain NPDES coverage - -land disturbing activities greater than or equal to 1
acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone

-NPDES permits are issued to - -operator-person or company for a particular discharge

-primary permittee - --has day to day operational control to ensure compliance with SWPP
-typically the owner or developer

-primary permittee responsibilites - -submit NOI, Preparation of the C_SWPPP

-Secondary permittee - -individual lot owner or residential builder that conducts land
disturbing activity limited to an individual lot or group of lots as part of approved LCP of
development

-contractors - -must on Contractor Certification- D-0437

-On-Site SWPPP - -SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor
Certifications, Local Approvals, USACE approvals, Critical area permit(coast)

-OS_SWPPP - -a copy of signed and certified SWPPP, NOI, and CGP coverage letter from
DHEC must be retained at site or electronically accessible

-minor modification to ON-SWPPP - -minor modifications made directly in the field,do not
need approval by DHEC- additional BMP's, removal of disturbed areas

-major modifications to OS-SWPPP - -must be made by qualified individual and submitted
to DHEC or appropriate delegated entity for approval

-Phased plan requirement > 5 - -include a phased stormwater management plan which
identifies all BMP's and grading work conducted during a specific portion of the sites
construction sequence. Each phase identified on at least one separate plan sheet.

, -Phased plan requirement < 10 but > 5 acres - -at least two separate plan phases are
required - initial land disturbance phase - stabilization phase

-Phased plan requirement ≥ 10 acres - -at least 3 separate plan phases are required -
initial land disturbance phase - construction phase - stabilization phase

-All compliance inspection must include invesg. of, at a minimum of 5 of the following - -1.
areas of site disturbed by construction activity and areas used for storage of materials
exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are
inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

-inspection frequency after construction begins - -at least once a week or within 24 hours
of end of storm event >0.5 inches

-Inspection frequency for sites that have reached temporary stablization - -Once every
month

-Linear site inspection - -linear activites may limit access to disturbed areas, in such cases
representative inspections may be performed

-representative inspections (linear site inspection) - -personnel must investigate BMP's
along the site for 0.25 miles above and below each access point where the site intersects
with -roadway - undisturbed right of way - other similar feature- Condition along each
inspected segment are considered "respresentative" along that reach of construction

-permittees must record rainfall events of - -0.5 inches or greater

-where should rainfall records be kept - -maintained in rain log located as part of the OS-
SWPPP

-Inspection reports of rainfall must be - -reported on each weekly inspection report and
maintained in rain log

-For each compliance inspecton a report must be completed and include at a mininum - -1.
Inspection date
2. Name, title, qualification of inspector
3. Weather information for period since last inspection
4.Weaher information and description of any discharges occurring at time of inspection.
5. Locations(s) of discharges of sediment or other pollutants leaving the site.
6. Location(s) of BMP's that need maintenance only.

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
September 23, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
CEPSCI EXAMS (Certified Erosion Prevention and Sediment Control Inspector)
-
3 2025
$ 20.99 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AccurateScores Not yet listed
View profile
Follow You need to be logged in order to follow users or courses
Sold
585
Member since
3 year
Number of followers
336
Documents
15251
Last sold
6 days ago

3.7

122 reviews

5
56
4
20
3
18
2
11
1
17

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions