Nicet test 2 questions with precise detailed
| | | | | | |
answers
Which |set |of |documentation |is |required |to |be |maintained |and |retained |for |the |life |of |the |
system?
as |built |drawings, |hydraulic |calculations, |original |acceptance |test |records, |and |device |
manufacturer's |data |sheets
as |built |drawings, |hydraulic |data |plate, |and |annual |maintenance |and |test |records
inspection |reports, |test |records, |and |maintenance |as |required |by |the |standard
installation |drawings, |permit |applications, |and |submittals |signed |by |the |Authority |Having |
Jurisdiction |(AHJ) |- | |correct |answers |a
What |provisions |must |be |made |for |a |main |drain |test?
shut |down |fire |pump
shut |down |jockey |pump
shut |down |main |control |valve
verify |adequate |drainage |- | |correct |answers |c
Which |set |of |steps |are |taken |when |an |inspector |notices |that |the |air |gauge |on |a |freezer |is |
lower |than |the |air |gauge |on |a |supply/air |compressor?
The |air |line |in |service |is |shut |down |and |the |ice |block |is |removed. |If |the |ice |block |cannot |be |
totally |removed |then |the |alternate |air |line |is |opened |and |used.
The |dry |valve |or |pre-action |system |is |shut |down |and |the |air |lines |are |dismantled |to |remove |
the |ice |block.
The |gauges |are |replaced |with |new |gauges. |If |the |gauges |still |do |not |match |pressure, |the |
alternate |air |line |is |opened |to |increase |pressure.
, The |inspector |takes |the |in-service |air |line |out |of |service |and |the |alternate |air |line |is |opened |to
|equalize |the |pressure |on |the |system. |The |out-of-service |air |line |is |taken |apart |and |the |ice |
block |is |removed |and |used |as |future |alternate |air |line. |- | |correct |answers |d?
In |a |building |with |multiple |wet |pipe |systems, |for |how |many |systems |and |at |what |frequency |
are |internal |inspections |of |piping |required?
every |other |system |every |2 |years
every |other |system |every |5 |years
every |system |every |2 |years
every |system |every |5 |years |- | |correct |answers |b
After |an |impariment |has |been |restored, |who |shall |verify |that |all |conditions |have |been |
addressed |in |order |to |remove |an |impairment |tag?
alarm |company |representative
Authority |Having |Jurisdiction |(AHJ)
fire |department |official
impairment |coordinator |- | |correct |answers |d
An |inspection |company |is |performing |its |first |inspection |of |an |existing |warehouse |owned |by |a |
new |client. |The |warehouse |has |rack |storage |with |large |sprinklers |near |the |roof. |The |spare |
sprinkler |cabinet |is |empty. |The |sprinklers |near |the |roof |are |within |20 |to |28 |inches |from |the |
top |of |the |storage.After |noting |that |the |sprinkler |cabinet |needs |to |be |replenished, |what |
should |be |recommended?
call |for |an |engineering |evaluation
have |the |storage |moved |down |to |a |36-inch |clearance
have |the |storage |moved |down |to |a |48-inch |clearance
no |further |action |is |needed; |the |head |clearance |is |correct |- | |correct |answers |a?
| | | | | | |
answers
Which |set |of |documentation |is |required |to |be |maintained |and |retained |for |the |life |of |the |
system?
as |built |drawings, |hydraulic |calculations, |original |acceptance |test |records, |and |device |
manufacturer's |data |sheets
as |built |drawings, |hydraulic |data |plate, |and |annual |maintenance |and |test |records
inspection |reports, |test |records, |and |maintenance |as |required |by |the |standard
installation |drawings, |permit |applications, |and |submittals |signed |by |the |Authority |Having |
Jurisdiction |(AHJ) |- | |correct |answers |a
What |provisions |must |be |made |for |a |main |drain |test?
shut |down |fire |pump
shut |down |jockey |pump
shut |down |main |control |valve
verify |adequate |drainage |- | |correct |answers |c
Which |set |of |steps |are |taken |when |an |inspector |notices |that |the |air |gauge |on |a |freezer |is |
lower |than |the |air |gauge |on |a |supply/air |compressor?
The |air |line |in |service |is |shut |down |and |the |ice |block |is |removed. |If |the |ice |block |cannot |be |
totally |removed |then |the |alternate |air |line |is |opened |and |used.
The |dry |valve |or |pre-action |system |is |shut |down |and |the |air |lines |are |dismantled |to |remove |
the |ice |block.
The |gauges |are |replaced |with |new |gauges. |If |the |gauges |still |do |not |match |pressure, |the |
alternate |air |line |is |opened |to |increase |pressure.
, The |inspector |takes |the |in-service |air |line |out |of |service |and |the |alternate |air |line |is |opened |to
|equalize |the |pressure |on |the |system. |The |out-of-service |air |line |is |taken |apart |and |the |ice |
block |is |removed |and |used |as |future |alternate |air |line. |- | |correct |answers |d?
In |a |building |with |multiple |wet |pipe |systems, |for |how |many |systems |and |at |what |frequency |
are |internal |inspections |of |piping |required?
every |other |system |every |2 |years
every |other |system |every |5 |years
every |system |every |2 |years
every |system |every |5 |years |- | |correct |answers |b
After |an |impariment |has |been |restored, |who |shall |verify |that |all |conditions |have |been |
addressed |in |order |to |remove |an |impairment |tag?
alarm |company |representative
Authority |Having |Jurisdiction |(AHJ)
fire |department |official
impairment |coordinator |- | |correct |answers |d
An |inspection |company |is |performing |its |first |inspection |of |an |existing |warehouse |owned |by |a |
new |client. |The |warehouse |has |rack |storage |with |large |sprinklers |near |the |roof. |The |spare |
sprinkler |cabinet |is |empty. |The |sprinklers |near |the |roof |are |within |20 |to |28 |inches |from |the |
top |of |the |storage.After |noting |that |the |sprinkler |cabinet |needs |to |be |replenished, |what |
should |be |recommended?
call |for |an |engineering |evaluation
have |the |storage |moved |down |to |a |36-inch |clearance
have |the |storage |moved |down |to |a |48-inch |clearance
no |further |action |is |needed; |the |head |clearance |is |correct |- | |correct |answers |a?