NICET LEVEL 1 HIGHWAY
| | | |
CONSTRUCTION exam with correct detailed | | | | |
answers
Acceptance |- | |correct |answers |The |written |acceptance |by |the |Department |of |the |Work.
acceptance |testing |- | |correct |answers |Testing |conducted |by |the |Department |to |measure |the |
degree |of |compliance |to |the |Contract
actual |cost |- | |correct |answers |The |computed |cost |using |calculations |provided
addendum |- | |correct |answers |A |Contract |revision |or |response |to |a |Contractor |inquiry |issued |
after |advertisement |and |before |the |opening |of |bids.
as-built |quantity |- | |correct |answers |The |quantity |of |a |completed |Item |eligible |for |payment
authorized |funding |amount |- | |correct |answers |The |amount |of |funds |authorized |by |the |
Department |for |the |Contract
Bidder |- | |correct |answers |The |individual, |firm, |partnership, |corporation, |joint |venture, |or |any |
acceptable |combination |thereof |that |submits |a |bid |to |the |Department.
bridge |- | |correct |answers |. |A |structure, |other |than |a |culvert, |including |supports, |erected |over |a
|depression |or |an |obstruction, |such |as |water, |highway, |or |railway, |and |having |a |track |or |
passageway |for |carrying |traffic |or |other |moving |loads |and |having |a |length |3 |measured |along |
the |center |of |the |structure |of |more |than |20 |feet |between |undercopings |of |abutments |or |
extreme |ends |of |openings |for |multiple |boxes. |Structure |dimensions |are |defined |as |follows:
, bridge |length |- | |correct |answers |The |overall |length |measured |along |the |line |of |survey |
stationing |from |back |to |back |of |backwalls |of |abutments, |if |present, |otherwise |end |to |end |of |
the |bridge |floor; |but, |in |no |case |less |than |the |total |clear |opening |of |the |structure
bridge |width |- | |correct |answers |The |clear |width |measured |at |right |angles |to |the |longitudinal |
centerline |of |the |bridge |between |the |bottom |of |curbs, |or |in |the |case |of |multiple |height |of |
curbs, |between |the |bottoms |of |the |lower |risers |or, |if |curbs |are |not |used, |between |inner |faces |
of |parapet |or |railing
Change |Order. |- | |correct |answers |A |written |order |issued |by |the |Department |to |the |Contractor |
after |execution |of |the |Contract |authorizing |one |or |more |of |the |following: |1. |Changes |in |the |
Work. |2. |Modifications |in |the |basis |of |payment. |3. |Modifications |to |Contract |Time.
Commercially |Useful |Function |- | |correct |answers |Occurrences |in |which |the |subcontractor |is |
responsible |for |the |execution |of |a |distinct |element |of |the |work |of |a |contract |and |carrying |out |
its |responsibilities |by |actually |performing, |managing, |and |supervising |the |work |involved, |and |
with |respect |to |materials |and |supplies |used |on |the |contract, |prepares |the |estimate, |negotiates
|price, |determines |quality |and |quantity, |orders |the |material, |arranges |delivery, |installs |(where |
applicable), |and |pays |for |the |material |and |supplies |itself |for |the |project.
Completion |- | |correct |answers |When |all |of |the |following |have |occurred: |1. |The |Work |has |been
|satisfactorily |completed |in |all |respects |according |to |the |Contract. |2. |The |Project |is |ready |for |
use |by |the |Department |as |required |by |the |Contract. |3. |The |Contractor |has |satisfactorily |
executed |and |delivered |to |the |RE |all |documents, |certificates, |and |proofs |of |compliance |
required |by |the |Contract |including |the |Notice |of |Completion.
construction |operations |- | |correct |answers |Physical |work |done |in |the |performance |of |the |
Contract |within |the |Project |Limits. |Does |not |include |off-site |mobilization, |procurement |and |
off-site |storage |of |materials |and |plants, |engineering, |performance |bond |and |payment |bond, |
surveys, |working |drawings, |off-site |field |offices, |schedules, |certificates, |forms, |or |documents
| | | |
CONSTRUCTION exam with correct detailed | | | | |
answers
Acceptance |- | |correct |answers |The |written |acceptance |by |the |Department |of |the |Work.
acceptance |testing |- | |correct |answers |Testing |conducted |by |the |Department |to |measure |the |
degree |of |compliance |to |the |Contract
actual |cost |- | |correct |answers |The |computed |cost |using |calculations |provided
addendum |- | |correct |answers |A |Contract |revision |or |response |to |a |Contractor |inquiry |issued |
after |advertisement |and |before |the |opening |of |bids.
as-built |quantity |- | |correct |answers |The |quantity |of |a |completed |Item |eligible |for |payment
authorized |funding |amount |- | |correct |answers |The |amount |of |funds |authorized |by |the |
Department |for |the |Contract
Bidder |- | |correct |answers |The |individual, |firm, |partnership, |corporation, |joint |venture, |or |any |
acceptable |combination |thereof |that |submits |a |bid |to |the |Department.
bridge |- | |correct |answers |. |A |structure, |other |than |a |culvert, |including |supports, |erected |over |a
|depression |or |an |obstruction, |such |as |water, |highway, |or |railway, |and |having |a |track |or |
passageway |for |carrying |traffic |or |other |moving |loads |and |having |a |length |3 |measured |along |
the |center |of |the |structure |of |more |than |20 |feet |between |undercopings |of |abutments |or |
extreme |ends |of |openings |for |multiple |boxes. |Structure |dimensions |are |defined |as |follows:
, bridge |length |- | |correct |answers |The |overall |length |measured |along |the |line |of |survey |
stationing |from |back |to |back |of |backwalls |of |abutments, |if |present, |otherwise |end |to |end |of |
the |bridge |floor; |but, |in |no |case |less |than |the |total |clear |opening |of |the |structure
bridge |width |- | |correct |answers |The |clear |width |measured |at |right |angles |to |the |longitudinal |
centerline |of |the |bridge |between |the |bottom |of |curbs, |or |in |the |case |of |multiple |height |of |
curbs, |between |the |bottoms |of |the |lower |risers |or, |if |curbs |are |not |used, |between |inner |faces |
of |parapet |or |railing
Change |Order. |- | |correct |answers |A |written |order |issued |by |the |Department |to |the |Contractor |
after |execution |of |the |Contract |authorizing |one |or |more |of |the |following: |1. |Changes |in |the |
Work. |2. |Modifications |in |the |basis |of |payment. |3. |Modifications |to |Contract |Time.
Commercially |Useful |Function |- | |correct |answers |Occurrences |in |which |the |subcontractor |is |
responsible |for |the |execution |of |a |distinct |element |of |the |work |of |a |contract |and |carrying |out |
its |responsibilities |by |actually |performing, |managing, |and |supervising |the |work |involved, |and |
with |respect |to |materials |and |supplies |used |on |the |contract, |prepares |the |estimate, |negotiates
|price, |determines |quality |and |quantity, |orders |the |material, |arranges |delivery, |installs |(where |
applicable), |and |pays |for |the |material |and |supplies |itself |for |the |project.
Completion |- | |correct |answers |When |all |of |the |following |have |occurred: |1. |The |Work |has |been
|satisfactorily |completed |in |all |respects |according |to |the |Contract. |2. |The |Project |is |ready |for |
use |by |the |Department |as |required |by |the |Contract. |3. |The |Contractor |has |satisfactorily |
executed |and |delivered |to |the |RE |all |documents, |certificates, |and |proofs |of |compliance |
required |by |the |Contract |including |the |Notice |of |Completion.
construction |operations |- | |correct |answers |Physical |work |done |in |the |performance |of |the |
Contract |within |the |Project |Limits. |Does |not |include |off-site |mobilization, |procurement |and |
off-site |storage |of |materials |and |plants, |engineering, |performance |bond |and |payment |bond, |
surveys, |working |drawings, |off-site |field |offices, |schedules, |certificates, |forms, |or |documents